SEE-THROUGH INSTALLATION PROCEDURE

FRAMING

 

FACING

Note: In order to avoid the possibility of exposed insula- tion or vapour barrier coming in contact with the fireplace body, it is recommended that the walls of the fireplace enclosure be “finished” (ie: drywall/sheetrock), as you would finish any other outside wall of a home. This will ensure that clearance to combustibles is maintained within the cavity.

It is best to frame your fireplace after it is positioned and the vent system is installed. Use 2x4's and frame to local building codes. FIGURE 15.

See PAGE 8 for bar type / countertop installation.

FIGURE 15

A

A = 22" minus finishing material thickness, each side.

BRICK PANEL INSTALLATION

Install the base panels as illustrated in steps 1-4 on page

9.Both side panels sit under the bracket tab. Holding the side panel in position, bend down the tab to secure. [DE-

TAIL 6].

FIGURES 16 a-c

RETAINER

STEP 5

RETAINER

DETAIL 5 & 6

Combustible materials may be installed flush with the front of the fireplace but must not cover any of the black face- areas of the fireplace. Non-combustible material (brick, stone or ceramic tile) may protrude in these areas.

It is not necessary to install a hearth extension with this fireplace system.

When roughing in the fireplace, raise the fireplace to ac- commodate for the thickness of the finished floor materi- als, i.e. tile, carpeting, hard wood, which if not planned for will interfere with the opening of the lower access door and the installation of many decorative flashing accesso-

ries.

Objects placed in front of the fireplace should be kept a minimum of 48" away from the glass front faces of the fireplace.

FINISHING

Refer to pages 13-15 for complete instructions regarding mantle requirements and installations, log placement, glass door and upper and lower louvre attachments.

FIGURE 17

DRYWALL

DRYWALL

4" MIN

STEP 6

W415-0319 / E / 01.17.07

Image 11
Contents W415-0319 / E Table of Contents Conditions and Limitations American Nation Standards Institute Inc General InstructionsGeneral Information Carbon Monoxide Poisoning MAY Lead to DeathDetermining Confined or Unconfined Space InstallationCombustion and Ventilation AIR Provisions Do not USE Open Flame GAS InstallationWire Size MAX. Length Using Door OptionSided Framing Peninsula Installation ProcedureCountertop / BAR Installation Retainer Brick Panel InstallationFacing Finishing= 25¼ minus finishing material thickness each side OPEN-END Installation ProcedureTail SEE-THROUGH Installation ProcedureFraming Facing Island Installation Procedure Finishing LOG PlacementLocating Pins Charcoal Embers Mantle InstallationGlowing Embers HoodLower Louvres L36 Louvre Installation Heat Shield STAND-OFF RemovalLogo Placement Upper LouvresTOP Door Latch Bottom Door Latch GVF103-KT Patented Catalytic Door InstallationOptions Door Opening and ClosingWhite Optional Blower InstallationLighting Instructions Operation / MaintenanceFor Your Safety Read Before Lighting What to do if YOU Smell GASVenturi Adjustment MaintenanceCatalytic Tile Maintenance Oxygen Depletion Sensor Pilot CleaningComponents Unique to Peninsula Unit ReplacementsAccessories # Part No. DescriptionW415-0319 / E Symptom Problem Test Solution Trouble Shooting GuideDo not Clean Glass When HOT Fireplace Service History