New Buck Corporation FS 21 installation instructions Alcove Installation

Page 21

HOW TO LOCATE CHIMNEY EXIT AND INSTALL

Alcove Installation

Vertical Exit using (6" DVL Close Clearance pipe and any Listed 2100° UL 103 HT chimney).

With optional close clearance shield and pipe shield. NOTE: For installation of optional close clearance shields and pipe shield (See Page 22).

NOTE: For minimum clearances (See Page 20, Figure 11).

1.Suspend a plumb bob from the ceiling above the unit so that the weight is hanging in the center of the flue exit. (A small weight on a string will serve as a plumb bob). Mark the ceiling where the string is suspended to locate the center of the chimney.

2.After locating the center of the hole, install the ceiling support box, chimney or chimney connector, flashing and rain cap per the chimney manufacturer’s instructions and local building codes for installation through combustible walls or ceilings.

3.Now connect the stove and ceiling support box using DVL close clearance pipe. Connect each section per manufacturer’s instructions.

Secure each section to each other using minimum (3) sheet metal screws or rivets. DVL close clearance is to be connected with (3) sheet metal screws or rivets to connector collar on heater.(See Page 20,Figure 12).

Page 19

Image 21
Contents Model FS NON-CATALYTIC Unit Page Table of Contents Read this First Important Instructions INSTALLATION, OPERATION, Maintenance Instructions Model FSIntroduction SectionChimney Preparing the Stove for InstallationFloor Protection Preparing the Room Heater Location Model HOW to Locate Chimney Exit and Install 15.5 Residential and Mobile Home Installation C D E F G HOW to Locate Chimney Exit and Install Chimney Reefer to MANUFACTURER’S Installation Instruction Tools for Installation OUT Side AIR InstallationFlashing Final Check Section Alcove Installation Clearances Floor Protection Alcove Installation Alcove Installation Clearances Final Check Page Building a Fire Section OperationSure to Turn Blower OFF Before Removing Ashes ASH Removal InstructionsPage Step Wire Diagram #10 16 X 1/2 HEX Head #6 32 X 1/2 Slot Head Screw Section Wood Heater Safety Problem Possible Cause Solution Section TroubleshootingWarranty Time Periods ProcedureProducts Covered Conditions and Exclusions Other RightsOwner Registration Card