Napoleon Grills GS 50-N, GDS 50-N, GDS 50-P, GS 50-P manual Replacement Blower Installation

Page 19

19

REPLACEMENT BLOWER INSTALLATION

FIGURE 44

RELIEF DOOR GASKET

FIGURE 45

BLOW

ER

THERMODISC

RELIEF DOOR

 

 

 

e

 

 

 

 

it

 

 

d

 

 

h

 

 

n

 

 

w

 

 

 

u

 

 

k

 

 

 

 

 

 

 

g

r

o

 

 

la

 

 

 

 

b

 

 

 

 

 

 

 

 

VARIABLE

SPEED

SWITCH

TWIN BLOW

1.Turn off the electrical power and the gas supply to the stove.

2.Open the lower louvre control door, the two side doors, and the fire viewing door. Remove the logs.

3.Remove the relief door held on with 6 screws. Discard the gasket.

4.Disconnect the two blower wires. Remove the blower bracket held on with 4 screws.

5.Replace the blower using the existing bracket. When connecting the replacement blower, tighten the screws with- out distorting the rubber grommets. Replace the bracket/ blower assembly on the unit.

6.Reconnect the two wires. Hold the replacement gasket in place and reattach the relief door body. Replace the logs. Close all doors.

7.Turn the gas supply and electricity back on.

Because the blower is thermally activated, when turned on, it will automatically start approximately 15-30 min- utes after lighting the stove and will run for approximately 30-45 minutes after the stove has been turned off. Use of the fan increases the output of heat.

Drywall dust will penetrate into the blower bearings caus- ing irreparable damage and must be prevented from coming into contact with the blower or its compartment. Any damage resulting from this condition is not covered by the warranty policy.

W415-0098 / A / 08.07.03

Image 19 Contents
GAS-FIRED Stoves Table of Contents Napoleon GAS Fireplace Presidents Lifetime Limited Warranty General Information General InstructionsCare of GLASS, and Plated Parts GDS50 and GS50 Location & ClearancesVenting Lengths AIR Terminal Locations Direct Vent Specifics Model GDS50AIR Terminal Installations Special Installation Example Offset Installation ExampleHorizontal Wall and Ceiling Protection Horizontal Installation Vertical InstallationW415-0098 / a Stove Vent Connection Mobile Home Installation Continue with Gas InstallationAdding Vent Sections Chimney InstallationInstalling B Vent Vent Specifics Model GS50TWO Screws Must be RE-SECURED. Figure Installing Flashing Storm CollarVent Adaptations Combustion AIRGAS Installation Mantle Clearance Trivet InstallationFinishing Door Opening and ClosingLOG Placement Operating Instructions Operation / MaintenanceSpill Switch Turbo Burner Operation MaintenanceFor Your Safety Read Before Lighting Blow Replacement Blower InstallationFront Burner Rear Burner AdjustmentsPilot Burner Adjustment Venturi Adjustment# Description ReplacementsPage Symptom Problem Test Solution Trouble Shooting GuideModel GDS50 only