Page 12

6 Putting the humidifier into operation

6.1 Start-up

Prior to starting the unit up, check the correct connections of the steam pipe, water feed pipe, drainage pipes and electrical cables.

Open the shut-off valve in the water feed pipe and switch the unit on with the black power switch.

As soon as the demand for steam is recognised, the green LED lights up, the contactor is activated and , soon after, water is let into the steam cylinder. As soon as the electrodes in the cylinder are covered with water, it is being heated and the fully automatic operation commences.

During the start-up phase, or after a new replacement cylinder has been fitted, the maximum water level can be attained. When Niveau max. has been reached, the inlet valve closes. This is a normal occurrence during the steam cylinder’s concentration phase. The length of this phase can differ, it lasts until the cylinder has reached the nominal rating. When the Niveau max. is attained it will be indicated by a red flash in the green colour of the LED.

6.2 Setting the output limitation

Button “manual drainage”

Potentiometer

Coding switches

The steam output can be set step less from 20 % to 100 % capacity. For setting the output limitation the electric compartment must be opened and the potentiometer on the electronic print must be adjusted. Turning clockwise increases the steam output and turning anticlockwise reduces the steam output. The output ex works is set at 100 %.

Fig. 6.1

6.3 LED Display

The electronic controls unit of the econoVap monitors the operation of the humidifier continuously.

All operating conditions and system indications are shown with the two-colour LED. The status of the LED can be shining continuously or flashing in the red and green colours.

12

Image 12
Contents Nordmann econoVap List of contents IntroductionSafety Instructions How the humidifier worksInstallation DimensionsDimensions of the units Positioning HumidifierDimensions of the steam distribution pipes Steam NozzleDimensions of the steam blowers 4-23 kg/h General guidelines for the installation Fitting the humidifierFitting the steam-distribution pipe Various fitting methodsFitting the blowers Steam-distribution pipe fitted on suction sideMinimum distances for steam blowers 4-23 kg/h Minimum distances for steam blowers 32-65 kg/hTechnical specifications steam blowers Installation MaterialPossible installation Laying the steam hoseWater connections Water qualitySafety instructions Water intake and drainageElectrical connections Control voltageSetting the output limitation Putting the humidifier into operationStart-up LED DisplaySafety functions System- and servicing indicationsRemote indication Maintenance Rectifying faultsRegular checks Replacing the steam cylinderTaking the humidifier out of operation OptionsProportional adaptor SC-SystemTechnical specifications 4564