New Buck Corporation FS 21 installation instructions Floor Protection

Page 20

Floor Protection:

Floor protection must be 3/8” minimum thickness non-combustible material or equivalent.

How to use alternate materials and how to calculate equivalent thickness

An easy means of determining if a proposed alternate floor protector meets requirements listed in the appliance manual is to follow this procedure:

1. Convert specification to R-value:

R-value is given—no conversion is needed.

K-factor is given with a required thickness (T) in inches: C-factor is given: R=1/C

2. Determine the R-value of the proposed alternate floor protector.

Use the formula in step (1) to convert values not expressed as “R”

For multiple layers, add R-values of each layer to determine the overall R-value.

3.If the overall R-value of the system is grater than the R-value of the specified floor protec- tor, the alternate is acceptable.

Example:

The specified floor protector should be 3/4” thick material with a K-factor of 0.84.

The proposed alternate is 4” brick with a C-factor of 1.25 over 1/8” mineral board with a K-factor of 0.29.

Step (a): Use formula above to convert specification to R-value. R= 1/K x T = 1/0.84 x .75 = 0.893

Step (b): Calculate R of proposed system. 4” brick of C=1.25, therefore Rbrick = 1/C = 1/1.25 =0.80 1/8” mineral board of K = 0.29, therefore Rmin.bd. =1/029 x0.125 = 0.431

Step (c): Compare proposed system R of 1.231 to specified R of 0.893. Since proposed system R is greater than required , the system is acceptable.

Definitions:

 

 

 

Btu

 

W

 

 

Thermal conductance

=

C

=

=

 

 

(hr)(ft²)(°F)

(m²)(°K)

 

 

Thermal conductance

=

K

=

(Btu)(inch)

=

W

=

(Btu)

(hr)(ft²)(°F)

(m)(°K)

(hr)(ft)(°F)

Thermal conductance

= R =

(ft²)(hr)(°F)

=

(m²)(°K)

 

 

 

 

 

 

Btu

 

W

 

 

Install in accordance with 24 CFR, Part 3280 (HUD).

Page 18

Image 20
Contents Model FS NON-CATALYTIC Unit Page Table of Contents INSTALLATION, OPERATION, Maintenance Instructions Model FS Read this First Important InstructionsSection IntroductionPreparing the Stove for Installation ChimneyFloor Protection Preparing the Room Heater Location Model HOW to Locate Chimney Exit and Install 15.5 Residential and Mobile Home Installation C D E F G HOW to Locate Chimney Exit and Install Chimney Reefer to MANUFACTURER’S Installation Instruction OUT Side AIR Installation Tools for InstallationFlashing Final Check Section Alcove Installation Clearances Floor Protection Alcove Installation Alcove Installation Clearances Final Check Page Section Operation Building a FireASH Removal Instructions Sure to Turn Blower OFF Before Removing AshesPage Step Wire Diagram #10 16 X 1/2 HEX Head #6 32 X 1/2 Slot Head Screw Section Wood Heater Safety Section Troubleshooting Problem Possible Cause SolutionProducts Covered Warranty Time PeriodsProcedure Owner Registration Card Conditions and ExclusionsOther Rights