Honeywell F111 Series 2, F111 Series 1 specifications Installation, When Installing this Product…

Page 4

F111 (SERIES 1,2) IN CEILING MEDIA AIR CLEANER

INSTALLATION

WARNING

Explosion Hazard Possible.

Can cause personal injury or equipment damage. Do not install or use the F111 (series 1,2) air cleaner where there is any danger of gas, vapor or dust explosion.

IMPORTANT

This air cleaner has not been investigated for use in the ceilings of fire-resistant assemblies.

CAUTION

Electrical Hazard.

Can cause personal injury or equipment damage. Turn off power before installing or servicing the air cleaner.

IMPORTANT

Stand on a stable platform when working with the air cleaner.

When Installing this Product…

1.

Read these instructions carefully. Failure to follow them

 

could damage the product or cause a hazardous condi-

 

tion.

2.

Check the ratings given in the instructions and on the

 

product to make sure the product is suitable for your

 

application.

1.Locate the prepunched hole in the side of the cabinet.

2.Remove the air cleaner lid.

3.Remove the connection box cover plate in the center cavity of the air cleaner.

4.Refer to Fig. 3 and 4 for typical wiring diagrams.

WARNING

Risk of Fire or Electric Shock.

Can cause personal injury or equipment damage. Use only Honeywell 32000234 Variable Speed Switch (accessory) to regulate air cleaner speed. Using a different speed controller may void the warranty.

IMPORTANT

Be sure the air cleaner is grounded for correct operation and safety.

Canadian installation: NEVER install in ceilings with thermal insulation value greater than R-40.

 

 

 

 

 

 

 

 

 

 

 

FACTORY WIRING

 

 

 

 

 

 

 

 

 

 

 

 

BLACK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EXTERNAL

CAPACITOR

 

BROWN

 

 

 

WIRING BY

 

 

 

 

 

MOTOR

INSTALLER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WHITE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GREEN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

M12657

Fig. 3. Typical F111 (series 1,2) 120V, 60 Hz or

208/230, 50/60 Hz wiring diagram.

3.

Installer must be a trained, experienced service techni-

 

cian.

4.

After installation is complete, check out product opera-

 

tion as provided in these instructions.

Unpack the Air Cleaner

Check that all components are included. The unit consists of:

cabinet and grille/door assembly

media modules

EXTERNAL WIRING BY INSTALLER

CAPACITOR

FACTORY WIRING

BLACK

BROWN

BROWN

MOTOR

277 V

STRIPE

 

PURPLE

 

GREEN

 

 

M11748

literature.

latches (2)

Make Opening (if Mounting in a Drop Ceiling)

1.Size the opening to fit the air cleaner cabinet as closely as possible.

2.Frame the opening to provide adequate support for the cabinet. The cabinet must fit snugly in the opening; allow no more than 1/4 in. (6 mm) from the opening to each side of the cabinet.

3.Cover the framing and any unused portion of the open- ing with wallboard, plywood, or other material and finish to match the ceiling.

Electrical Hookup

All wiring must comply with applicable codes and ordinances. The power source must agree with the model type: 120V,

60 Hz; 208/230V, 50/60 Hz or 277V, 60 Hz. The air cleaners are internally prewired.

Fig. 4. Typical F111 (series 1,2) 277V,

60 Hz wiring diagram.

Mount Air Cleaner Cabinet

The air cleaner can be mounted in a drop ceiling system or hung in an open area. Both mounting methods require the air cleaner to be level and positioned facing downward for correct operation.

1.Remove the door/grille from the carton and set it aside.

2.Remove all filters

3.Fit the cabinet into the prepared ceiling opening or position on the ceiling.

4.Use the four 3/8 x 16T internal nuts (one at each corner) to fasten the cabinet to a structural support (bar joist, concrete slab or timber framing). See Fig. 5.

NOTES:

All external hardware is furnished by the installer.

When using the suspension system of mounting, be sure to include a means for leveling adjust- ment after installation.

68-0198EF-4 Revised 11-07

4

Image 4
Contents Contents FeaturesApplication Specifications Installation WeightOrdering Information Most GasesChoose Location Planning the InstallationFor Use In Fire Resistance Rated Construction Installation When Installing this Product…Opening/Closing the Lid Lid AssemblyRemoving /Replacing the Lid Service OperationPrefilter Particle FilterCPZ Adsorbent Module Module weighs about 26 lb 12 kg and can be hard to handleParts List Not shown in FigM11995E Limited TWO-YEAR Warranty Air-Pure Systems, Inc

F111 Series 2, F111 Series 1 specifications

The Honeywell F111 Series 1 and Series 2 are advanced control systems designed for various aerospace applications, instrumental in enhancing operational efficiency and reliability in flight management. Renowned for their pioneering technologies, these systems are created to meet the growing demands of modern aviation.

The F111 Series 1 features a robust architecture that integrates diverse avionics, ensuring compatibility and interoperability with existing aircraft systems. This series employs state-of-the-art signal processing techniques, allowing for enhanced data interpretation from onboard sensors. Pilots benefit from real-time information displays, granting them better situational awareness during flights. The control algorithms that govern autopilot functions are precisely tuned, yielding smoother transitions during manual and automatic flying.

On the other hand, the F111 Series 2 builds upon its predecessor's foundation, introducing several enhancements. One of its key features is an upgraded user interface, which simplifies pilot interaction and reduces cognitive workload. The Series 2 includes advanced predictive maintenance capabilities, offering real-time diagnostics that help anticipate issues before they escalate, significantly reducing downtime and maintenance costs.

Both series utilize cutting-edge technologies such as digital signal processors and integrated circuit designs, which improve reliability while minimizing weight—an essential factor in aircraft design. The systems are also designed for ruggedness, ensuring they can withstand the harsh environments encountered in aviation. Additionally, they incorporate safety measures like redundancy protocols and fail-safe mechanisms to enhance flight security.

The communication capabilities of both F111 series are noteworthy; they are equipped with modern data links that facilitate seamless connectivity with ground control and other aircraft. This feature enhances coordination in cooperative operations, making them ideal for military and commercial applications alike.

In summary, the Honeywell F111 Series 1 and Series 2 represent a significant advancement in avionics technology. With their intelligent design, robust features, and focus on safety and efficiency, these systems are at the forefront of modern aviation, ensuring pilots have the tools they need for successful flight operations while minimizing operational risks. Their continual evolution reflects the commitment to meeting the dynamic challenges of the aerospace industry.