Maintenance And Service
Fuel Conversion:
TO BE INSTALLED BY A QUALIFIED SERVICE AGENCY ONLY
Please read and understand these instructions before installing.
Warning: This conversion kit shall be installed by a qualified service agency in accordance with the manufacturer’s instructions and all applicable codes and requirements of the authority having jurisdiction. If the information in these instructions is not followed exactly, a fire, explosion or production of carbon monoxide may result causing property damage, personal injury or loss of life. The qualified service agency is responsible for the proper installation of this kit. The installation is not proper or complete until the operation of the converted appliance is checked as specified in the manufacturer’s instructions supplied with the kit.
Kit Parts List:
Orifice (NG -
Carefully inspect all parts supplied with this conversion kit. If any parts have been damaged or are missing, contact your dealer, distributor or courier company to have them replaced before starting this installation.
Conversion Kit Installation:
1.Turn control knob on the gas valve to the “OFF” position and shut the gas supply off at the
2.Remove the glass door as shown in the Maintenance and
Service - Glass Door Removal.
3.Carefully remove the log set.
4.Slide the burner back just far enough so the front edge of the burner does not catch on the front lip of the firebox. Lift the front of the burner up and out of the firebox. See
Maintenance and Service - Burner Removal & Installation.
5.Convert the burner orifice:
a)Remove the main burner orifice with a ⅜” socket (refer to Figure 14).
b)Install the alternate orifice from the kit.
6.Convert the pilot injector:
a)Loosen the pilot stem a half turn using a 7/16” wrench (refer to Figure 15).
b)Slide the tab to the other side of the pilot stem (refer to Figures 16 & 17).
c)Tighten the pilot stem.
Figure 14: Removing the orifice.
Figure 15: Turning Pilot Stem.
Figure 16: NG & LP Gas Positions on Pilot.
12