Bryant 355M-40-5 Direct Venting, Removal of Existing Furnaces from Common Vent Systems, Ngpic

Page 21

EAC1

EAC2

A93053

Fig. 26ÐEAC Terminals on Control Center

(5.) Insert EAC stripped leads into control center EAC terminals by depressing terminal's arm with a screwdriver or finger. (See Fig. 26.)

(6.) Reinstall control box to furnace blower shelf using

2 screws removed earlier.

2. Humidifier (HUM)

Screw terminals (HUM and COM) are provided for 24-v humidifier connection. (See Fig. 24.) HUM terminal is energized with 24v (0.5-amp maximum) after inducer motor prepurge period.

NOTE: A field-supplied, 115-v controlled relay connected to EAC terminals may be added if humidifier operation is desired during blower operation.

3.Dehumidification (DH)

A 1/4-in. male quick-connect terminal is provided on control center to attach a normally open (N/O) humidistat contact when dehumidification is desired. (See Fig. 25.) Connect humidistat to thermostat R terminal and DH terminal on control center. A 15 percent reduction of cooling airflow or constant fan airflow will occur when DH terminal is energized and a single- or 2-speed "call for cooling" is received.

DIRECT VENTING

The 355MAV Furnaces require a dedicated (one 355MAV furnace only) direct-vent system. In a direct-vent system, all air for combustion is taken directly from outside atmosphere, and all flue products are discharged to outside atmosphere.

I.REMOVAL OF EXISTING FURNACES FROM COMMON VENT SYSTEMS

If furnace being replaced was connected to a common vent system with other appliances, the following steps shall be followed with each appliance connected to the venting system placed in opera- tion, while any other appliances connected to the venting system are not in operation:

1.Seal any unused openings in the venting system.

2.Inspect the venting system for proper size and horizontal pitch as required in the National Fuel Gas Code, ANSI Z223.1 or the CAN/CGA B149 Installation Codes and these instructions. Determine that there is no blockage or restric- tion, leakage, corrosion, and other deficiencies which could cause an unsafe condition.

3.If practical, close all building doors and windows and all doors between the space in which the appliance(s) con- nected to the venting system are located and other spaces of the building. Turn on clothes dryers and any appliance not

Ð21Ð

connected to the venting system. Turn on any exhaust fans, such as range hoods and bathroom exhausts, so they shall operate at maximum speed. Do not operate a summer exhaust fan. Close fireplace dampers.

4.Follow the lighting instructions. Place the appliance being inspected in operation. Adjust thermostat so appliance shall operate continuously.

5.Test for draft hood equipped appliance spillage at the draft hood relief opening after 5 minutes of main burner opera- tion. Use the flame of a match or candle.

6.After it has been determined that each appliance connected to the venting system properly vents when tested as outlined above, return doors, windows, exhaust fans, fireplace damp- ers, and any other gas-burning appliance to their previous conditions of use.

7.If improper venting is observed during any of above tests, the venting system must be corrected.

Vent system or vent connectors may need to be resized. For any other appliances when resizing vent systems or vent connectors, system or connector must be sized to approach minimum size as determined using appropriate table found in the NFGC or NSC-

NGPIC.

II.COMBUSTION-AIR AND VENT PIPING

A.General

Combustion-air and vent pipe fittings must conform to American National Standards Institute (ANSI) standards and American Society for Testing and Materials (ASTM) standards D1785 (schedule-40 PVC), D2665 (PVC-DWV), D2241 (SDR-21 and SDR-26 PVC), D2661 (ABS-DWV), F628 (schedule-40 ABS), or F891 (PVC-DWV cellular core). Pipe cement and primer must conform to ASTM standards D2564 (PVC) or D2235 (ABS). See Table 6 for maximum pipe lengths and Fig. 31, 32, 33, 34, and 35 for exterior piping arrangements.

In Canada, construct all combustion-air and vent pipes for this unit of CSA or ULC certified schedule-40 PVC, PVC-DWV or ABS-DWV pipe and pipe cement. SDR pipe is NOT approved in Canada.

NOTE: Furnace combustion-air and vent pipe connections are sized for 2-in. pipe. Any pipe size change should be made outside furnace casing in vertical pipe. (See Fig. 27.) This allows proper drainage of vent condensate.

Combustion-air and vent pipes must terminate together in same atmosphere pressure zone, either through roof or sidewall (roof termination preferred), using accessory termination kit. See Table 5 for required clearances.

Furnace combustion-air and vent pipe connections must be at- tached as shown in Fig. 28. Combustion-air intake plug fitting and inducer housing alternate vent cap may need to be relocated in some applications.

CAUTION: When combustion-air pipe is installed above a suspended ceiling, pipe must be insulated with 3/8-in. thick Armaflex-type insulation. Combustion-air pipe should also be insulated when it passes through a warm, humid space.

CAUTION: When vent pipe is exposed to temperatures below freezing, such as when it passes through an unheated space or when a chimney is used as a raceway, pipe must be insulated as shown in Table 7 with Armaflex-type insulation.

