Quadra-Fire CASTILEI-CE-MBK Castile & Santa Fe CE Insert Panel and Trim Set, Completed View

Page 33

R

Castile & Santa Fe CE Insert

I. Panel and Trim Set

(SANTA FE INSERT)

1.Lay panel top and legs face down on protective cov- ering to prevent scratching.

1.Attach the panel legs to the top panel using a Phillips head screwdriver. There are 2 screws for each leg.

Figure 36.2.

2.Open the hopper lid by pulling toward you. This will make it easier to set the panels in place. Secure the panels to the insert, 2 screws per leg, as shown in

Figure 36.3.

3.Connect the trim pieces together using the “L” Brack- ets supplied. Figure 36.4.

4.Slide the trim over the top of the panels.

5.Install the access panels. At the bottom of the access panel there are 2 hooks that slip into a slot at the bottom of the side panel and a magnet at the top that holds the access panel in place. Figure 36.3.

Attach panel

legs to top

Figure 36.2

Open Hopper Lid for Easier Placement of Panel Set

Magnet

Access Panels

Hook

Figure 36.3

View of "L" Bracket

installed

Figure 36.1- Completed View

Figure 36.4

October 27, 2011

7069-101B

Page 33

Image 33
Contents Hot glass will cause burns Castile & Santa FE Pellet InsertWelcome to the Quadra-Fire Family Castile & Santa Fe CE InsertTable of Contents Castile & Santa Fe CE Insert Castile & Santa Fe CE Insert Glass Specifications SpecificationsListing and Code Approvals Appliance CertificationOperating Instructions User’s GuideCastile & Santa Fe CE Insert Fire Safety Combustible/Non-Combustible MaterialsFuel Material and Fuel Storage Before Your First Fire Castile & Santa Fe CE Insert General Operating InformationFilling the Hopper with Fuel Thermostat Calls For HeatFeed Rate Adjustment Instructions Fire CharacteristicsFeed Adjustment Control Rod Wing Nut Set Screw Castile & Santa Fe CE Insert Starting Your First FireDo not Leave Firepot Floor Open Castile & Santa Fe CE Insert Ignition Cycles Clear SpaceTypes of Fuel Quick Reference Maintenance ChartCleaning Ash Pan/Drawer Cleaning Firepot with Cleaning Rod & Firepot Clean-Out ToolSee .1 on Disposal of Ashes Frequency As needed Ash Removal from FireboxCleaning Beneath Heat Exchanger Cleaning Heat Exchanger Chambers & Drop TubeCleaning the Hopper Cleaning the GlassPreparing Firebox for Non-Burn Season Cleaning Combustion Blower Requires No LubricationDoor Latch Inspection Task Contact your local dealerTall, Lazy Flame, Orange in Color Frequently Asked Questions Troubleshooting for HomeownerGetting Started Appliance LocationFloor Support Tools And Supplies Needed Castile & Santa Fe CE Insert Thermostat LocationPre-Burn Check List Inspect Appliance and ComponentsAppliance Dimensions Dimensions and ClearancesMinimum Opening for Masonry and Factory-Built Fireplaces Castile & Santa Fe CE Insert Floor ProtectionPrefabricated Metal Chimney Vent Information Negative Pressure, Shut-Down and Electrical Power FailureVenting Termination Requirements Avoiding Smoke and OdorsNegative Pressure Vent ConfigurationsDraft Minimum Vacuum Requirements 095Castile & Santa Fe CE Insert Chimney and Exhaust Connection Miniumum Vertical Vent for Two Elbows Castile & Santa Fe CE Insert Pellet Venting ChartsFull Reline With Horizontal Outside Air Venting SystemsOutside Air Termination At Chimney Top Appliance Set-Up Leveling SystemOutside Air Kit Instructions Adjustable Hearth Support Castile & Santa Fe CE Insert Door Handle RemovalDoor Removal Install Front Last 34.2 Surround & Trim Set, EconoSheet metal screws on each side provided with the kit Castile & Santa Fe CE Insert Surround and Cast Trim SetCompleted View Castile & Santa Fe CE Insert Panel and Trim SetTwo Piece Log Set Installation Castile & Santa Fe CE Insert Thermostat Installation Contact Information