New Buck Corporation FS 21 installation instructions Floor Protection

Page 7

Floor Protection:

Floor protection must be 3/8” minimum thickness non-combustible material or equivalent.

How to use alternate materials and how to calculate equivalent thickness

An easy means of determining if a proposed alternate floor protector meets requirements listed in the appliance manual is to follow this procedure:

1. Convert specification to R-value:

R-value is given—no conversion is needed.

K-factor is given with a required thickness (T) in inches: C-factor is given: R=1/C

2. Determine the R-value of the proposed alternate floor protector.

Use the formula in step (1) to convert values not expressed as “R”

For multiple layers, add R-values of each layer to determine the overall R-value.

3.If the overall R-value of the system is grater than the R-value of the specified floor protec- tor, the alternate is acceptable.

Example:

The specified floor protector should be 3/4” thick material with a K-factor of 0.84.

The proposed alternate is 4” brick with a C-factor of 1.25 over 1/8” mineral board with a K-factor of 0.29.

Step (a): Use formula above to convert specification to R-value. R= 1/K x T = 1/0.84 x .75 = 0.893

Step (b): Calculate R of proposed system. 4” brick of C=1.25, therefore Rbrick = 1/C = 1/1.25 =0.80 1/8” mineral board of K = 0.29, therefore Rmin.bd. =1/029 x0.125 = 0.431

Step (c): Compare proposed system R of 1.231 to specified R of 0.893. Since proposed system R is greater than required , the system is acceptable.

Definitions:

 

 

 

Btu

 

W

 

 

Thermal conductance

=

C

=

=

 

 

(hr)(ft²)(°F)

(m²)(°K)

 

 

Thermal conductance

=

K

=

(Btu)(inch)

=

W

=

(Btu)

(hr)(ft²)(°F)

(m)(°K)

(hr)(ft)(°F)

Thermal conductance

= R =

(ft²)(hr)(°F)

=

(m²)(°K)

 

 

 

 

 

 

Btu

 

W

 

 

Install in accordance with 24 CFR, Part 3280 (HUD).

Page 5

Image 7
Contents Model FS NON-CATALYTIC Unit Page Table of Contents Read this First Important Instructions INSTALLATION, OPERATION, Maintenance Instructions Model FSIntroduction SectionChimney Preparing the Stove for InstallationFloor Protection Preparing the Room Heater Location Model HOW to Locate Chimney Exit and Install 15.5 Residential and Mobile Home Installation C D E F G HOW to Locate Chimney Exit and Install Chimney Reefer to MANUFACTURER’S Installation Instruction Tools for Installation OUT Side AIR InstallationFlashing Final Check Section Alcove Installation Clearances Floor Protection Alcove Installation Alcove Installation Clearances Final Check Page Building a Fire Section OperationSure to Turn Blower OFF Before Removing Ashes ASH Removal InstructionsPage Step Wire Diagram #10 16 X 1/2 HEX Head #6 32 X 1/2 Slot Head Screw Section Wood Heater Safety Problem Possible Cause Solution Section TroubleshootingProcedure Warranty Time PeriodsProducts Covered Other Rights Conditions and ExclusionsOwner Registration Card