Honeywell F90B specifications F90A 120 Vac model schematic diagram

Page 19

F90A,B SELF-CONTAINED COMMERCIAL ELECTRONIC AIR CLEANER

PERFORMANCE￿

SWITCH

BLACK

 

 

 

￿

BLACK

3

 

 

WHITE

WASH￿

RED

(YELLOW)

 

 

 

RED

ON￿

WHITE

(YELLOW)

 

POWER￿

SUPPLY

P3

P4

J2

2

P21 4 P22

3

1

P2

P1

BLACK COLLECTOR

 

 

 

RED IONIZER

 

TEST￿

 

RED

BUTTON

 

 

 

 

 

BLACK

 

 

CHECK￿

 

 

RED

(RED)

 

 

 

 

 

WHITE

 

 

 

CONTACT￿ BOARD

ON-OFF/3-SPEED FAN SWITCH

PUSH BUTTONS

WIRING TERMINALS

HI

ON

MED

HI

LO

MED

OFF

LO

 

L1￿

BLACK

ORANGE

￿

 

￿

(HOT)

 

 

2

1

 

WHITE

 

 

L2

 

 

 

 

 

GROUND

GREEN

 

 

 

 

BROWN

VIOLET

BLUE

RED

FAN￿

MOTOR

WHITE

￿

1 POWER SUPPLY. PROVIDE DISCONNECT MEANS ￿ AND OVERLOAD PROTECTION AS REQUIRED. ￿

￿

￿

2 INTERLOCK SAFETY SWITCH.￿

￿

￿

3 REPLACE THE BLACK LEADS.￿

￿

M6152

Fig. 22. F90A 120 Vac model schematic diagram.

P3

PERFORMANCE￿

SWITCH

P4

 

BLACK

 

ON￿

BLACK

J5

WHITE

 

(YELLOW)

 

 

 

 

RED

 

WASH￿

WHITE

 

 

 

(YELLOW)

RED

 

CHECK￿

WHITE

 

RED

 

(RED)

 

 

 

ON-OFF/3-SPEED FAN SWITCH

PUSH BUTTONS WIRING TERMINALS

HI

ON

MED

HI

LO

MED

OFF

LO

 

L1￿

BLACK

ORANGE

￿

 

￿

(HOT)

 

 

3

1

 

 

 

 

L2

 

 

 

GROUND

 

 

POWER￿

SUPPLY

P2

P1

BROWN

VIOLET

BLUE

RED

FAN￿

MOTOR

WHITE

BLACK COLLECTOR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RED IONIZER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TEST￿

 

 

 

 

 

RED

 

BUTTON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONTACT￿

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

￿

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BOARD

 

 

 

 

 

 

 

 

 

 

 

 

BLACK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

￿

1￿ POWER SUPPLY. PROVIDE DISCONNECT MEANS ￿ ￿ AND OVERLOAD PROTECTION AS REQUIRED.￿

￿

￿

2￿ LEFT CELL AND CONTACT BOARD ON￿ ￿ TWO-CELL AIR CLEANER ONLY.￿

￿

￿

3￿ INTERLOCK SAFETY SWITCH.￿

￿

￿

￿

M11576

Fig. 23. F90A 120 Vac model schematic diagram.

19

68-0103-6 Revised 11-07

Image 19
Contents Contents Features ApplicationOrdering Information SpecificationsApplication and Operation Planning the InstallationChoose Location Determine Number of F90 NeededSolution Example 1. Sizing by Air Changes per Hour and Room VolumeOutdoor Air Example 2. Sizing by Occupant Load InstallationWhen Installing this Product… Example 3. Sizing by Air Changes per Hour and Room VolumeF90 can be mounted in any of four ways Mounting the F90 Using Lag ScrewsUnpacking MountingInstalling the Wash LED Mount the steel rods to the supports Mounting the F90 Using Threaded Steel RodUsing the mounting template to locate holes Arrange two 2 x 4 supports as shown in FigPower Cord WiringPermanent Wiring Installing Activated Carbon Filters, Cells, and PrefiltersService AdjustmentsCheckout Hazardous Chemical Can cause personal injury Cleaning the F90Cleaning the Prefilter Cleaning the Cell Using Alkaline Base DetergentRemoving Specific Contaminants from the Cell Discolored AluminumModifying to Reduce Ozone Odor Replacing Ionizer WiresTools And Equipment Electrical TroubleshootingTroubleshooting Procedure Removing The Power BoxStart Removing the F90 Power Box Assembly F90A 120 Vac model schematic diagram F90A 230 Vac model schematic diagram CE compliant model F90B 120 Vac model schematic diagram Parts and Optional Accessories Not Illustrated Replacement Parts LIST/EXPLODED ViewF90A exploded view. Part numbers are keyed to Parts List How to make a warranty claim or have questions answered Limited ONE-YEAR Warranty