Honeywell F90B Mounting the F90 Using Threaded Steel Rod, Mount the steel rods to the supports

Page 9
VENTURI￿ PLATE

F90A,B SELF-CONTAINED COMMERCIAL ELECTRONIC AIR CLEANER

F90A

F90B

 

 

 

 

 

 

29-1/4 (743)

 

 

 

 

 

 

7/8 (22) DIAMETER ￿

 

 

 

24 (610)

4￿

 

 

 

 

 

16 (406)

KNOCKOUT￿

 

 

(102)

 

 

 

 

 

￿

 

 

 

 

 

19-1/4 (489)

14-1/2 (368)

LATCHES

29-1/4￿

(743)

24￿

(610)16￿

(406)

2 (51)

9 (229) 2

1

24￿

(610)

29-1/4 ￿

(743)POWER￿ CORD

3-1/4￿

(83)

5-3/4 (146)

7 (178)

1

 

16￿

(406)

3 (76)

8￿ (203)

2

KEYHOLE

3/8 (10) DIAMETER

3/4 (19)

3/8 (10) DIAMETER

1ALLOW AT LEAST 16 INCHES (406 MILLIMETERS) FROM ￿

FRONT OF F90 TO WALL FOR INSTALLATION AND ￿ REMOVAL OF CELLS.

2ALLOW AT LEAST 9 INCHES (229 MILLIMETERS) FROM ￿ BACK OF F90 TO WALL FOR REMOVAL OF COVER.

M920

Fig. 7. F90 installation dimensions in in. (mm).

 

 

 

 

 

 

 

 

 

 

 

TYPICAL 2 x 8 INCH￿

DRILL 5/16 INCH￿

 

 

 

 

 

 

 

WOOD JOISTS,￿

 

 

 

 

 

 

 

16 INCH CENTERS

(8 mm)￿

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PILOT ￿

 

 

 

 

 

 

 

 

 

 

HOLES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Mounting the F90 Using Threaded Steel Rod

1.

Arrange two 2 x 4 supports as shown in Fig. 9.

2.

Drill four 5/16 inch pilot holes through the supports

 

using the mounting template to locate holes.

3.

Mount the steel rods to the supports.

5/8 INCH (19 mm)￿

DIAMETER KEY HOLES￿ PROVIDED IN AIR￿ CLEANER HOUSING

5-1/2 (140 mm)

REMOVE￿

CELLS￿

AND￿

FILTERS￿

￿

3/8 x 3 INCH￿

(10 x 76 mm)￿

LAG SCREW AND￿ WASHER

4.

Lift the F90 to the mounting location.

5.

Mount the F90 to the steel rods by attaching the nuts

 

and washers.

M1533

Fig. 8. Mounting the F90 using lag screws in joist

applications.

9

68-0103-6 Revised 11-07

Image 9
Contents Contents Features ApplicationOrdering Information SpecificationsApplication and Operation Planning the InstallationChoose Location Determine Number of F90 NeededExample 1. Sizing by Air Changes per Hour and Room Volume SolutionOutdoor Air When Installing this Product… InstallationExample 3. Sizing by Air Changes per Hour and Room Volume Example 2. Sizing by Occupant LoadUnpacking Mounting the F90 Using Lag ScrewsMounting F90 can be mounted in any of four waysInstalling the Wash LED Using the mounting template to locate holes Mounting the F90 Using Threaded Steel RodArrange two 2 x 4 supports as shown in Fig Mount the steel rods to the supportsPower Cord WiringPermanent Wiring Installing Activated Carbon Filters, Cells, and PrefiltersAdjustments ServiceCheckout Cleaning the Prefilter Cleaning the F90Cleaning the Cell Using Alkaline Base Detergent Hazardous Chemical Can cause personal injuryRemoving Specific Contaminants from the Cell Discolored AluminumModifying to Reduce Ozone Odor Replacing Ionizer WiresTroubleshooting Procedure Electrical TroubleshootingRemoving The Power Box Tools And EquipmentStart Removing the F90 Power Box Assembly F90A 120 Vac model schematic diagram F90A 230 Vac model schematic diagram CE compliant model F90B 120 Vac model schematic diagram Parts and Optional Accessories Not Illustrated Replacement Parts LIST/EXPLODED ViewF90A exploded view. Part numbers are keyed to Parts List How to make a warranty claim or have questions answered Limited ONE-YEAR Warranty