Honeywell F90B specifications F90A 230 Vac model schematic diagram CE compliant model

Page 20

F90A,B SELF-CONTAINED COMMERCIAL ELECTRONIC AIR CLEANER

 

BLACK COLLECTOR

 

 

 

RED IONIZER

 

TEST￿

POWER￿

RED

BUTTON

 

 

 

SUPPLY

 

 

 

P3

 

 

 

PERFORMANCE￿

￿

BLACK

 

SWITCH

5

 

P4

 

 

 

BLACK

BLACK

ON￿

WHITE

(YELLOW)

 

 

RED

WASH￿

WHITE

 

(YELLOW)

RED

CHECK￿

WHITE

RED

(RED)

 

ORANGE

J5

2

CONTACT￿ BOARD

￿LAMP

4

OFF

LO

MED

HI

 

￿

 

1

 

L

￿

1

230 Vac N

2

 

 

BLACK

 

 

 

 

 

 

WHITE

 

 

 

WHITE

 

A5

A3

 

 

 

A6

A4

 

 

 

 

 

 

BROWN

WHITE

 

B3

B1

 

 

 

 

 

B4

B2

RED

 

 

 

 

 

C3

C1

 

 

 

C4

C2

BLUE

 

 

 

 

 

D3

D1

 

 

 

D4

D2

VIOLET

 

 

 

 

ON-OFF/3-SPEED￿

 

FAN￿

FAN SWITCH

 

MOTOR

 

 

￿

 

 

BROWN

 

3

 

 

 

 

 

 

BLUE

 

 

 

 

￿

1￿ TERMINAL BOARD FOR POWER SUPPLY CONNECTIONS.￿ ￿ POWER SUPPLY. PROVIDE DISCONNECT MEANS ￿

￿ AND OVERLOAD PROTECTION AS REQUIRED.￿

￿

￿

2￿ BROWN LEAD MUST BE CONNECTED TO TOP ￿ ￿ TERMINAL ON TRANSFORMER. ￿

￿

￿

3￿ INTERLOCK SAFETY SWITCH.￿

￿￿

4￿ PROVIDES ON-OFF INDICATION.￿

￿

￿

5￿ LEFT CELL AND CONTACT BOARD ON￿

￿TWO-CELL AIR CLEANER ONLY.

3

M11577

Fig. 24. F90A 230 Vac model schematic diagram (CE compliant model).

68-0103-6 Revised 11-07

20

Image 20
Contents Features Application ContentsSpecifications Ordering InformationPlanning the Installation Application and OperationDetermine Number of F90 Needed Choose LocationOutdoor Air Example 1. Sizing by Air Changes per Hour and Room VolumeSolution Installation When Installing this Product…Example 3. Sizing by Air Changes per Hour and Room Volume Example 2. Sizing by Occupant LoadMounting the F90 Using Lag Screws UnpackingMounting F90 can be mounted in any of four waysInstalling the Wash LED Mounting the F90 Using Threaded Steel Rod Using the mounting template to locate holesArrange two 2 x 4 supports as shown in Fig Mount the steel rods to the supportsWiring Power CordInstalling Activated Carbon Filters, Cells, and Prefilters Permanent WiringCheckout AdjustmentsService Cleaning the F90 Cleaning the PrefilterCleaning the Cell Using Alkaline Base Detergent Hazardous Chemical Can cause personal injuryDiscolored Aluminum Removing Specific Contaminants from the CellReplacing Ionizer Wires Modifying to Reduce Ozone OdorElectrical Troubleshooting Troubleshooting ProcedureRemoving The Power Box Tools And EquipmentStart Removing the F90 Power Box Assembly F90A 120 Vac model schematic diagram F90A 230 Vac model schematic diagram CE compliant model F90B 120 Vac model schematic diagram Replacement Parts LIST/EXPLODED View Parts and Optional Accessories Not IllustratedF90A exploded view. Part numbers are keyed to Parts List Limited ONE-YEAR Warranty How to make a warranty claim or have questions answered