INSTALLATION
Checking Gas Connections (Cont.) Installing Logs
13
INSTALLATION |
|
Continued |
|
Equipment Shutoff Valve |
|
Gas Control | Propane/LP |
Valve Location | Supply Tank |
Figure 16 - Checking Gas Joints (Propane/LP only)
Equipment Shutoff Valve
Gas Control
Valve Location
Gas Meter
Figure 17 - Checking Gas Joints (Natural Gas Only)
INSTALLING LOGS
WARNING: Failure to position the parts in accor- dance with these diagrams or failure to use only parts specifically approved with this heater may result in property damage or personal injury.
CAUTION: After installation and periodically there- after, check to ensure that no flame comes in contact with any log. With the heater set to HI, check to see if flames contact any log. If so, reposition logs accord- ing to the log installation instructions in this manual. Flames contacting logs will create soot.
It is very important to install the logs exactly as instructed. Do not modify logs. Only use logs supplied with heater.
Variable Manually-Controlled Models (LSL)
1.Place rear log onto rear brackets making sure brackets fit into recess on bottom of log (see Figure 18).
2.Place left front log on grate fingers as shown in Figure 19. Place right front log on grate fingers and on left front log (see Figure 19).
3.Slide control cover log into position between two front logs as- suring the cover log seats into cutout section (see Figure 20).
|
| Right |
| Left Front | Front Log |
|
| |
Rear Log | Log |
|
Figure 18 - Rear Log | Figure 19 - Left and Right |
Placement (Variable | Front Log Placement (Variable |
Left Front Log |
|
Cover Log
Figure 20 - Control Cover Log Placement (Variable Manually- Controlled Models)
For morevisit www..com