7 Gas connections (continued)

Installation & Operation Manual

￿WARNING

￿WARNING

Failure to apply pipe sealing compound as detailed in this manual can result in severe personal injury, death, or substantial property damage.

Use two wrenches when tightening gas piping at boiler (FIG. 7-4), using one wrench to prevent the boiler gas line connection from turning. Failure to support the boiler gas connection pipe to prevent it from turning could damage gas line components.

Natural gas:

Pipe sizing for natural gas

1.Refer to Table 7A for pipe length and diameter. Based on rated boiler input (divide by 1,000 to obtain cubic feet per hour).

a.Table 7A is only for natural gas with specific gravity 0.60 inches, with a pressure drop through the gas piping of 0.5 inches w.c.

b.For additional gas pipe sizing information, refer to ANSI Z223.1 (or B149.1 for Canadian installations).

Figure 7-4Inlet Pipe with Backup Wrench

USE BACKUP WRENCH TO

PREVENT PIPE FROM ROTATING

Natural gas supply pressure requirements

1.Pressure required at the gas valve inlet pressure port:

Maximum 14 inches w.c. (3.5 kPa) with no flow (lockup) or with boiler on.

Minimum 4 inches w.c. (.99 kPa) with gas flowing (verify during boiler startup).

2.Install 100% lockup gas pressure regulator in supply line if inlet pressure can exceed 14 inches w.c. (3.5 kPa) at any time. Adjust lockup regulator for 14 inches w.c. (3.5 kPa) maximum.

Propane Gas:

NOTICE

Maximum inlet gas pressure must not

exceed the value specified. Minimum

 

value listed is for the purposes of input

 

adjustment.

￿WARNING

Knight XL boilers are typically shipped ready to fire on natural gas. Check boiler rating plate to determine which fuel the boiler is set for. If set to natural gas, it may be converted to LP by installing an orifice or by making a gas valve adjustment (see pages 13 and 14). In order to operate on LP gas, an orifice MUST BE installed or a gas valve adjustment MUST BE made. Failure to comply could result in severe personal injury, death, or substantial property damage.

Pipe sizing for propane gas

1.Contact gas supplier to size pipes, tanks, and 100% lockup gas pressure regulator.

Propane Supply Pressure Requirements

1.Adjust propane supply regulator provided by the gas supplier for 14 inches w.c. (3.2 kPa) maximum pressure.

2.Pressure required at gas valve inlet pressure port:

Maximum 14 inches w.c. (3.2 kPa) with no flow (lockup) or with boiler on.

Minimum 8 inches w.c. (1.9 kPa) with gas flowing (verify during boiler startup).

￿ WARNING

Ensure that the high gas pressure regulator

 

is at least 10 feet (3 m) upstream of the

appliance.

47

 

