Honeywell F90A specifications F90B 120 Vac model schematic diagram

Page 21

F90A,B SELF-CONTAINED COMMERCIAL ELECTRONIC AIR CLEANER

PERFORMANCE￿

SWITCH

BLACK

 

 

 

￿

BLACK

3

 

 

WHITE

WASH￿

RED

(YELLOW)

RED

 

ON￿

WHITE

(YELLOW)

 

POWER￿

SUPPLY

P3

P4

J2

2

P21 4 P22

3

1

P2

P1

BLACK COLLECTOR

 

 

 

RED IONIZER

 

TEST￿

 

RED

BUTTON

 

 

 

 

 

BLACK

 

 

CHECK￿

 

 

RED

(RED)

 

 

 

 

 

WHITE

 

 

 

CONTACT￿ BOARD

ON-OFF/3-SPEED FAN SWITCH

PUSH BUTTONS WIRING TERMINALS

HI

ON

MED

HI

LO

MED

OFF

LO

 

L1￿

BLACK

ORANGE

￿

 

￿

(HOT)

 

 

2

1

 

WHITE

 

 

L2

 

 

 

 

 

GROUND

GREEN

 

 

 

 

 

BROWN

 

 

 

VIOLET

SPEED￿

 

 

BLUE

CONTROL￿

 

 

MODULE

 

 

RED

 

 

 

 

 

 

 

 

 

 

 

 

FAN￿

MOTOR

WHITE

￿

1

￿

￿

2

￿

￿

3

￿

POWER SUPPLY. PROVIDE DISCONNECT MEANS ￿ AND OVERLOAD PROTECTION AS REQUIRED. ￿

INTERLOCK SAFETY SWITCH.￿

REPLACE THE BLACK LEADS.￿

M6156

Fig. 25. F90B 120 Vac model schematic diagram.

21

68-0103-6 Revised 11-07

Image 21
Contents Contents Features ApplicationOrdering Information SpecificationsApplication and Operation Planning the InstallationChoose Location Determine Number of F90 NeededExample 1. Sizing by Air Changes per Hour and Room Volume SolutionOutdoor Air When Installing this Product… InstallationExample 3. Sizing by Air Changes per Hour and Room Volume Example 2. Sizing by Occupant LoadUnpacking Mounting the F90 Using Lag ScrewsMounting F90 can be mounted in any of four waysInstalling the Wash LED Using the mounting template to locate holes Mounting the F90 Using Threaded Steel RodArrange two 2 x 4 supports as shown in Fig Mount the steel rods to the supportsPower Cord WiringPermanent Wiring Installing Activated Carbon Filters, Cells, and PrefiltersAdjustments ServiceCheckout Cleaning the Prefilter Cleaning the F90Cleaning the Cell Using Alkaline Base Detergent Hazardous Chemical Can cause personal injuryRemoving Specific Contaminants from the Cell Discolored AluminumModifying to Reduce Ozone Odor Replacing Ionizer WiresTroubleshooting Procedure Electrical TroubleshootingRemoving The Power Box Tools And EquipmentStart Removing the F90 Power Box Assembly F90A 120 Vac model schematic diagram F90A 230 Vac model schematic diagram CE compliant model F90B 120 Vac model schematic diagram Parts and Optional Accessories Not Illustrated Replacement Parts LIST/EXPLODED ViewF90A exploded view. Part numbers are keyed to Parts List How to make a warranty claim or have questions answered Limited ONE-YEAR Warranty