Installation
Model SCS-130 Transformer Card
Description
The
3 Amp 250V | |
| J2 |
COM | HOT |
J3 | To fan |
|
AC Power Cord
Installation
Always remove power to the
1.Install the
2.Connect the
3.Connect the cable from the right end of the modem rack labeled J2 to J2 on the right side of the
4.Connect the
AC Power Connection
Connect 120 VAC to the
1.Install the supplied strain relief onto the AC power cord approximately 12 inches from the AC wires.
2.Feed the end of the AC power cord through the backplate knockout until the strain relief snaps into place.
3.Connect the White AC power cord wire to the COM terminal on the bottom of the
4.Connect the Black AC power cord wire to the HOT terminal on the bottom of the
5.Connect the Green AC power cord ground wire to the grounding lug located on the right side of the enclosure.
The AC power must be provided by a listed UPS. A signal shall be provided at the operators console when the UPS power source switches from primary power to secondary power.
DO NOT APPLY POWER TO THE RECEIVER UNTIL THE REAR COVER IS REPLACED ON THE RECEIVER CABINET.
Three Amp Fuse
The 120 VAC connection to the
Digital Monitoring Products |
13