Desa CGN10R installation manual Pilot

Page 17

OPERATING HEATER

Continued

4.Wait five (5) minutes to clear out any gas. Then smell for gas, including near the floor. If you smell gas, STOP! Follow “B” in the safety information at the top of page 16. If you don’t smell gas, go to the next step.

5. Press in control knob, and turn counterclockwise C-clockwiseto pilot position.

Keep control knob pressed for five seconds.

Note: You may be running this heater for the first time after hooking up to gas supply. If so, the control knob may need to be pressed in for 30 seconds. This will allow air to bleed from the gas system.

If control knob does not pop up when released, contact a qualified service person or gas supplier for repairs.

6.With control knob pressed in, push down and release ignitor button. This will light pilot. The pilot is attached to the front of burner. If needed, keep pressing ignitor button until pilot lights.

Note: If pilot does not light, refer to Troubleshooting, pages 21 through

24.Also contact a qualified service person or gas supplier for repairs. Until repairs are made, light pilot with match, see Manual Lighting Procedure, page 19.

Ignitor Electrode

Pilot Burner

Thermocouple

Figure 16 - Pilot

7.Keep control knob pressed in for 10 seconds after lighting pilot. After 10 seconds, release control knob.

Note: If pilot goes out, repeat steps 3 through 7.

Continued

17

 

101867

Image 17
Contents What to do if YOU Smell GAS OWNER’S Operation and Installation ManualContents Safety Information Safety Information Safety Device Local Codes Unpacking Product FeaturesProduct Identification Piezo Ignition SystemProviding Adequate Ventilation Fresh AIR for Combustion and VentilationUnusually Tight Construction Unconfined SpaceDetermining if You Have a Confined or Unconfined Space Determining FRESH-AIR Flow for Heater LocationVentilation Air From Inside Building Ventilation AIRVentilation Air from Outdoors Ventilation Air From OutdoorsLocating Heater Installation ItemsCheck GAS Type Marking Screw Locations Installing Heater to WallFolding Anchor Installing Two Mounting ScrewsPlacing Heater On Mounting Screws Connecting to GAS Supply Pressure Testing GAS Supply Piping System ConnectingTo GAS Supply Checking GAS ConnectionsManual Shutoff Valve Pressure Testing Heater GAS ConnectionsOperating Heater For Your Safety Read Before LightingPilot To Select Heating Level Operating Heater Inspecting Burner Manual Lighting ProcedureTo Turn OFF GAS to Appliance Pilot Flame PatternCorrect Burner Flame Pattern Burner Flame PatternODS/PILOT and Burner Orifice Cleaning and Maintenance Trouble ShootingCabinet Air PassagewaysTROUBLE- Shooting See CleaningMaintenance , Top TROUBLE- Shooting Technical ServiceIng statement at Parts Not Under Warranty Service Hints Replacement PartsParts Under Warranty Valve GA5010 Service Publications AccessoryParts Centrals Illustrated Parts Breakdown Parts List CGN10RKeep this Warranty Warranty Information