Sequence of Operation (see Figures 33 – 37)

Heating

On a call for heat from the room thermostat, the control board performs a 1 second self check. Upon confirmation that the pressure switch contacts are in an open position, the control energizes the combustion blower on high speed. The control then checks for adequate combustion air by making sure the low-fire pressure switch contacts are closed.

The igniter energizes and is allowed to warm up for 7 seconds before the gas valve energizes on 1st stage and burners ignite. 45 seconds after the control confirms ignition has occurred, the control drops the combustion blower to low speed.

The circulating blower ramps up to 50% of 1st stage heat speed and operates at that speed for one minute (including ramp up time), then at 75% of 1st stage heat speed for an additional minute. After that, the circulating blower operates at full 1st stage heat speed until either the heat call is satisfied or the thermostat initiates a call for 2nd stage heat. On a call for 2nd stage heat, the control energizes the circulating air blower on full CFM 2nd stage heat.

If the automatic heat staging option is being used (see Single Stage Thermostat Operation on page 27), the furnace does not switch to 2nd stage heat in response to a call from the thermostat but instead operates at 1st stage heat for the duration of the selected time before automatically switching to 2nd stage heat.

When the call for heat is satisfied, the gas valve and combustion air blower shut down. The control board shuts off the gas valve and runs the combustion blower for an additional 15 seconds. The circulating air blower continues to run for 2 minutes at 82% of the selected heating speed (low fire or high fire) before ramping down.

In the event the unit loses ignition, the control will attempt to recycle up to five times before it goes into a 1 hour lockout. Lockout may be manually reset by removing power from the control for more than 1 second or removing the thermostat call for heat for more than 3 seconds.

If during a heating cycle the limit control senses an abnormally high temperature and opens, the control board de-energizes the gas valve and the combustion blower while the circulating blower ramps up to 2nd stage heat speed. The circulating blower remains energized until the limits are closed.

Fan On

When the thermostat is set for continuous fan operation and there is no demand for heating or cooling, a call for fan closes

the R to G circuit and the circulating blower motor runs at 50% of the selected cooling CFM until switched off. When the call for fan is turned off, the control de-energizes the circulating blower.

Cooling

The unit is set up at the factory for single stage cooling. For two stage cooling operation, clip the jumper wire located between the Y to Y2 terminals on the integrated ignition/ blower control board.

If the active dehumidification feature is enabled, the circulating blower runs at 82% of the selected cooling speed as long as there is a call for dehumidification.

IMPORTANT

The system must not be in either the passive or active dehumidification mode when charging a cooling system.

Single Stage Cooling

A call for cooling from the thermostat closes the R to Y circuit on the integrated ignition/blower control board. The control waits for a 1-second delay before energizing the circulating blower to 82% of the selected cooling CFM (passive dehumidification mode). After 7.5 minutes, the circulating blower automatically ramps up to 100% of the selected cooling airflow. When the call for cooling is satisfied, the circulating blower ramps back down to 82% of the selected cooling airflow for 1 minute, then shuts off.

Two Stage Cooling

A call for 1st stage cooling from the thermostat closes the R to Y circuit on the control board. The control waits for a 1- second delay before energizing the circulating blower. The blower motor runs at 57% of the selected air flow for the first

7.5minutes of the 1st stage cooling demand (passive dehumidification mode). After 7.5 minutes, the blower motor runs at 70% of the selected cooling air flow until 1st stage cooling demand is satisfied.

A call for 2nd stage cooling from the thermostat closes the R to Y2 circuit on the control board. The blower motor ramps up to 100% of the selected cooling air flow. When the demand for cooling is met, the blower ramps down to Y1 until satisfied, then ramps down to 57% for 1 minute, then turns off.

Heat Pump

For heat pump operation, clip the jumper wire located below the O terminal on the integrated ignition/blower control board. In heat pump mode, a call for heat will result in the circulating air blower operating at the selected cooling airflow after a brief ramp-up period.

