Desa CGN10R installation manual Placing Heater On Mounting Screws

Page 12

12

INSTALLING TO WALL

Continued

Placing Heater On Mounting Screws

1.Locate two keyhole slots on back panel of heater (see Figure 9).

2.Place large openings of slots over screwheads. Slide heater down until screws are in small portion of slots.

Keyhole

Slots

Figure 9 - Location Of Keyhole Slots On Back Panel Of Heater

Removing Front Panel Of Heater

1.Remove two screws near bottom corners of front panel.

2.Lift straight up on grill guard until it stops. Grill guard will slide up about 1/4".

3.Pull bottom of front panel forward, then down.

Figure 10 - Removing Front Panel Of Heater

Installing Bottom Mounting Screw

1.Locate bottom mounting hole. This hole is near bottom on back panel of heater (see Figure 11).

2.Mark screw location on wall.

3.Remove heater from wall.

4.If installing bottom mounting screw into hollow or solid wall, install wall anchor. Follow steps 1 through 5 under Attaching To Wall Anchor Method, page 11.

If installing bottom mounting screw into wall stud, drill hole at marked location using 9/64" drill bit.

5.Replace heater on wall.

6.Insert bottom anchor screw through back panel into bottom anchor or drilled hole (see Figure 11).

7.Tighten screw until heater is firmly secured to wall. Do not over tighten. Note: Do not replace front panel at this time. Replace front panel after making gas connections and checking for leaks (see pages 13-15).

Figure 11 - Installing Bottom Mounting Screw

101867

Image 12
Contents OWNER’S Operation and Installation Manual What to do if YOU Smell GASContents Safety Information Safety Information Local Codes Unpacking Product Features Safety DeviceProduct Identification Piezo Ignition SystemFresh AIR for Combustion and Ventilation Providing Adequate VentilationUnusually Tight Construction Unconfined SpaceDetermining FRESH-AIR Flow for Heater Location Determining if You Have a Confined or Unconfined SpaceVentilation AIR Ventilation Air From Inside BuildingVentilation Air From Outdoors Ventilation Air from OutdoorsInstallation Items Check GAS TypeLocating Heater Installing Heater to Wall Marking Screw LocationsInstalling Two Mounting Screws Folding AnchorPlacing Heater On Mounting Screws Connecting to GAS Supply Connecting Pressure Testing GAS Supply Piping SystemTo GAS Supply Checking GAS ConnectionsPressure Testing Heater GAS Connections Manual Shutoff ValveFor Your Safety Read Before Lighting Operating HeaterPilot To Select Heating Level Manual Lighting Procedure Operating Heater Inspecting BurnerTo Turn OFF GAS to Appliance Pilot Flame PatternBurner Flame Pattern Correct Burner Flame PatternCleaning and Maintenance Trouble Shooting ODS/PILOT and Burner OrificeCabinet Air PassagewaysSee Cleaning TROUBLE- ShootingMaintenance , TROUBLE- Shooting Technical Service Ing statement atTop Service Hints Replacement Parts Parts Under WarrantyParts Not Under Warranty Service Publications Accessory Parts CentralsValve GA5010 Parts List CGN10R Illustrated Parts BreakdownWarranty Information Keep this Warranty