Modifications to NFPA-54, Chapter 10

Revise NFPA-54 section 10.8.3 to add the following re­ quirements:

For all side wall, horizontally vented, gas-fueled equipment installed in every dwelling, building or structure used in

whole or in part for residential purposes, including those owned or operated by the Commonwealth and where the

side wall exhaust vent termination is less than seven (7) feet above the finished grade in the area of the venting, in­

cluding but not limited to decks and porches, the following requirements shall be satisfied:

1 - INSTALLATION OF CARBON MONOXIDE DETEC­ TORS. At the time of installation of the side wall, hori­ zontally vented, gas-fueled equipment, the installing plumber or gasfitter shall observe that a hard-wired

carbon monoxide detector with an alarm and battery

backup is installed on the floor level where the gas

equipment is to be installed. In addition, the installing plumber or gasfitter shall observe that a battery-oper­ ated or hard-wired carbon monoxide detector with an

alarm is installed on each additional level of the dwell­

ing, building or structure served by the side wall, hori­ zontally vented, gas-fueled equipment. It shall be the responsibility of the property owner to secure the ser­

vices of qualified licensed professionals for the instal­

lation of hard-wired carbon monoxide detectors.

a - In the event that the side wall, horizontally vented, gas-fueled equipment is installed in a crawl space or an attic, the hard-wired carbon monoxide detec­ tor with alarm and battery back-up may be installed on the next adjacent floor level.

b - In the event that the requirements of this subdivi­ sion cannot be met at the time of completion of installation, the owner shall have a period of thirty

(30)days to comply with the above requirements; provided, however, that during said thirty (30) day period, a battery-operated carbon monoxide detec­ tor with an alarm shall be installed.

2 - APPROVED CARBON MONOXIDE DETECTORS.

Each carbon monoxide detector as required in accor­ dance with the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certi­ fied.

3 - SIGNAGE. A metal or plastic identification plate shall

be permanently mounted to the exterior of the building

at a minimum height of eight (8) feet above grade di­ rectly in line with the exhaust vent terminal for the hori­ zontally vented, gas-fueled heating appliance or equipment. The sign shall read, in print size no less

than one-half (1/2) inch in size, “GAS VENT DIRECT­

LY BELOW. KEEP CLEAR OF ALL OBSTRUC­ TIONS.”

4 - INSPECTION. The state or local gas inspector of the side wall, horizontally vented, gas-fueled equipment shall not approve the installation unless, upon inspec­ tion, the inspector observes carbon monoxide detec­ tors and signage installed in accordance with the pro­ visions of 248 CMR 5.08(2)(a) 1 through 4.

EXEMPTIONS: The following equipment is exempt

from 24 CMR 5.08(2)(a) 1 through 4:

1 - The equipment listed in Chapter 10 entitled “Equip­ ment Not Required to Be Vented” in the most current edition of NFPA 54 as adopted by the Board; and

2 - Product Approved side wall, horizontally vented, gas- fueled equipment installed in a room or structure sepa­ rate from the dwelling, building or structure used in whole or in part for residential purposes.

MANUFACTURER REQUIREMENTS -

GAS EQUIPMENT VENTING SYSTEM PROVIDED.

When the manufacturer of Product Approved side wall, horizontally vented, gas-fueled equipment provides a vent­ ing system design or venting system components with the equipment, the instructions provided by the manufacturer for installation of the equipment and the venting system shall include:

1 - Detailed instructions for the installation of the venting system design or the venting system components: and

2 - A complete parts list for the venting system design or venting system.

MANUFACTURER REQUIREMENTS -

GAS EQUIPMENT VENTING SYSTEM NOT PROVIDED.

When the manufacturer of Product Approved side wall, horizontally vented, gas-fueled equipment does not pro­ vide the parts for venting the flue gases, but identifies “spe­ cial venting systems,” the following requirements shall be satisfied by the manufacturer:

1 - The referenced “special venting system” instructions shall be included with the appliance or equipment installation instructions; and

2The “special venting systems” shall be Product Ap­ proved by the Board, and the instructions for that sys­ tem shall include a parts list and detailed installation instructions.

A copy of all installation instructions for all Product Approved side wall, horizontally vented, gas-fueled equipment, all venting instructions, all parts lists for venting instructions, and/or all venting design instruc­ tions shall remain with the appliance or equipment at the completion of the installation.