Image 21
Contents ÐMultipoise Orientations Ð1ÐDimensions Ð2ÐUnit Size Electrostatic Discharge ESD Precautions Safety ConsiderationsMinimum Inches Clearance To Combustible Construction → ÐClearances to CombustiblesApplications General IntroductionII. Upflow Applications Condensate Trap Location Factory-Shipped OrientationCondensate Trap Location Alternate Upflow Orientation Ð5ÐPressure Switch Tubing Ð6ÐCondensate Trap Field Drain Attachment Condensate Trap Location III. Downflow ApplicationsCondensate Trap Tubing Ð7ÐIV. Horizontal Left SUPPLY-AIR Discharge Applications Ð8ÐConstruct a Working Platform Horizontal Right SUPPLY-AIR Discharge ApplicationsÐ9Ð ÐAttic Location and Working Platform Condensate Trap Tubing Location General ÐHorizontal Right Tube ConfigurationIII. Furnace Location Relative to Cooling Equipment II. LOW-FIRE only InstallationInstallation Leveling Legs if Desired II. Installation in Upflow or Downflow ApplicationsIV. Hazardous Locations Ðopening Dimensions Furnace Plenum Opening Floor Opening CasingWidth ÐDuct Flanges III. Installation in Horizontal ApplicationsÐfilter Information IV. Filter ArrangementBottom Closure Panel → ÐBottom Filter ArrangementVI. GAS Piping WiringÐmaximum Capacity of Pipe Electrical ConnectionsII -V Wiring → ÐHeating and Cooling Application Wiring DiagramÐWiring Diagram III. Accessories Ðelectrical DataAmps Size Removal of Existing Furnaces from Common Vent Systems Direct VentingNgpic II. COMBUSTION-AIR and Vent PipingCombustion-Air and Vent Pipe Diameter ÐCOMBUSTION-AIR and Vent Pipe Termination ClearancesLocation Clearance FT Or doors which can be opened or Combustion-air openingCombustion-Air and Vent Pipe Attachment Example2001 to Ðmaximum Allowable Pipe Length FT3001 to 4001 to 5000³6001 to 7000³ Ðmaximum Allowable Pipe Length FT7001 to 8000³ 8001 to 9000³COMBUSTION-AIR Intake Housing Plug Fitting Termination KIT InstallationIII. Concentric Vent and COMBUSTION-AIR ÐRoof Termination Preferred Two-Pipe Termination Kit Extended Exposed Sidewall PipesConcentric Vent/Air Termination Kit 042040 042060 042080 060080 060100 060120Condensate Drain General IV. Multiventing and Vent TerminationsII. Application III. Condensate Drain ProtectionÐConcentric Vent and Combustion-Air Roof II. Heating Mode SELF-TEST ModeSequence of Operation HSICooling Mode IV. Emergency Heat ModeVI. Heat Pump Mode III. Heating Modeðtwo StageVII. Continuous FAN Mode ÐWiring Schematic for 2-Speed Cooling ApplicationsDehumidification Mode IX. Bypass Humidifier ModeXI. Zone Mode START-UP Procedures GeneralÐcontinuous FAN CF Airflow Setup Switch Position Ðair Conditioning A/C Airflow Setup Switch PositionSetup Switches SW III. Prime Condensate Trap with WaterÐblower OFF Delay Setup Switch Position Ðsetup Switch DescriptionIV. Purge GAS Lines AdjustmentsSet Gas Input Rate → ÐRedundant Automatic Gas ValveBTU/CU FT 4001 Only875 1.5 5000775 1.5 70018000 825Canada Ðaltitude Derate Multiplier for U.S.ASume the Orifice SIZE. Always Check and Verify Altitude Derate Multiplier Factor for U.S.ACheck Safety Controls Check Primary Limit Control Set Temperature RiseÐgas Rate CU FT/HR Set Thermostat Heat AnticipatorChecklist II. Check Pressure SwitchesCHECKLISTÐSTART-UP ChecklistðinstallationLoad Calculation Combustion and Vent Piping

355M-40-4, 355M-40-5 specifications

The Bryant 355M-40-5 and 355M-40-4 are innovative CNC cylindrical grinders designed to meet the demands of precision machining in various industrial applications. These machines stand out due to their robust construction, advanced technology, and versatile functionalities, which are critical for achieving high-quality grinding results.

One of the main features of the Bryant 355M-40-5 and 355M-40-4 is their precision grinding capability. With high spindle speeds and excellent rigidity, these grinders are engineered to deliver superior surface finishes even on complex geometries. The machines are equipped with advanced dressing systems that ensure consistent wheel profiles, enhancing performance and reducing cycle times.

The Bryant 355M-40-5 differentiates itself through its multi-axis capability, allowing for the grinding of intricate shapes and features without the need for extensive setup changes. Operators can easily program complex grinding sequences through the user-friendly interface, which supports both manual and automated operations. This flexibility is crucial in manufacturing environments that require quick turnaround times and adaptability to various workpieces.

Meanwhile, the Bryant 355M-40-4 focuses on efficiency and productivity, featuring a streamlined design that optimizes workflow. The machine is fitted with high-precision linear guides and ball screws, ensuring smooth and accurate movements during the grinding process. This results in minimal wear and tear, thereby extending the machine's lifespan and maintaining accuracy over time.

Key technologies incorporated into both models include state-of-the-art control systems that enable real-time monitoring and feedback during operations. This feature allows operators to make on-the-fly adjustments to optimize grinding parameters, leading to improved performance and reduced scrap rates. Additionally, the integration of automation solutions, such as robotic loading systems, enhances productivity by minimizing downtime and labor costs.

The Bryant 355M-40-5 and 355M-40-4 are built with durability in mind, utilizing high-strength materials that resist deformation and wear. Their thermal stability ensures consistent performance even under varying operating conditions, making them a reliable choice for high-volume production.

In summary, the Bryant 355M-40-5 and 355M-40-4 models are exemplary CNC cylindrical grinders that combine precision, efficiency, and advanced technology. Their features make them suitable for a wide range of grinding applications, from tool manufacturing to automotive components, ensuring that they remain competitive in the ever-evolving landscape of manufacturing technology.