Enviro Indoor Gas Fireplace owner manual Kit Parts List, Conversion Kit Installation

Page 11

Maintenance And Service

FUEL CONVERSION:

TO BE INSTALLED BY A QUALIFIED SERVICE AGENCY ONLY

Please read and understand these instructions before installing.

Warning: This conversion kit shall be installed by a qualified service agency in accordance with the manufacturer’s instructions and all applicable codes and requirements of the authority having jurisdiction. If the information in these instructions is not followed exactly, a fire, explosion or production of carbon monoxide may result causing property damage, personal injury or loss of life. The qualified service agency is responsible for the proper installation of this kit. The installation is not proper or complete until the operation of the converted appliance is checked as specified in the manufacturer’s instructions supplied with the kit.

Kit Parts List:

1 - Orifice (NG #32 DMS or LP #49 DMS)

1 - Pilot Injector (NG 0.62 mm; LP 0.35 mm)

1 - Installation instruction sheet

1 - Conversion label

Carefully inspect all parts supplied with this conversion kit. If any parts have been damaged or are missing, contact your dealer, distributor or courier company to have them replaced before starting this installation.

Conversion Kit Installation:

1.Turn control knob on the gas valve to the “OFF” position and shut the gas supply off at the shut-off valve upstream of the unit. CAUTION: The gas supply must be shut off prior to disconnecting the electrical power and before proceeding with the conversion. Allow the valve and unit to cool down to room temperature.

2.Remove the glass as shown in the MAINTENANCE AND SERVICE - GLASS DOOR REMOVAL.

3.Carefully remove the log set and ember material if they are installed.

4.Remove the burner as shown in the MAINTENANCE AND SERVICE - BURNER AND BLOWER REMOVAL.

5.Convert the burner orifice(s):

a)Remove the main burner orifice with a 1⁄2 inch deep socket.

b)Put a bead of pipe-thread sealant or approved Teflon tape on the orifice threads before installing into the brass elbow.

c)Install the new orifice(s) from the kit into the brass elbow.

6.Convert the pilot injector:

a)Pull the pilot hood straight up to access the pilot injector.

b)Using a 5/32” or 4 mm Allen key, remove the pilot injector.

c)Install the new pilot injector supplied with this conversion kit. Simply screw the new injector inside the pilot hood using the Allen key,

d)Reinstall the hood by placing the hood on the assembly, line up the key way, and snap into place.

7.Convert the SIT gas valve:

a)Remove the black protection cap from the HI/LO knob by hand shown in Figure 11.

Figure 11: Removing

valve cap.

11

Image 11
Contents Sienna General Safety PrecautionsTable of Contents Vented GAS Fireplace Heater Sienna BV/DV NG/LPG Codes And ApprovalsDimensions Specifications33 x 46 84cm x 193 cm Pilot Lighting Instructions Operating InstructionsFan control Component Sound & ReasonMaintenance And Service Qualified Installers only Conversion Kit Installation Kit Parts ListFlip valve Reconnect the electrical power to the unitSienna Initial InstallationDescription of Fireplace Dimension Direct Vent Width At Back Direct Vent Model Venting Fireplace Inserts Fan is thermostatically controlled and it will To Test Valve Pressures Gas Line ConnectionConverting a Direct Vent Fireplace to a B-VENT Fireplace Run to the outside of the panel Secondary InstallationLeft trim is so the power cord can be LOG SET and Ember Installation Third Stage Log Set Installation Sienna complete log set-up with embers burning Never operate the fireplace with the glass door removedBrick panel set is fragile, handle with extreme care Problem Possible Cause Solution Trouble ShootingNumber Parts List- Unit ComponentsParts Diagram Components Parts Diagram Burner Parts List Options Parts Diagram Options To the Dealer WarrantyInstallation Data Sheet