Installing an AS8

STEP 8 - Double-checking the Chimney Assembly.

Continue assembling the chimney sections up through the firestop spacers as needed. While doing so, be aware of the height and unsupported chimney length limitations that are given on page 11 under “Chimney Requirements”.

Check each section by pulling up slightly from the top to ensure proper engagement before installing the succeeding sections. If they have been connected correctly, they will not disengage when tested.

STEP 9 - Securing the Chimney System.

When offsets and returns are joined to straight pipe sections, they must be locked into position with the screws provided, using the predrilled holes. To prevent gravity from pulling the chimney sections apart, the returns and the chimney stabilizers have straps for securing these parts to joists or rafters.

See Figure 15.

NOTE: Be sure to provide support for the pipe during construction and check to be sure inadvertent loading has not dislodged the chimney section from the fireplace or at any chimney joint.

WARNING!

WHEN CHIMNEY SECTIONS EXCEED-

ING SIX FEET IN LENGTH ARE

INSTALLED BETWEEN AN OFFSET/ RETURN, STRUCTURAL SUPPORT MUST BE PROVIDED TO REDUCE OFF-CENTER LOADING AND PRE- VENT CHIMNEY SECTIONS FROM SEPARATING AT THE CHIMNEY JOINTS.

STEP 10 - Marking the Exit Point of the Roof.

Locate the point where the chimney will exit the roof by plumbing down to the center of the chimney. Drive a nail up through the roof to mark the center. See Figure 16.

FIRESTOP

STRAPS

JOINT

BAND

OPTIONAL(OPTIONAL)

ADDITIONAL

SUPPORT

Figure 15 - Offset/Return with Stabilizer

4-00

16

Figure 16

Ceiling and Attic Construction

STEP 11 - Cutting Out the Hole in the Roof.

Measure to either side of the nail and mark the 1412" x 1412" opening required. This is measured on the hori- zontal; actual length may be larger depending on the pitch of the roof. Cut out and frame the opening.

See Chapter 25 of the Uniform Building Code for Roof Framing details. Be sure to maintain a 2" mini- mum air space between the chimney section and the roof.

30491D

Image 16
Contents Woodburning Fireplace Installation & Operating Instructions For Residential USEPlease Retain this Manual for Future Reference Listings and Code Approvals Description of the Fireplace SystemFireplace/Integral Grate Chimney System Hearth Extension Glass Doors Heat Circulating FansFireplace System Components HTI Catalog # DescriptionAS8 Integral Grates Insulated DuctID4 Outside AIR KIT Uninsulated DuctChimney Sections Chimney Stabilizer OFFSETS/RETURNS HTI CAT.#Firestop Spacers Roof Flashing Chimney Bracket Joint BandChimney Terminal Caps & Vent Sections Round Terminal CAPWith Storm Collar Square Terminal CAPPRE-INSTALLATION Preparation Fireplace Locations and Space RequirementsWithout Outside AIR With Outside AIR CAT. #Framing the Fireplace Hearth Extensions Factory-Built Hearth ExtensionUsing Offsets and Returns Chimney RequirementsSIDEWALLS/SURROUNDS MantelOffset Chart SL306 SL312 SL318 SL324 SL336 SL348 Chimney Offset/ReturnChimney Height REQUIREMENTS. Above the roof line Determining the Number of Chimney Sections RequiredPositioning the Fireplace Placing the Protective Metal Hearth StripsLeveling the Fireplace Positioning the Metal StripsInstalling the Firestop Spacers Assembling Chimney SectionsSecuring the Chimney System Installing an AS8 Double-checking the Chimney AssemblyMarking the Exit Point of the Roof Installing Roof Flashing optional Installing an Outside Combustion Air KitAssembling the Chimney Sections Outside Air LocationConstructing a Chase Chase Assembly Installing a Terminal Cap on a Chase Enclosed ChimneyMaterials for the Chase Operating Instructions Installing a Terminal CapEdges are SHARP! Hand PRO Tection is Recommended Sectional View of Fireplace Recommended Operating Positions of DoorsBW36 Series Woodburning Fireplace Terminal Caps Warranty For HEAT-N-GLO Fireplaces