Page 58

Image 58
Contents Installation Instructions EL296UHE Table of ContentsEL296UHE Unit Dimensions inches mm TOP ViewShipping and Packing List Safety InformationEL296UHE Gas Furnace Package 1 of 1 containsInstalled in Combination with a Cooling Coil Installation LocationsUse of Furnace as Construction Heater General Combustion, Dilution & Ventilation AirUnconfined Space Confined SpaceAir from Inside Equipment in Confined Space ALL AIR from InsideEquipment in Confined Space ALL AIR from Outside Air from OutsideEquipment in Confined Space Moved before the furnace is placed into operation. Af­ Installation Setting EquipmentShipping Bolt Removal EL296 Furnaces with 1/2 HP Blower MotorSide View Setting EquipmentFront View END ViewReturn Air Guidelines Side Return Air With transition and filterRemoving the Bottom Panel Optional Return Air Base Upflow Applications OnlyFrontBack Platform Installation of Horizontal Unit Horizontal Application Installation ClearancesSuspended Installation of Horizontal Unit Horizontal Suspension KITFilters Pipe & Fittings SpecificationsDuct System Specification Joint Cementing ProcedurePiping and Fittings Specifications Primer & Solvent CementWall Thickness Guidelines Venting PracticesPiping Suspension Guidelines Removal of the Furnace from Common VentExhaust Piping Figures 22, 24 Horizontal Installation Offset RequirementsVent Piping Guidelines Minimum Vent Pipe LengthsPiping Size Process Outdoor Termination Usage Standard ConcentricStandard Termination Elevation 4500 10,000 ft 135Concentric Termination at Elevation 0 4500 ft Maximum Allowable Intake or Exhaust Vent Length in FeetConcentric Termination Elevation 4501 10,000 ft Standard Termination Elevation 4500 10,000 ft Applications Right Hand Discharge Shown Intake Piping General Guidelines for Vent Terminations 32 to 20 to US Installations1 Canadian Installations2 Inside Corner DetailNo minimum to outside corner Direct Vent Roof Termination KIT Exiting Exhaust and Intake Vent Different pressure zonesEL296UHE Alternate Terminations Tee & Forty-Five Degree Elbows Only 51MM 76MM51MM 7MM Vent Pipe SupportFront View Side ViewTop View Exhaust EL296UHE Direct Vent Application Using Existing Chimney NON-DIRECT Vent Roof Termination KITEL296UHE NON-DIRECT Vent Application Using Existing Chimney Condensate PipingCondensate Trap With Optional Overflow Switch Condensate Trap LocationsEL296UHE with Evaporator Coil Using a Common Drain Unit shown in horizontal left-hand discharge positionTrap / Drain Assembly Using 1/2 PVC or 3/4 PVC 178Leak Check Gas PipingPlugged TAP Horizontal Applications Possible Gas Piping Configurations Left Side Piping Standard Right Side Piping AlternateElectrical Precautions and ProceduresInterior MAKE-UP BOX Installation GAS Pipe Capacity FT3/HR kL/HROn-Board Links and Diagnostic Push Button Figure Typical EL296UHE Wiring Diagram Integrated Control LEDIntegrated Control DIP Switch Settings EL296 Field Wiring Applications With Conventional Thermostat Humidity control OFFWith tstat with Heat / 1 CoolComfortSense Single StageHeat Pump 7000 L7724UOFF For Your Safety Read Before Operating Unit Start-UpGAS Meter Clocking Chart Gas Pressure AdjustmentDial Proper Combustion High Altitude Information Carbon Monoxide Poisoning Hazard Other Unit Adjustments Heating Sequence of OperationControl Panel Parts Repair Parts ListCabinet Parts Blower PartsBlower ServiceCleaning The Burner Assembly FiltersStart-Up & Performance Check List TypicalCondensate Line Thermostat Temperature RiseTotal External Static Drain Line Vent PipeRequirements for Commonwealth of Massachusetts Approved Carbon Monoxide Detectors

EL296UHE, Elite Series Gas Furnace specifications

Lennox International Inc. has long been a trusted name in the heating, ventilation, and air conditioning (HVAC) industry, and their Elite Series Gas Furnace, the EL296UHE, stands out as a remarkable choice for homeowners seeking efficiency and reliability. This gas furnace is designed to deliver exceptional performance while ensuring the comfort of your living space.

One of the most significant features of the EL296UHE is its impressive Annual Fuel Utilization Efficiency (AFUE) rating of up to 96%. This means that a substantial portion of the energy consumed is converted into heat, translating to lower energy bills and a reduced environmental footprint. By minimizing energy waste, homeowners can enjoy both cost savings and greater environmental responsibility.

The EL296UHE is equipped with a two-stage heating process that allows it to operate at different speeds. This dual-stage functionality offers a more consistent temperature throughout the home, minimizing cold spots and enhancing overall comfort. Additionally, this furnace features a variable-speed blower motor, which not only improves the distribution of heated air but also quietly adjusts the airflow to match the heating requirements of your space.

In terms of technology, the EL296UHE incorporates advanced design elements such as a patented ZenBalanceā„¢ technology. This innovation further increases efficiency by adjusting the heating output based on real-time demands, ensuring optimal comfort without excessive energy consumption.

Durability is another hallmark of the EL296UHE. Constructed with high-quality materials, this furnace is built to withstand the rigors of daily use. Its stainless-steel heat exchanger is particularly noteworthy, as it enhances the furnace's ability to operate efficiently while maximizing longevity.

Homeowners are also reassured by the EL296UHE's quiet operation. The design minimizes operational noise, making it an ideal choice for those who prefer a peaceful home environment. Furthermore, the furnace is equipped with an ENERGY STARĀ® certification, a testament to its energy-efficient performance.

Lastly, Lennox offers comprehensive warranties for the EL296UHE, ensuring peace of mind for consumers. The combination of high efficiency, advanced technology, and durability makes the Lennox Elite Series Gas Furnace, EL296UHE, an excellent investment for homeowners looking to enhance their heating systems for optimal comfort and efficiency.