Figure 6 Typical wiring – zoning with zone valves
Wiring multiple zones
Refer to zone valve manufacturer’s literature for wiring and application. A separate transformer is required to power zone valves. Zoning with circulators requires a relay for each zone circulator.
Canadian installations – Chain & s-hook
See illustration below.
The chain and
1. Crimp one side of each
2. Remove the two screws that attach the transformer plate to the junction box.
3. Remove the transformer relay assembly and drill a 1/8” hole through the plate as shown below. Do not allow drill shavings to fall into the boiler jacket or onto any control.
4. Crimp the
5. Replace the transformer relay assembly on the junction box and secure with the two screws removed in step 2.
Figure 6 Chain and s-hook installation – Canadian installations only
Part Number | 13 |