Trane SCWH, SCRH maintenance, Maintenance procedures, Motor Winding Damage, Hazardous Pressures

Page 28
Motor Winding Damage!

maintenance

Maintenance procedures

CAUTION

Motor Winding Damage!

Do not use a megohm meter or apply greater than 50 VDC to a compressor motor winding while it is under a deep vacuum. Voltage sparkover may cause damage to the motor windings.

Hazardous Pressures! WARNING

Hazardous Pressures!

If a heat source is required to raise the tank pressure during removal of refrigerant from cylinders, use only warm water or heat blankets to raise the tank temperature. Do not exceed a temperature of 150°F. Do not, under any circumstances, apply direct flame to any portion of the cylinder. Failure to follow these safety precautions could result in a violent explosion, which could result in death or serious injury.

Charging the Refrigerant System

To completely charge the system, charge gaseous refrigerant into the suction line shrader valve with the unit running. However, make sure that some refrigerant is present in each circuit before starting the compressors.

CAUTION

Compressor Damage!

Do not allow liquid refrigerant to enter the suction line. Excessive liquid accumulation in the liquid lines may result in compressor damage.

CAUTION

Compressor Damage!

Never manually or automatically pump down below 7 psig. This may cause the compressor to operate in a vacuum and result in compresor damage.

Table M-MP-1. Normal operation condition

 

 

 

 

 

water-cooled

 

air-cooled

 

 

high pressure

 

 

280 to 430 psig

 

320 to 570 psig

 

 

low pressure

 

 

 

100 to 160 psig

 

 

superheat

 

 

 

4 to 9°F

 

 

subcooling

 

 

 

5 to 10°F

Table M-MP-2. Controls adjustment

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

control

disarming

rearming

 

 

 

 

high pressure control (air-cooled & 12-ton water cooled)

624±17.5 psig

464±29 psig

unit (ton / voltage)

 

 

 

 

 

 

 

high pressure control (water-cooled except 12-ton)

450±10 psig

348±14.5 psig

 

 

 

 

low pressure contol

51±7 psig

94±7 psig

 

 

 

 

 

 

266±5F

194±5

 

3 / 204-230 & 575

 

 

 

275±5F

198

 

5 / 208-230

 

 

 

266±5F

198

 

5 / 575

 

motor windings thermostat, standard motor only

194±5F

135

 

7.5 - 10 / 208-230

 

 

 

248±5F

156

 

7.5 - 10 / 575

 

 

 

194±5F

135

 

12 - 15 / 208-230

 

 

 

221±5F

142

 

12 - 15 / 575

28

PKG-SVX14A-EN

Image 28
Contents “AO” and later design sequence OctoberInstallation, Operation, and Maintenance Midrange Self-ContainedUnitsgeneral information Warnings and CautionsExample Warnings and Cautions Special Note on Refrigeration Emissionscontents Installation…………………………………………………2Maintenance ……………………………………………25 Operation…………………………………………………24Installation information Unit Airflow Configurationsgeneral Midrange Model Number DescriptionRefrigerant Handling Procedures generalGeneral Installation informationpre-installation Installation considerations Installation PreparationReceiving and Handling Pre-InstallationConsiderationspre-installation Installation considerations Service Access3 through 7.5-tonSCRH/SCWH Service Access pre-installation Installation considerations10 through 15-tonSCRH/SCWH Isolator Placement pre-installation Installation considerationsNote Isolators are field-provided 1 7/8pre-installation Installation considerations Proper Lifting ProcedureImproper Unit Lift dimensions & Installation weights3 & 5-tons SCWH/SCRH vertical discharge SCWH7.5-tons SCWH/SCRH dimensionsInstallation weights vertical dischargeSCWH/SCRH dimensionsInstallation weights SCWH/SCRH dimensions & weight, in-lbsdimensions Installation weightsSCWH/SCRH Dimensions, in SCWH/SCRHPlenum dimensionsInstallation weights Hot water coil 3 & 5-tonunitsHot water coil 7.5-tonunitsHot water coil 10 thru 15-tonunits dimensionsInstallation requirements Duct Connectionsmechanical Water PipingRefrigerant Piping Air-CooledUnits Only Electrical RequirementsInstallation requirements Brazing Procedureselectrical Electrical Data CalculationsInstallation requirements Supply Power WiringInstallation requirements electricalHazardous Voltage Table I-ER-1.Model SCWH/SCRHelectrical datainstallation Installation procedureInstallation Checklist Plenum InstallationPre-StartupChecklist pre-startupInstallation requirements ReceivingInstallation startup Unit Startup ProceduresUnit Startup Checklist Hazardous voltageOperation operation sequence ofSequence of Operation Table M-GI-1.Midrange maintenance general data Maintenance informationgeneral maintenance Maintenance proceduresMaintenance Procedures Periodic Maintenance ChecklistRefrigerant System maintenanceMaintenance procedures Leak Testingmaintenance Maintenance proceduresMotor Winding Damage Hazardous PressuresMaintenance checklists Periodic Checklistsperiodic Monthly ChecklistTroubleshooting Maintenance troubleshootingHazardous voltage Insufficient cooling Maintenance troubleshootingHazardous voltage typical wiring Maintenance diagramMaintenance diagram typical wiringPKG-SVX01A-EN typical wiring Maintenance diagramMaintenance diagram typical wiringPKG-SVX01A-EN Literature Order Number PKG-SVX14A-ENDate October