Universal Control System – Natural gas
III Wiring
For your safety, turn off electrical power supply before making any electrical connections to avoid possible electrical shock hazard.
1.All wiring must be installed in accordance with the requirements of the National Electrical Code and any additional national, state or local code requirements having jurisdiction. All wiring must be N.E.C. Class 1.
2.The boiler must be electrically grounded in accordance with the National Electrical Code, ANSI/NFPA No.
3.Canadian installations must conform to CSA C22.1 Canadian Electrical Code Part 1 and any local or provincial codes.
4.Supply wiring to the boiler must be No. 14 gauge or heavier. Install in conduit.
5.A separate electrical circuit with a fused disconnect switch (15 amp. recommended) should be used for the boiler.
Sequence of operation 1. Operating control begins
a. Limit control contacts are closed.
2.
On failure to sense pilot flame or main flame, control will wait 5 minutes then retry for ignition.
a.Pilot solenoid opens.
b.Pilot ignition spark begins.
c.Pilot ignites.
d.Pilot proves.
3.Main
a.Secondary gas valve opens.
b.Main gas valve opens to low fire position.
c.Main burners ignite at low fire.
d.Main flame sensor proves low fire carryover.
e.Main gas valve opens to high fire position.
f.Main burners increase to high fire.
4.Dual base assembly
5.Boiler shuts down when operating control is satisfied.
Part Number | 5 |