506471-01

Issue 1034

Page 31 of 41

Image 31
Contents A80UH2V & 80G1UH2V Table of ContentsFront View Side View A80UH2V & 80G1UH2V Unit Dimensions inches mmExploded View Shipping and Packing List Safety InformationInstalled Locations A80UH2V & 80G1UH2V Gas FurnaceInstalled in Combination with a Cooling Coil Temperature RiseCombustion, Dilution & Ventilation Air Product Contains Fiberglass WoolConfined Space Unconfined SpaceAir from Outside Equipment in Confined Space ALL AIR from Outside Upflow Application Installation Clearances Setting EquipmentUpflow Applications Front View Return Air Upflow ApplicationsHorizontal Applications Removing the Bottom PanelReturn Air Horizontal Applications Supply Air Plenum Horizontal Application Unit installed on PlatformFilters Duct SystemMounting Screws Location VentingUpflow Position Horizontal Left Position Horizontal PositionHorizontal Right Position Common Venting Using Metal Lined Masonry Chimney Venting Using a Masonry ChimneyVent Connection General Venting Requirements Issue Issue 506471-01 Issue Issue 506471-01 Issue Carbon Monoxide Poisoning Hazard Removal of the Furnace from Common VentGas Supply Gas PipingGas Pipe Capacity ft³/hr m³/hr Horizontal Applications Possible Gas Piping Configurations Electrostatic Discharge ESD Interior MAKE-UP BOX InstallationLeak Check ElectricalIndoor Blower Speeds Electrical WiringGenerator Use Voltage Requirements Humidifier Automatic Heat Staging Jumper Electronic Air CleanerVariable Speed Features ThermostatHeating Mode Cooling ModeAdjusting Airflow What to do if you smell gas Lighting InstructionsTo Shut Down Furnace Two Stage Cooling Single Stage CoolingHeat Pump High Heat W2 Call 1st Stage 2nd Stage W1/W2 Heat CallCall for Fan Controls Checking and Adjusting Gas InputGAS Valve Shown in on Position BTU/HR Manifold Pressure SettingsInput Typical Flame Appearance BurnersLubrication LED TroubleshootingFailure Codes Red LED High Heat State Green LEDBlower Group Control Group Heat Exchanger GroupBurner Group WHT RED RED/BLK ORN BLU VLT Wiring DiagramTypical Field Wiring Diagram START-UP & Performance Check List Unit SET UP Unit Operation

80G1UH2V, A80UH2V specifications

Allied Air Enterprises has made a significant mark in the HVAC industry with its innovative and high-performance heating and cooling solutions. Among its impressive lineup, the Allied Air Enterprises 80G1UH2V and A80UH2V models stand out for their efficiency, reliability, and advanced features.

The 80G1UH2V is a two-stage gas furnace that operates on natural gas or propane. With an efficiency rating of up to 80%, it provides excellent heating performance while contributing to cost savings on utility bills. Its durable cabinet design ensures long-lasting performance and protection from harsh weather conditions, making it ideal for a variety of home environments.

One of the key features of the 80G1UH2V is its two-stage heating capability. This technology allows the furnace to operate at a lower capacity to maintain consistent temperatures during milder weather, reducing energy consumption and noise. When the temperature drops significantly, the furnace automatically shifts to high capacity, delivering the required heat promptly. This flexibility not only creates a more comfortable living space but also enhances energy efficiency.

The A80UH2V model shares similar traits with the 80G1UH2V but offers some additional features. It includes a variable-speed blower motor that optimizes airflow throughout the home. This innovation not only increases comfort levels but also facilitates quieter operation. The A80UH2V's advanced control system provides precise temperature management and can be integrated easily with smart home systems for enhanced automation.

Both models are designed to operate quietly, with noise levels minimized through improved insulation and sound-dampening technologies. This makes them suitable for residential applications, where comfort and peace are a priority. Additionally, they come equipped with a self-diagnostic control board that makes troubleshooting and maintenance simpler and more efficient.

Durability is another critical characteristic of both the 80G1UH2V and A80UH2V. They feature a robust heat exchanger made from high-quality materials, enhancing longevity and reliability. With these models, homeowners can expect reliable performance for years with minimal upkeep.

In summary, the Allied Air Enterprises 80G1UH2V and A80UH2V models deliver exceptional heating solutions through advanced technology, efficiency, and reliability. Their innovative features cater to the modern homeowner's need for comfort, control, and energy savings, making them excellent choices for residential heating needs.