Image 47
Contents Models 400 Contents Please read before proceeding When servicing boilerStainless steel heat exchanger Knight XL How it worksModel Models 601 Knight XL Boiler =B=R Rating RatingsBefore locating the boiler, check Installation must comply withCloset and alcove installations Determine boiler locationAlcove Installation Flooring and foundation Residential garage installationProvide air openings to room Vent and air pipingAreas likely to have contaminants When using an existing vent system to install a new boilerProducts to avoid When removing a boiler from existing common vent system Gas conversions Model Prepare boilerRemove boiler from wood pallet Leveling the boiler Models 601General venting Direct venting options Vertical Vent General venting Install vent and combustion air pipingRequirements for installation in Canada Installing vent or air pipingVent Pipe, and Fittings PVC/CPVC air intake/vent connectionsStainless steel vent Air inlet pipe materialsStainless Steel Air Intake/vent Connections FasNSeal Saf-T VentRemoving from existing vent Optional room airAir contamination Model Description Kit NumberDetermine location If using the alternate sidewall terminationSidewall direct venting Vent/air termination sidewall3AClearance to Gravity Air Inlets Bird Screen Typical Prepare wall penetrationsTermination and fittings Prepare wall penetrations Alternate Field Supplied OptionMultiple vent/air terminations Description and usage Sidewall termination installation9Concentric Vent Dimensional Drawing Models 400 Multiventing sidewall terminations 11Concentric Vent Sidewall AttachmentVent/air termination vertical Vertical direct ventingMultiple vent/air terminations Prepare roof penetrations4Concentric Vertical Termination Vertical termination installationMm see -9, Multiventing vertical terminationsConcentric Venting Arrangement Alternate vertical concentric venting10Existing Vent as a Chase Existing vent as a chaseChilled water system Hydronic pipingSystem water piping methods General piping information Low water cutoff deviceHydronic piping Near boiler piping components Flow switch adjustmentVariable speed pump option Near boiler piping connectionsCirculator sizing 20F 25F 30F 35F Model Head FeetPressure 7Single Boiler Multiple Temperatures 8Single Boiler Primary/Secondary Piping Manifold Pipe Sizes in Inches mm Number of Units10Multiple Boilers Primary/Secondary Piping Loop Gas connections Connecting gas supply pipingPropane Gas Natural gasInches Check inlet gas supplyGas Pressure Gas valve replacementLow voltage connections Field wiringInstallation must comply with Line voltage connectionsLow gas pressure switch Outdoor temperature sensorLouver proving switch High gas pressure switchModbus Flow switchAlarm contacts Wiring of the cascadeManual Condensate drain Condensate disposalFill and test water system Freeze protection when usedStart-up Check/control water chemistryInspect/check condensate lines and fittings Check for gas leaksCheck thermostat circuits Inspect/fill condensate systemCheck system and boiler Final checks before starting the boilerStart the boiler If boiler does not start correctlyFor Your Safety Read Before Operating Natural Gas Propane Set space heating operationConfiguration of the cascade Verify DHW modeSet domestic hot water DHW operation General Operating informationProtection features Boiler temperature regulation Cascade Outdoor reset operation, if usedOperation Display Sequence of operationStandby, ready to start a new cycle Navigation Dial Knight XL control moduleUser Access modesInstaller Call for Heat Information Dial Function Instructions Maintenance Maintenance and annual startupService technician Inspect boiler area MaintenanceAddress reported problems Clean condensate trap Check all piping for leaksCheck boiler relief valve Flue vent system and air pipingCheck water system Check expansion tankInspect ignition and flame sense electrodes Check ignition ground wiringCheck all boiler wiring Check control settingsModel Kit Part Component Number Description Check flame signalCleaning boiler heat exchanger Review with ownerLOW Voltage 120 VAC High Voltage Diagrams2Ladder Diagram Page KBXII-I-O Rev D
Related manuals
Manual 16 pages 54.19 Kb Manual 48 pages 13 Kb

400, 801 specifications

The Lochinvar 801,400 is a cutting-edge solution in the realm of high-efficiency commercial water heating. This model represents a significant advancement in the design and functionality of water heaters, catering primarily to the demands of large-scale facilities like hotels, hospitals, and large industrial operations.

One of the standout features of the Lochinvar 801,400 is its impressive heating capacity, which can produce up to 801,400 BTUs, making it suitable for high-demand applications. This output is crucial for establishments that require a consistent supply of hot water, such as commercial kitchens and laundry facilities. The robust design ensures that it can handle peak demand periods without compromising performance.

Another significant aspect is the innovative use of advanced technology in its operation. The Lochinvar 801,400 integrates smart controls that enhance its efficiency and ease of operation. These controls allow for precise monitoring and adjustment of water temperatures, ensuring that the system operates within optimal parameters while maximizing energy savings. The intelligent monitoring system can provide real-time updates, making it easier for facility managers to keep track of performance and address maintenance needs proactively.

The construction of the Lochinvar 801,400 incorporates durable materials that not only enhance the longevity of the unit but also offer resistance to corrosion and wear. This durability translates into lower maintenance costs and an extended lifespan for the unit, making it a worthwhile investment for businesses.

Moreover, the Lochinvar 801,400 is designed with energy efficiency in mind. It boasts a high thermal efficiency rating, which reduces operational costs and minimizes the carbon footprint of heating operations. This efficiency is critical in today’s environmentally conscious market, where businesses are seeking to reduce their energy consumption and comply with strict regulations.

The design of the Lochinvar 801,400 also prioritizes safety, featuring innovative safety controls and fail-safes that protect both the unit and the users.

In summary, the Lochinvar 801,400 offers a combination of high capacity, advanced technology, durability, and energy efficiency, making it an excellent choice for commercial water heating solutions. As industries continue to evolve, the demand for reliable and efficient water heating solutions like the Lochinvar 801,400 will only increase.