Heat & Glo LifeStyle 8000TVD manual Service Parts, Log Set Assembly

Page 4

Service Parts

(NG, LP) Exploded Parts Diagram (GN, PL) Vue éclatée des pièces

6

8

5

18

3

*Part number list on following page.

*La liste des numéros de pièce se trouve à la page suivante.

8000TVD

Beginning Manufacturing Date: 9-97

Ending Manufacturing Date: ______

4

7 1

2

9Log Set Assembly

10

17

 

 

 

12

14

15

11

 

 

 

13

16

 

 

4

Image 4
Contents Installers Guide What to do if you smell gasSafety and Warning Information Table of Contents Service Parts Log Set AssemblyCommon Parts / Piéces Communes Standing Pilot Ignition Valve Assembly Intermittent Pilot Ignition Valve Assembly 8000TVD-IPIInstallation Codes High Altitude Installations1Approvals Codes Appliance CertificationPre-install Preparation 2Getting StartedIntroducing the Heat-N-Glo Gas Fireplaces Unit with damaged, incomplete, or substitute partsDiagram of 8000TVD Locating the Fireplace 3Installing the FireplaceFraming the Fireplace Negative Pressure Make-up Air Installing Optional Outside Make-up AirAir Damper Installing the Vent System Vent System Approvals System ComponentsRise to RUN Ratio = Maximum NO. Of Elbows 2 90o or 4 45oVice Must be Wired to the Fireplace Junction BOX Positioning, Leveling, and Securing the FireplaceGas Control Systems Roof PitchGas Supply Line Gas Pressure RequirementsPressure Natural Gas Propane Standing PilotWiring the Fireplace For Standing Pilot Ignition Wiring Appliance RequirementsWall Switch Optional AccessoriesFor Intermittent Pilot Ignition IPI Wiring Volt Transformer Operation using Battery PowerInstalling Trim, Logs, and Ember Material FinishingAfter the Installation Double-check for faulty componentsBefore Lighting the Fireplace Lighting the FireplaceMaintaining and Servicing Your Fireplace Fireplace MaintenanceImportant Turn OFF the GAS Before Servicing Your Fireplace