7. Venting and Combustion Air (cont'd)

7B. Venting and Combustion Air Requirements for Power Vent Drawing Combustion Air from THE INSIDE SPACE and Venting Flue Products to the Outdoors (vent cap is required)

If the environment has a positive pressure and is such that it is not detrimental to combustion air, this system may be installed. To provide combustion air to the heater sufficient air must enter the equipment location to replace that exhausted through the heater vent system. In the past, the infiltration of outside air assumed in heat loss calculations (one air change per hour) was assumed to be sufficient. However, current construction methods using more insulation, vapor barriers, tighter fitting and gasketed doors and windows, weather-stripping, and/or mechanical ex- haust fans may now require the introduction of outside air through wall openings or ductwork to the equipment room.

The requirements for combustion and ventilation air depend upon whether the unit is located in a confined or unconfined space. An "unconfined space" is defined as a space whose volume is not less than 50 cubic feet per 1000 BTUH of the installed appliance. Under all conditions, enough air must be provided to ensure there will not be a negative pressure condition within the equip- ment room or space. Follow the specific requirements below for a confined space installation.

Confined Space Installation - Do not install a unit in a con- fined space without providing wall openings leading to and from the space. Provide openings near the floor and ceiling for ventila- tion and air for combustion as shown in Figure 7, depending on the combustion air source as noted in Items 1, 2, and 3 below.

Figure 7 - Confined Space:

A space whose volume is less than 50 cubic feet per 1000 BTUH of the installed appliance input rating

Add total BTUH of all appliances in the confined space and divide by figures below for square inch free area size of each (top and bottom) opening.

1.Air from inside the building -- openings 1 square inch free area per 1000 BTUH. Never less than 100 square inches free area for each opening. See (1) in Figure 7.

2.Air from outside through duct -- openings 1 square inch free area per 2000 BTUH. See (2) in Figure 7.

3.Air direct from outside -- openings 1 square inch free area per 4000 BTUH. See (3) in Figure 7.

NOTE: For further details on supplying combustion air to a confined space, see the National Fuel Gas Code ANSI Z223.1a (latest edition).

Specific Venting Requirements (read all

before installing)

1) Venter (Flue) Outlet

 

Venter

 

 

 

Model Size

150, 200, 250

300, 350, 400

Outlet

Outlet Diameter

5"

6"

Size:

 

 

 

Venter Outlet Attachment Requirements:

A minimum of 12" of straight pipe is required at the venter outlet before installing an elbow in the vent system. An elbow should never be attached directly to the venter. An elbow attached to the straight pipe can be in any position at or above horizontal. See Figure 8.

Figure 8 - Alternate

Vent in any

Vent Directions

position above

 

horizontal

 

A minimum of 12" of straight pipe is required before an elbow

Do not install dampers or any other type of flue restrictor device.

2)Vent Pipe Diameter and Length

Maximum Vent Length - minimum length is 5 ft (1.5M)

CAUA

Pipe

Maximum

90° Elbow

45° Elbow

 

Diameter

 

Length

 

Equals*

Equals*

150-250

5"

50

ft (15.2M)

5

ft

(1.5M)

2.5

ft (.8M)

300-400

6"

50

ft (15.2M)

5

ft

(1.5M)

2.5

ft (.8M)

 

 

 

 

 

 

 

 

 

*Reduce by this amount for each elbow.

Note: If the system contains all vertical pipe or a combination of horizontal and vertical vent pipe, the Maximum Permissible Vent Length may be in- creased one foot (305mm) for each foot (305mm) of vertical rise up to a maximum increase of ten feet (3M).

3)Vent Pipe and Joints

Provide field-supplied vent pipe as specified in the Table on page 4.

If using single wall, 26-gauge or heavier galvanized pipe, secure slip-fit connections using sheet metal screws or rivets. Seal pipe joints either with tape suitable for 550°F (such as Option FA1, P/N 98266) or high-tem- perature silicone sealant.

If using Category III vent pipe, follow pipe manufacturer's instructions for joining pipe sections. When attaching Category III pipe to the venter outlet or the vent cap, make secure, sealed joints following a procedure that best suits the style of Category III pipe being used.

If using double-wall (Type B) vent pipe (at least 1/2 of the equivalent vent length must be vertical), follow pipe manufacturer's instructions for join- ing pipe sections. For joining double-wall pipe to the venter outlet collar, single-wall pipe, and/or the vent cap, follow the instructions below:

Instructions for attaching double-wall (Type B) vent pipe to the ven- ter outlet, a single-wall pipe run, or to the vent cap (use these in- structions for either full length double-wall or terminal only):

Hardware and Sealant Required: 3/4" long sheetmetal screws; and a tube of high temperature silicone sealant

1)Look for the "flow" arrow on the vent pipe; attach according to the arrow. Slide the pipe so that the venter outlet, the single-wall pipe, or the vent cap is inside the double-wall pipe.

2)Drill a hole through the pipe into the outlet collar, the single-wall pipe, or the vent cap. (Hole should be slightly smaller than the sheet metal screw being used.) Using a 3/4" long sheet metal screw, attach the pipe. Do not overtighten. Repeat, drilling and inserting two additional screws evenly spaced (120° apart) around the pipe.

3)Use silicone sealant to seal any gaps. If there is an annular opening, run a large bead of sealant in the opening. The bead of sealant must be large enough to seal the opening, but it is not necessary to fill the full volume of the annular area.

4)Vent System Support

Lateral runs should be supported every six feet (1.8M) using a non-combus- tible material, such as strap steel or chain. Do not rely on the heater for support of either horizontal or vertical vent pipe.

Form 405, Page 10

Image 10
Contents Table of Contents Model CauaGeneral Contd Installation CodesWarranty Clearances Mounting the HeaterDimensions mm +or DimensionsDimensions inches + or 1/8 Air Opening DimensionsCommercial Decide which Venting System to InstallVenting and Combustion Air Indus TrialVenter Outlet Combustion Air InletConcentric Adapter Support Venting and Combustion Air contdJoints ClearanceOn the outside Flash or caulkInlet air pipe Wall2b Install the rubber seal Installation Instructions for Option CC2Side View Exhaust 559mm minimum SnowClearance TerminalVent Pipe Diameter and Length Vent Pipe and JointsVenter Flue Outlet Vent System SupportVent Terminal Pipe and Vent Cap CondensationHorizontal Vent Terminal Clearances Cut edges of the metal will be sharp Duct Connections and DuctworkSize 150 250 350 36 914mm 48 1219mm 21 533mm 34 864mm Sizing a Gas Supply Line Manifold or Orifice Pressure SettingsGas Piping and Pressures Supply PipingBurner Condensate Drain Manifold Pressure Settings contdGas Piping and Pressures contd Electrical Supply and ConnectionsDirect Drive Combustion Air Proving SwitchBlower Motor and Drive Belt DriveGas Valve Adjusting Blower SpeedBlower Motor and Drive contd Ignition SystemTypical Wiring Diagrams Typical Wiring Diagrams contd Burner Condensate Drain Low Voltage Wiring field-suppliedOptional Cased Cooling Coil, Model ACUA, ACUB, or Acuc Electrical ConnectionsMixing Cabinet Outside and Return Air Inlet Base Sizes 350 and 400 only Discharge Plenum Sizes400 only Optional Outside Air Return Air Mixing BoxStart-Up Check/Test/Start-Up Check Installation & Start-UpCheck the installation prior to start-up 250Check installation after start-up To Turn OFF GAS to the ApplianceManufacturer of HEATING, COOLING, and Ventilating Systems