Kenmore 153.335846, 153.335863, 153.335943, 153.335963 owner manual PVC Schedule 40 vent piping

Page 21

Installation Instructions (cont'd)

Venting (cont'd)

ALL MODELS

3" PVC Schedule 40 vent piping:

1.A 3" ABS Schedule 40-45 ° vent cap with wire screen is sup- plied with the water heater.

2.A 5' section of 3" PVC Schedule 40 pipe (more may be required and must be supplied locally).

3.3" PVC, ABS or CPVC Schedule 40 piping and fittings are acceptable materials for the vent system on all 40 gallon models and 50 gallon 40,000 BTU/HR models.

ALL 40 GALLON AND 50 GALLON 40,000 BTU/HR

MODELS _ OPTIONAL 2" VENT PIPING

2" PVC Schedule 40 vent piping:

1.A wire screen to fit a 2" Schedule 40-45 ° vent cap is supplied with the water heater.

2.A 3" PVC Schedule 40 pi!_e, minimum length of 3" (must be supplied locally).

3.A 3" to 2" PVC Schedule 40 reducer (must be supplied locally).

4.2" and 3" PVC, ABS, or CPVC Schedule 40 piping and fit- tings are acceptable materials for the vent system on all 40

gallon and 50 gallon 40,000 BTU/HR models and must be supplied locally.

2" SCHEDULE 40 PVC PIPE

[_ 3" TO 2" PVC REDUCER

] 3" SCHEDULE 40 PVC PIPE

(MINIMUM LENGTH 3")

I I

21

Image 21
Contents Water Heater For Your SafetyWhat to do if YOU Smell GAS Or Operating this Water HeaterDEATH, Serious Bodily INJURY, or Property Safety PrecautionsSafety Precautions on Safety PrecautionsAwarning AwarningjAwarning Contents Customer Responsibilities Install or Operate the Water HeaterMaterials and Basic Tools Needed Additional Tools Needed When Sweat SolderingInstallation Instructions Removing the Old Water HeaterWater passingouve While this may reduce the chancesof flammablevaporsfrom a Locating the New Water HeaterThis warningmay result in a fire hazard Heateradjacentto the gascontrolvalvefor all clearancesContd Installation InstructionsVenting Clearances IFigure 3aVenting Through Roof- Clearances Installation Instructions contdVErTm Installation Completed Using Sears Installation KIT Temperature RegulationsectioninthismanualWater Piping Hotter Water can SCALDWater heatersare intendedtoAt the time of manufacturethis water heater was provided Temperature-Pressure Relief ValveUSE with Power Cord WiringUSE Without Power Cord Filling the Water HeaterInstallation Instructions contd Wiring DiagramVenting Venting Through AN Outside Wall ALL Models Venting contdVenting System Example Installations for ALL Models Installation Showing USE of PVC, ABS or Cpvc Pipe PrecautionsVenting Through a Roof ALL Models Connecting PVC Pipe Vent to BlowerPVC Schedule 40 vent piping Sediment Trap Gas PipingGAS Piping with GAS Piping with ALL Black Iron Pipe to GAS ControlInstallation Checklist ContdBefore Lighting the Pilot Before the Water Heater will Operate Operating InstructionsLighting By this Water Heater For Your Safety If YOU Shell GASAwarning Before Lighting Propane L.R GAS Water AN Odorant iS Added to the GAS UsedWhattodoif Yousmellgas Operating Instructions contdTemperature Regulation Operating Instructions contdSonunattendedin a bathtubor shower Tank Sediment Cleaning Service and AdjustmentBurner Inspection Oiling InstructionsGas Control Valve & Burner Assembly Replacement Information Service and Adjustment contdTemperature-Pressure Relief Valve Operation DrainingDrain Valve Washer Replacement ServiceHousekeeping Start Up Conditions Strange SoundsThermal Expansion Operational Conditions Troubleshooting Guide contdCondensation SMOKE/ODORHigh Temperature Shut OFF System Operational Conditions contdWater is TOO HOT Acautioni Leakage CheckpointsThermostat and GAS Supply Check Troubleshooting Guide contd0RE Guide contd TroubleshootingAcaution Property DamageYes Page Parts Order List Power Miser TM 9 Power Vent GAS Water HeatersParts Order List contd Power Miser TM 9 Power Vent GAS Water Heaters Model NumbersParts Order List Part Description Parts Order List contdMY-HOMIE Warranty