Kenmore 153.335943, 153.335863, 153.335846 Venting System Example Installations for ALL Models

Page 18

Installation Instructions (cont'd)

VENTING SYSTEM EXAMPLE INSTALLATIONS FOR ALL MODELS

The vent piping cannot under any circumstances be run down- hill.

The vent piping can be inst_led as follows:

1. No more than 3 elbows can be used.

2. Horizontal runs require a minimum V,,"rise per foot.

35'MAX. 16" MIN,

13" MIN.

MIN.

MIN. RISE ¼"

I1"

PERFOOT

 

 

3.The total vertical and horizontal run cannot exceed 35'

for 3" vent piping (20' maximum if 2" vent piping is _:se_ on 40,000 BTU/Hr. models) with a maximum of three 90 ° elbows.

MIN. RISE¼"

MAX.

MIN. RISE I/4"

PER FOOT

MAX. 3

MIN. RISE 1/4"

PERFOOT

ONE ELBOW

PERFOOT

MIN. RISE ¼"

PERFOOT

MIN. RISE }/4"

PER FOOT

MIN. RISE¼"

PERFOOT

I

18

Image 18
Contents What to do if YOU Smell GAS For Your SafetyWater Heater Or Operating this Water HeaterSafety Precautions DEATH, Serious Bodily INJURY, or PropertySafety Precautions Safety Precautions onAwarning AwarningjAwarning Contents Install or Operate the Water Heater Customer ResponsibilitiesAdditional Tools Needed When Sweat Soldering Materials and Basic Tools NeededInstallation Instructions Removing the Old Water HeaterWater passingouve This warningmay result in a fire hazard Locating the New Water HeaterWhile this may reduce the chancesof flammablevaporsfrom a Heateradjacentto the gascontrolvalvefor all clearancesVenting Clearances Installation InstructionsContd IFigure 3aInstallation Instructions contd Venting Through Roof- ClearancesVErTm Water Piping Temperature RegulationsectioninthismanualInstallation Completed Using Sears Installation KIT Hotter Water can SCALDWater heatersare intendedtoTemperature-Pressure Relief Valve At the time of manufacturethis water heater was providedUSE Without Power Cord WiringUSE with Power Cord Filling the Water HeaterInstallation Instructions contd Wiring DiagramVenting Venting contd Venting Through AN Outside Wall ALL ModelsVenting System Example Installations for ALL Models Precautions Installation Showing USE of PVC, ABS or Cpvc PipeConnecting PVC Pipe Vent to Blower Venting Through a Roof ALL ModelsPVC Schedule 40 vent piping GAS Piping with Gas PipingSediment Trap GAS Piping with ALL Black Iron Pipe to GAS ControlInstallation Checklist ContdBefore Lighting the Pilot Operating Instructions Before the Water Heater will OperateAwarning Before Lighting Propane L.R GAS Water By this Water Heater For Your Safety If YOU Shell GASLighting AN Odorant iS Added to the GAS UsedOperating Instructions contd Whattodoif YousmellgasTemperature Regulation Operating Instructions contdSonunattendedin a bathtubor shower Burner Inspection Service and AdjustmentTank Sediment Cleaning Oiling InstructionsTemperature-Pressure Relief Valve Operation Service and Adjustment contdGas Control Valve & Burner Assembly Replacement Information DrainingDrain Valve Washer Replacement ServiceHousekeeping Start Up Conditions Strange SoundsThermal Expansion Condensation Troubleshooting Guide contdOperational Conditions SMOKE/ODORHigh Temperature Shut OFF System Operational Conditions contdWater is TOO HOT Leakage Checkpoints AcautioniTroubleshooting Guide contd Thermostat and GAS Supply Check0RE Acaution TroubleshootingGuide contd Property DamageYes Page Power Miser TM 9 Power Vent GAS Water Heaters Parts Order ListPower Miser TM 9 Power Vent GAS Water Heaters Model Numbers Parts Order List contdParts Order List Parts Order List contd Part DescriptionWarranty MY-HOMIE