Trane SCWH pre-startup, Pre-StartupChecklist, Installation requirements, Receiving, Unit Location

Page 22
pre-startup

pre-startup

Installation requirements

Pre-Startup Checklist

Complete this checklist after installing the unit to verify all recommended installation procedures are complete before unit startup. This does not replace the detailed instructions in the appropriate sections of this manual. Always read the entire section carefully to become familiar with the procedures.

Pre-Startup Checklist WARNING

Hazardous Voltage! Disconnect all electrical power, including remote disconnects before servicing. Follow proper lockout/tagout procedures to ensure power cannot be inadvertently energized. Failure to disconnect power before servicing could result in death or serious injury.

Receiving

‰Inspect unit and components for shipping damage. File damage claims immediately with the delivering carrier.

‰Check nameplate unit data so that it matches the sales order requirements.

‰Check unit for missing material. Look for ship-with accessories that are packaged separately and placed inside the access panel, fan section, or compressor section. See the “Receiving and Handling” section.

Unit Location

‰Ensure the unit location is adequate for unit dimensions, ductwork, piping, and electrical connections.

‰Ensure access and maintenance clearances around the unit are adequate. See the “Service Access” section.

Unit Mounting

‰Remove shipping brackets on the compressor assembly and supply fan.

Component Overview

‰Verify the fan and motor sheaves are aligned.

‰Check the belt tension for proper adjustment.

‰Ensure the fan rotates freely.

‰Tighten locking screws, bearing set screws and sheaves.

‰Ensure bearing locking collars do not wobble when rotated.

‰Ensure all air filters are properly installed with consideration of size and air flow.

‰Manually rotate the evaporator fan to ensure free movement. Verify that all of the fan mounting hardware is tight.

Ductwork

‰Verify that all ductwork conforms to NFPA 90A or 90B and all applicable local codes.

22

PKG-SVX14A-EN

Image 22
Contents Installation, Operation, and Maintenance “AO” and later design sequenceOctober Midrange Self-ContainedUnitsExample Warnings and Cautions general informationWarnings and Cautions Special Note on Refrigeration EmissionsMaintenance ……………………………………………25 contentsInstallation…………………………………………………2 Operation…………………………………………………24general Installation informationUnit Airflow Configurations Midrange Model Number DescriptionGeneral Refrigerant Handling Proceduresgeneral Installation informationReceiving and Handling pre-installation Installation considerationsInstallation Preparation Pre-InstallationConsiderationspre-installation Installation considerations Service Access3 through 7.5-tonSCRH/SCWH Service Access pre-installation Installation considerations10 through 15-tonSCRH/SCWH Note Isolators are field-provided Isolator Placementpre-installation Installation considerations 1 7/8pre-installation Installation considerations Proper Lifting ProcedureImproper Unit Lift 3 & 5-tons SCWH/SCRH dimensions &Installation weights vertical discharge SCWHInstallation weights 7.5-tons SCWH/SCRHdimensions vertical dischargeInstallation weights SCWH/SCRHdimensions SCWH/SCRH dimensions & weight, in-lbsSCWH/SCRH Dimensions, in dimensionsInstallation weights SCWH/SCRHInstallation weights Plenumdimensions Hot water coil 3 & 5-tonunitsHot water coil 10 thru 15-tonunits Hot water coil7.5-tonunits dimensionsmechanical Installation requirementsDuct Connections Water PipingInstallation requirements Refrigerant Piping Air-CooledUnits OnlyElectrical Requirements Brazing ProceduresInstallation requirements electricalElectrical Data Calculations Supply Power WiringHazardous Voltage Installation requirementselectrical Table I-ER-1.Model SCWH/SCRHelectrical dataInstallation Checklist installationInstallation procedure Plenum InstallationInstallation requirements Pre-StartupChecklistpre-startup ReceivingUnit Startup Checklist Installation startupUnit Startup Procedures Hazardous voltageOperation operation sequence ofSequence of Operation Table M-GI-1.Midrange maintenance general data Maintenance informationgeneral Maintenance Procedures maintenanceMaintenance procedures Periodic Maintenance ChecklistMaintenance procedures Refrigerant Systemmaintenance Leak TestingMotor Winding Damage maintenanceMaintenance procedures Hazardous Pressuresperiodic Maintenance checklistsPeriodic Checklists Monthly ChecklistTroubleshooting Maintenance troubleshootingHazardous voltage Insufficient cooling Maintenance troubleshootingHazardous voltage typical wiring Maintenance diagramMaintenance diagram typical wiringPKG-SVX01A-EN typical wiring Maintenance diagramMaintenance diagram typical wiringPKG-SVX01A-EN Date Literature Order NumberPKG-SVX14A-EN October