Trane SCRH, SCWH manual periodic, Maintenance checklists, Periodic Checklists, Monthly Checklist

Page 29
periodic

periodic

Maintenance checklists

Periodic Checklists

Monthly Checklist

The following checklist provides the recommended maintenance schedule to keep the unit running efficiently.

Maintenance checklists WARNING

Hazardous Voltage!

Disconnect all electrical power including remote disconnects before servicing unit. Follow proper lockout/tagout procedures to ensure power cannot be inadvertently energized. Failure to disconnect power before servicing could result in death or serious injury.

1.Inspect unit air filters. Clean or replace if airflow is blocked or if filters are dirty.

2.Inspect coils for icing. Icing on the coils may indicate low airflow supply, restricted airflow from dirty fins.

3.Check the fan belt condition and tension. Adjust tension if belt is floppy or squeals continually.

4.Check and record operating pressures.

Semi-Annual Maintenance

1.Verify the fan motor is properly aligned and bolted tight to the motor frame.

2.Lubricate fan bearings.

3.With power disconnected, manually rotate the fan wheel to check for obstructions in the housing or

Periodic Checklists WARNING

Rotating Components!

During installation, testing, servicing and troubleshooting of this product it may be necessary to measure the speed of rotating components. Have a qualified or licensed service individual who has been properly trained in handling exposed rotating components, perform these tasks. Failure to follow all safety precautions when exposed to rotating components could result in death or serious injury.

interference with fan blades. Remove obstructions and debris. Center the fan wheel if necessary.

4.Check the fan assembly sheave alignment. Tighten set screws to their proper torques.

Note: Perform this procedure monthly if the unit is in a coastal or corrosive environment.

Annual Maintenance

Check and tighten all set screws, bolts, locking collars and sheaves.

1.Inspect, clean, and tighten all electrical connections.

2.Visually inspect the entire unit casing for chips or corrosion. Remove rust or corrosion and repaint surfaces.

3.Visually check for leaks in refrigerant piping.

4.Inspect fan, motor, and control contacts. Replace badly worn or eroded contacts.

5.Inspect the thermal expansion valve sensing bulbs for cleanliness, good contact with the suction line, and adequate insulation from ambient air.

Monthly Checklist WARNING

Live Electrical Components! During installation, testing, servicing, and troubleshooting this equipment, it may be necessary to work with live electrical components. Have a qualified licensed electrician or other individual who is properly trained in handling live electrical components perform these tasks. Failure to follow all electrical components could result in death or serious injury.

PKG-SVX14A-EN

29

Image 29
Contents October “AO” and later design sequenceInstallation, Operation, and Maintenance Midrange Self-ContainedUnitsWarnings and Cautions general informationExample Warnings and Cautions Special Note on Refrigeration EmissionsInstallation…………………………………………………2 contentsMaintenance ……………………………………………25 Operation…………………………………………………24Unit Airflow Configurations Installation informationgeneral Midrange Model Number Descriptiongeneral Refrigerant Handling ProceduresGeneral Installation informationInstallation Preparation pre-installation Installation considerationsReceiving and Handling Pre-InstallationConsiderations3 through 7.5-tonSCRH/SCWH Service Accesspre-installation Installation considerations 10 through 15-tonSCRH/SCWH pre-installation Installation considerationsService Access pre-installation Installation considerations Isolator PlacementNote Isolators are field-provided 1 7/8Improper Unit Lift Proper Lifting Procedurepre-installation Installation considerations Installation weights dimensions &3 & 5-tons SCWH/SCRH vertical discharge SCWHdimensions 7.5-tons SCWH/SCRHInstallation weights vertical dischargedimensions SCWH/SCRHInstallation weights SCWH/SCRH dimensions & weight, in-lbsInstallation weights dimensionsSCWH/SCRH Dimensions, in SCWH/SCRHdimensions PlenumInstallation weights Hot water coil 3 & 5-tonunits7.5-tonunits Hot water coilHot water coil 10 thru 15-tonunits dimensionsDuct Connections Installation requirementsmechanical Water PipingElectrical Requirements Refrigerant Piping Air-CooledUnits OnlyInstallation requirements Brazing ProceduresElectrical Data Calculations electricalInstallation requirements Supply Power Wiringelectrical Installation requirementsHazardous Voltage Table I-ER-1.Model SCWH/SCRHelectrical dataInstallation procedure installationInstallation Checklist Plenum Installationpre-startup Pre-StartupChecklistInstallation requirements ReceivingUnit Startup Procedures Installation startupUnit Startup Checklist Hazardous voltageSequence of Operation sequence ofOperation operation general Maintenance informationTable M-GI-1.Midrange maintenance general data Maintenance procedures maintenanceMaintenance Procedures Periodic Maintenance Checklistmaintenance Refrigerant SystemMaintenance procedures Leak TestingMaintenance procedures maintenanceMotor Winding Damage Hazardous PressuresPeriodic Checklists Maintenance checklistsperiodic Monthly ChecklistHazardous voltage Maintenance troubleshootingTroubleshooting Hazardous voltage Maintenance troubleshootingInsufficient cooling Maintenance diagram typical wiringPKG-SVX01A-EN typical wiringMaintenance diagram Maintenance diagram typical wiringPKG-SVX01A-EN typical wiringMaintenance diagram PKG-SVX14A-EN Literature Order NumberDate October