Monessen Hearth 7000 Series Vertical Venting with Two 2 45 Degree Elbow, Piping Installations

Page 12

VENT INSTALLATION

WARNING

Never use more than two (2) 45 degree elbows. When using adjustable elbows, never exceed 45 degrees.

Vertical Venting with Two (2) 45 Degree Elbow:

NOTE

V1 and V2 must satisfy this condition:

V1 + V2 < 40 feet Max.

V1 + V2 > 14 feet Min.

Figure 7: Horizontal Venting with Two (2) 45 Degree Elbow

INSTALLING VENT COMPONENTS

Before You Start:

Plan your installation. Set unit in place and survey how best to vent the unit. Select the appropriate pipe for the installation. Read this manual and the manual with the termination cap thoroughly before installing unit or vent system. After vent configuration has been decided, begin attaching pipe to unit.

Piping Installations:

1.Attached the first piece piping (elbow or straight pipe) to the pipe connector located above the fireplace. (Secure first section of pipe to damper colar with three (3) Srews).

2.Continue to add vent components. Be certain that each section is locked properly.

3.Where necessary add support brackets. Refer to the Figure 8. Incline runs must be supported every 3 feet. Vertical runs must be supported every 8 feet, using wall straps. Slip wall straps loosely on to pipe. Attach straps to framing members using nails or screws. Tighten nut/bolt to secure pipe.

11

Image 12
Contents Series Table of Contents Important Safety Information Important Safety InformationAlways Burn Propane Models with Doors Closed Product SPECIFICATIONS/LISTING & Code Approval Listing & Code ApprovalModel LAB Type Certification Standard PRE-INSTALLATION Information ContentsItems Required For Installations Tools Building Supplies Before You StartFireplace Dimensions PRE-INSTALLATION Information Combustible Clearances Mantel Clearances Mantel Clearance Floor ClearancesCombustible Vent Installation Vertical Venting Straight up No ElbowPiping Installations Vertical Venting with Two 2 45 Degree ElbowTo Locate and Install Ceiling Firestop Ceiling Firestop Location Vent Termination For Vertical TerminationTo Locate and install Vertical Termination Outside Air Kit InstallationGAS Line and Electrical Installation Do not use open flame to check for gas leaksStanding Pilot Ignition Wiring-Millivolt Control Remote Wall SwitchMillivolt Control Valve Checklist Optional DC Remote SystemsThermopile Output Check Complete Millivolt System CheckElectronic Pilot Ignition Wiring Wiring Diagram for Electronic Ignition SystemGAS Line and Electrical Installation Rock Wool Placement Lava Rock PlacementWall Finishing DefinitionsLog Placement for fiber VDY24/18D3R Log PlacementDoor Rail Installation Damper Operation Hi Temperature Cut Off Disc Operating Instructions Before Lighting the FireplaceLighting the Fireplace You may notice the followingFor Your Safety Read Before Lighting Lighting Instructions Millivolt ControlTo Turn OFF GAS to Appliance Lighting Instructions Electronic IGN Maintenance Standing-Pilot Flame OnlyBurner Flame Soot cleaning fluid may be used on refractory logs Vent SystemGlass Door Parts List / Illustrations Parts List / IllustrationVDY24/18D3R Description 4536 5142 Engine Components Conversion Kit Not Shown for Millivolt-Control OnlyConversion Kit Not Shown for Electronic Ignition Page Electronic Ignition General Troubleshooting Limited Lifetime Warranty Policy 41D2002 Rev 5 April