PFG Series 7 Gas-fired Water Boiler — Boiler Manual

External heat exchangers

The PFG boiler can be used with a storage tank/heat exchanger unit for domestic hot water. The boiler/tank combination should be installed and wired in accordance with the tank manufacturer’s instructions, which will also show any additional components required. A zone valve or separate circulator must be installed to regulate the production of hot water.

Freeze protection

Use antifreeze especially made for hydronic systems. Inhibited propylene glycol is recommended.

Do not use automotive, ethylene glycol or undiluted antifreeze. Severe personal injury, death or substantial property damage can result.

50% solution provides protection to about -30°F

Local codes may require a back-flow preventer or actual disconnect from city water supply.

Determine quantity according to system water content. Boiler water content is listed on page 23.

Follow antifreeze manufacturer’s instructions.

Using with refrigeration system

The boiler must be installed so that chilled medium is piped in parallel with the heating boiler with appropriate valves to prevent the chilled medium from entering the boiler. Consult I=B=R Installation and Piping Guides.

If boiler is connected to heating coils located in air handling units where they can be exposed to refrigerated air, gravity circulation during the cooling cycle must be prevented with flow control valves or other automatic means.

Part Number 550-110-641/0605

Image 9
Contents PFGGas-fired water boiler Contents Installation clearances Section I InstallationCombustion air and ventilation openings Select the boiler locationChimney or vent requirements When removing boiler from common venting systemBoiler foundation Residential garage installationPlacing the boiler Hydrostatic pressure testBoiler piping connections to the heating Filling the system Multiple zoningBypass piping Using with refrigeration system External heat exchangersFreeze protection Follow good piping practices Size and install gas pipingGas supply piping Spill switch installation PFG-5 only Draft hood installationDamper installation WiringCanadian installations Chain & s-hook Wiring multiple zonesInstallation instructions have been followed Check-out procedureInstaller Company Address Phone Installer’s signature Check off steps as completedHandling ceramic fiber and fiberglass materials Section II ServiceDaily during heating season Beginning of each heating seasonPeriodically during heating season Monthly during heating seasonTo place in operation To inspect base insulationCheck pilot burner flame Check main burner flamesTo clean main burners To clean boiler heating surfacesAnnual shut-down procedure Inspect venting systemCommon problems and possible solutions Description Part Number Section III Replacement PartsPFG Series 7 Gas-fired Water Boiler Boiler Manual DOE Section IV Ratings and dimensionsPFG Series 7 Gas-fired Water Boiler Boiler Manual PFG Series 7 Gas-fired Water Boiler Boiler Manual