Enviro C-11500 owner manual Kit Parts List, Conversion Kit Installation

Page 12

Maintenance And Service

Fuel Conversion:

TO BE INSTALLED BY A QUALIFIED SERVICE AGENCY ONLY

Please read and understand these instructions before installing.

Warning: This conversion kit shall be installed by a qualified service agency in accordance with the manufacturer’s instructions and all applicable codes and requirements of the authority having jurisdiction. If the information in these instructions is not followed exactly, a fire, explosion or production of carbon monoxide may result causing property damage, personal injury or loss of life. The qualified service agency is responsible for the proper installation of this kit. The installation is not proper or complete until the operation of the converted appliance is checked as specified in the manufacturer’s instructions supplied with the kit.

Kit Parts List:

Orifice (NG - PO512-42 DMS or LP - PO512-54 DMS) Installation instruction sheet

Carefully inspect all parts supplied with this conversion kit. If any parts have been damaged or are missing, contact your dealer, distributor or courier company to have them replaced before starting this installation.

Conversion Kit Installation:

1.Turn control knob on the gas valve to the “OFF” position and shut the gas supply off at the shut-off valve upstream of the unit. CAUTION: The gas supply must be shut off prior to disconnecting the electrical power and before proceeding with the conversion. Allow the valve and unit to cool down to room temperature.

2.Remove the glass door as shown in the Maintenance and

Service - Glass Door Removal.

3.Carefully remove the log set.

4.Slide the burner back just far enough so the front edge of the burner does not catch on the front lip of the firebox. Lift the front of the burner up and out of the firebox. See

Maintenance and Service - Burner Removal & Installation.

5.Convert the burner orifice:

a)Remove the main burner orifice with a ⅜” socket (refer to Figure 14).

b)Install the alternate orifice from the kit.

6.Convert the pilot injector:

a)Loosen the pilot stem a half turn using a 7/16” wrench (refer to Figure 15).

b)Slide the tab to the other side of the pilot stem (refer to Figures 16 & 17).

c)Tighten the pilot stem.

Figure 14: Removing the orifice.

Figure 15: Turning Pilot Stem.

Figure 16: NG & LP Gas Positions on Pilot.

12

Image 12
Contents Cara DR Safety Precautions GeneralTable of Contents Codes And Approvals Vented GAS Fireplace Heater Cara DR DV NG/LPGThis Enviro Cara DR Fireplace Specifications Cara DR Exterior DimensionsFor Your Safety Read Before Operating Operating InstructionsCara Component Sound & Reason Maintenance And Service Pilot FlameNo substitute materials are allowed Check burner for proper operation Kit Parts List Conversion Kit InstallationCheck that the screw is clean and if necessary remove dirt Initial Installation Qualified Installers onlyManufacturer Trade Name Nominal Sizes Vent Termination Restrictions 51mm at top, 1½ 38mm at sides, 1½ 38mm at bottom Twist-LockSurface Attach With Installation for Cara DR Venturi Setting Natural Gas Propane Main BurnerManifold Pressure Min. Manifold PressureWire Size Max. Length Canadian InstallationsA. Installations Optional Blower Fan Installation Keep Clear of ALL Obstructions Initial Installation Secondary Installation Log Placement of Rear Log ChunksLog Placement of Left Log Remove door to clean glass Addition the seven 7 small rocks. These can be To clean glass Trouble Shooting Problem Possible Cause SolutionParts List Reference Part Description Part NumberParts List Parts Diagram Warranty To the DealerWarranty Warranty Installation Data Sheet