Vanguard Heating VN6A, VN12 Installing Heater to Wall, Ceiling, Floor, Marking Screw Locations

Page 6

6

CEILING

36"

Minimum

8" Minimum

From Sides Of

Heater

Right

LeftSide

Side

3" Minimum To Top Surface

Of Carpeting, Tile Or Other

Combustible Material

FLOOR

Figure 2 - Mounting Clearances As Viewed From Front of Heater

INSTALLING HEATER TO WALL

Marking Screw Locations

1. Determine where you will locate heater.

!WARNING

Maintain minimum clearances shown in Figure 3. If you can, provide greater clearances from floor and joining wall.

2. Mark two mounting screw locations on wall (see Figure 3).

10 7/8" 7 3/4"

Minimum To

Maintain 8"

Clearance

From Wall

WALL

Mounting

20 1/4"

Screw

Minimum To

 

JOINING

Locations

Maintain 3"

 

Clearance

 

 

 

 

From Floor

FLOOR

Figure 3 - Mounting Screw Locations

Image 6
Contents OWNER’S Operation and Installation Manual What to do if YOU Smell GASContents Safety Information Safety Information Product Identification Local Codes Unpacking Product FeaturesSafety Device Piezo Ignition SystemInstallation Items Check GAS TypeLocating Heater Floor Installing Heater to WallCeiling Marking Screw LocationsInstalling Two Mounting Screws Folding AnchorPlacing Heater On Mounting Screws Connecting to GAS Supply Pressure Testing GAS Supply Piping System Checking GAS ConnectionsPressure Testing Heater GAS Connections Manual Shutoff ValveFor Your Safety Read Before Lighting Operating HeaterLighting Instructions Pilot To Select Heating Level Burner PatternsTo Turn OFF GAS to Appliance Manual Lighting ProcedureInspecting Burner Pilot Flame PatternODS/PILOT and Burner Orifice Cleaning and MaintenanceBurner Flame Pattern CabinetTrouble Shooting Observed Possible Problem Cause RemedyCleaning Observed Possible Problem Cause Remedy Top Technical ServiceIng statement at VN12Manual Shutoff Parts Under WarrantyParts Not Under Warranty Valve GA5010Parts List VN6AIllustrated Parts Breakdown VN12Warranty Information Limited Warranty Vanguard VENT-FREE Residential GAS Heaters