Attach the flashing and termination cap to the top of the flexible vent pipe and set the cap in place. See Figures 4 and 5.

CAUTION: TO AVOID DOWNDRAFTS AND/OR COLD AIR PROBLEMS, IT IS RECOMMENDED TO SEAL OFF THE AREA BETWEEN THE TERMINATION CAP AND THE TOP OF THE SOLID- FUEL CHIMNEY OPENING INTO WHICH THE VENT CAP HAS BEEN IN- STALLED.

WHEN USING THE LINK-DV4-30 VENT SYSTEM, IT IS REQUIRED TO SEAL AROUND THE FLEXIBLE VENT PIPES IN THE DAMPER AREA. SEE FIGURE 4. USE FIBERGLASS INSULATION OR OTHER SUITABLE NON-COMBUSTI- BLE MATERIAL.

2 FT. MIN.

TERMINATION CAP

HORIZONTAL OVERHANG

2 FT. MIN.

VERTICAL WALL

 

LOWEST

DISCHARGE

OPENING

X

12

ROOF PITCH IS X/ 12

H (MIN.) - MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING

WARNING: MAJOR U.S. ! BUILDING CODES SPECIFY MINIMUM CHIMNEY AND/OR VENT HEIGHT ABOVE THE ROOF TOP. THESE MINIMUM HEIGHTS ARE NECESSARY IN THE INTEREST OF SAFETY. SEE THE FOLLOWING DIAGRAM FOR MINIMUM HEIGHTS, PROVIDED THE TERMINATION CAP IS AT LEAST 2-FEET FROM A VER- TICAL WALL AND 2-FEET BELOW

A HORIZONTAL OVERHANG.

NOTE: This also pertains to vertical vent systems installed on the outside of the building.

Roof Pitch

H (min.) ft.

flat to 6/12

1.0

6/12 to 7/12

1.25

over 7/12 to 8/12

1.5

over 8/12 to 9/12

2.0

over 9/12 to 10/12

2.5

over 10/12 to 11/12

3.25

over 11/12 to 12/12

4.0

over 12/12 to 14/12

5.0

over 14/12 to 16/12

6.0

over 16/12 to 18/12

7.0

over 18/12 to 20/12

7.5

over 20/12 to 21/12

8.0

Figure 3. Minimum Height from Roof to Lowest Discharge Opening

Quadra-FireQVI-30FB2020-900 Rev. H • 9/07

13

Image 13
Contents What to do if you smell gas QVI-30FBSafety and Warning Information Table of Contents Log Set Assembly Service PartsService Parts List Standing Pilot Valve Assembly Installation Codes High Altitude InstallationsAppliance Certification CertificationVent Directly BELOW. Keep Clear of ALL OB- Structions Requirements for the Commonwealth of MassachusettsManufacturer Requirements Introducing the Quadra-Fire Gas Appliances Pre-install PreparationDiagram of insert and minimum fireplace dimensions Diagram and model dimensions Rectly to the Exhaust Collar of the Unit Installing the Vent SystemMinimum Height from Roof to Lowest Discharge Opening Horizontal OverhangFactory installed to Stainless steel section Typical configuration of vent liners Gas Control System Positioning, Leveling, Securing the InsertGas Supply Line Connected to a Control Valve in a Millivolt SystemStanding Pilot Ignition Wiring Diagram Wiring the FireplaceGas Pressure Requirements Pressure Natural Gas PropaneJunction box installation To service or cleanServing the blower Installing Trim Surrounds Installing Logs and Ember MaterialShutter Settings Positioning the LogsBefore Lighting the Appliance Double-check for faulty componentsDouble-check vent terminations for obstructions Lighting the Appliance After the InstallationStanding Pilot Ignition What to do if YOU Smell GASCleaning Glass Door Appliance MaintenanceImportant Turn OFF the GAS Before Servicing Your Fireplace Replacing old ember materialTroubleshooting Be Placed in this Opening Lifetime Warranty