Desa CDV34PA, CDV34NA PRE-INSTALLATION Preparation, Clearances, Location and Space Requirements

Page 4

CDV34NA, PA

DIRECT-VENT FIREPLACE (NATURAL/PROPANE/LP)

PRE-INSTALLATION PREPARATION

CLEARANCES

Minimum clearances to combustibles for the fireplace are as follows:

Must maintain a minimum 1" clearance to combustibles

LOCATION AND SPACE REQUIREMENTS

Determine the safest and most efficient loca- tion for your Comfort Glow direct-vent fire- place. Make sure that rafters and wall studs are not in the way of the venting system. Choose a location where the heat output is not affected by drafts, air conditioning ducts, windows or doors. Figure 2 shows some common locations. Read all venting infor- mation in this manual. Be aware of all re- strictions and precautions before deciding the exact location for your fireplace.

When deciding the location of your fire- place, follow these rules:

1.Do not connect this fireplace to a chim- ney flue serving a separate solid-fuel burning fireplace or appliance.

2.Due to high temperatures, do not lo- cate this fireplace in high traffic areas or near furniture or draperies.

3.Proper clearances must be maintained.

4.If your fireplace is to be installed di- rectly on carpeting, vinyl tile, or any combustible material other than wood, it must be installed on a metal or wood panel extending the full width and depth of the fireplace. See Figure 3.

Back, and sides

0"/mm

Perpendicular walls

6" (152mm)

Floor

0"/mm

Ceiling to louver opening

42" (1067mm)

Front

36" (914mm)

Top of Standoffs

0"/mm

See General Venting on page 5 for specific venting clearances.

FRAMING AND FINISHING

Figures 4 and 5 show typical framing of this fireplace. Figure 6 on page 5 shows framing for corner installation. All minimum clear- ances must be met. Do not install fireplace directly on carpeting, vinyl tile, or any com- bustible material other than wood. The fire- place must set on a metal or wood panel extending the full width and depth of the fireplace.

See Accessories on page 31 for mantel kits available for this fireplace. If you are using a separate combustible mantel piece, refer to Figure 7 on page 5 for proper installation height. You can install noncombustible man- tels at any height above the fireplace. Note: Noncombustible mantels may discolor!

34"

20"

5/8" for drywall facing

Figure 5 - Framing Clearances for Typical Fireplace Installation

Flush with a wall

Through exterior wall enclosed in a chase

Corner installation

34 1/4"

Figure 2 - Common Fireplace Locations

 

 

 

 

RW

 

 

 

 

D

 

 

 

 

 

 

 

 

 

FW

 

 

 

 

 

 

 

 

 

 

 

 

 

Fireplace size

 

D x FW x RW

34"

 

 

18 1/2"

34 3/8"

14"

34 3/4"

20" Vertical Termination

19" Horizontal Termination

Figure 4 - Framing Clearances for Installation Against an Exterior Wall

Figure 3 - Fireplace Bottom Dimensions

4

105982

Image 4 Contents
For Your Safety What to do if YOU Smell GAS For Your SafetyNatural GAS Model CDV34NA PROPANE/LP GAS Model CDV34PA Safety Information DIRECT-VENT Fireplace NATURAL/PROPANE/LPProduct Features Product IdentificationLocal Codes Glossary TermsPRE-INSTALLATION Preparation ClearancesLocation and Space Requirements Framing and FinishingGeneral Venting Location of Vent TerminationGeneral Venting Venting Installation Installation PrecautionsInstallation Planning Installing Vent System in a ChaseInstallation for Horizontal Termination Snorkel TerminationVent Pipe Connections Horizontal Termination Configurations Horizontal VentingVenting with Two 90 Elbows Flat Ceiling Installation Installation for Vertical TerminationCathedral Ceiling Installation Vertical Termination Configurations Venting with One 90 ElbowVertical Venting High Altitude Installation Parts Lists for Venting Kits and ComponentsComfort Glow Rigid Venting Comfort Glow Flexible VentingFireplace Installation Installing Optional Blower AccessoryInstalling GA3750/CDA3620T Blowers Check GAS TypeIf your fireplace system is installed Installing GAS Piping to Fireplace Location Installation Items NeededPressure Testing Gas Supply Piping System Connecting Fireplace to GAS SupplyChecking GAS Connections Pressure Testing Fireplace Gas Connections Close manual shutoff valve see Fig- ureInstalling 9-Volt Alkaline Battery into Receiver Installing Optional Wireless HAND-HELD Remote ControlREMOVING/REPLACING Glass Door Installing Optional Brick Liner CD8037A Attaching Magnetic Decorative Brass StripsInstalling LOGS, Lava Rock and Glowing Embers Installing Log NoFor Your Safety Read Before Lighting Manual Lighting ProcedureOperating Fireplace Lighting InstructionsOperating Optional Blower Accessory Pilot AssemblyInspecting Burners Optional Remote OperationCleaning and Maintenance Glass DoorPilot and Burners LogsTroubleshooting Observed Problem Possible CauseObserved Problem Possible Cause Remedy Gas leak. See Warning statement Replacement Parts Service HintsWiring Diagram Technical ServiceAccessories Illustrated Parts Breakdown CDV34NA CDV34PA33Parts List DIRECT-VENT Fireplace CDV34NA CDV34PAWarranty Information