New Buck Corporation FS 21 installation instructions Step Wire Diagram

Page 28

STEP 1

STEP 2

STEP 3

WIRE DIAGRAM

Page 26

Image 28
Contents Model FS NON-CATALYTIC Unit Page Table of Contents INSTALLATION, OPERATION, Maintenance Instructions Model FS Read this First Important InstructionsSection IntroductionPreparing the Stove for Installation ChimneyFloor Protection Preparing the Room Heater Location Model HOW to Locate Chimney Exit and Install 15.5 Residential and Mobile Home Installation C D E F G HOW to Locate Chimney Exit and Install Chimney Reefer to MANUFACTURER’S Installation Instruction OUT Side AIR Installation Tools for InstallationFlashing Final Check Section Alcove Installation Clearances Floor Protection Alcove Installation Alcove Installation Clearances Final Check Page Section Operation Building a FireASH Removal Instructions Sure to Turn Blower OFF Before Removing AshesPage Step Wire Diagram #10 16 X 1/2 HEX Head #6 32 X 1/2 Slot Head Screw Section Wood Heater Safety Section Troubleshooting Problem Possible Cause SolutionProcedure Warranty Time PeriodsProducts Covered Other Rights Conditions and ExclusionsOwner Registration Card