Lochinvar 801 Set domestic hot water DHW operation, Verify DHW mode, Configuration of the cascade

Page 60

10 Start-up

Set domestic hot water (DHW) operation

Verify DHW mode

There are two (2) modes of operation for DHW. In Normal Mode, when a DHW demand begins, the control will start the DHW pump, turn off the boiler pump (if running), and modulate to bring the outlet temperature to the DHW boiler set point. The maximum firing rate may be limited in this mode if desired.

In Zone Mode it is assumed that the indirect DHW tank is piped as a zone on the primary loop. When a DHW demand begins, the control will turn on the DHW pump output, and raise the system temperature set point to the DHW boiler set point (if higher). The system pump and the boiler pump will be turned on. In this mode, any low temperature zones (such as radiant heating) may need additional controls to limit the water temperature sent to those zones.

Set DHW target temperature

When in the DHW Mode, the control will modulate to maintain the boiler outlet temperature or system supply temperature to a set point. This set point is set at the factory to 180°F. If a different set point is desired, the appropriate parameter in the control must be changed. See the Knight XL Service Manual for a detailed explanation of this procedure.

Set maximum DHW fan speed

If the rated input of the indirect tank is less than the maximum output of the boiler, change the maximum DHW fan speed setting to limit the boiler output accordingly, see the Knight XL Service Manual for a detailed explanation of this procedure.

Set clock

 

 

Please note that the brackets ([]) denote

NOTICE

screen status.

The SMART SYSTEM control has a built-in clock that it uses for its night setback feature and for logging events. This clock must be set when the boiler is installed, and anytime the boiler has been powered off for more than 4 hours. Use the following procedure to set the clock:

1.Press and hold the LEFT SELECT [MENU] key for at least 5 seconds.

2.The display changes to read [PASSWORD], with four (4) zeros below it.

3.Press the RIGHT SELECT [SAVE] key.

4.The display will then show a menu with the time and date and temperature unit.

5.Press the NAVIGATION dial twice.

6.Turn the NAVIGATION dial to adjust the hours. Press the NAVIGATION dial.

Installation & Operation Manual

7.Turn the NAVIGATION dial to adjust the minutes. Press the NAVIGATION dial.

8.Turn the NAVIGATION dial to adjust the month. Press the NAVIGATION dial.

9.Turn the NAVIGATION dial to adjust the date. Press the NAVIGATION dial.

10.Turn the NAVIGATION dial to adjust the year. Press the RIGHT SELECT [SAVE] key.

11.Press the RIGHT SELECT [HOME] key.

NOTICE

The internal clock does not adjust for

Daylight Savings Time and therefore, will

 

require a manual adjustment.

Configuration of the cascade

NOTICE

Please note that the brackets ([]) denote

 

screen status.

 

When installed in a Cascade system, the individual controls must be programmed for cascade operation. This is accomplished by accessing the control parameters.

Press the [MENU] key for at least five (5) seconds. Input the Installer code as described in the Knight XL Service Manual. Once the control parameters have been accessed, use the NAVIGATION DIAL to select the Control Mode parameters. Press the NAVIGATION DIAL to access these parameters.

Rotate the NAVIGATION dial to select the parameter “Cascade Address”. Press the NAVIGATION dial to access this parameter. Each appliance in the Cascade system must be programmed with its own address. The boiler designated as the Leader will have an address of 0. The remaining boilers in the Cascade will be Members and have addresses from 1 - 7. Rotate the NAVIGATION dial to select the appropriate address. Press the RIGHT SELECT [SAVE] key. If installing the boilers in an existing system, the new boilers should be programmed as the Leader and/or the higher number addresses.

Press the RIGHT SELECT [HOME] key to upload the address into the control. Repeat this procedure for all boilers in the Cascade, designating the Leader control and the Member controls.

60

Image 60
Contents Models 400 Contents When servicing boiler Please read before proceedingKnight XL How it works Stainless steel heat exchangerModel Models 601 Ratings Knight XL Boiler =B=R RatingInstallation must comply with Closet and alcove installationsDetermine boiler location Before locating the boiler, checkAlcove Installation Residential garage installation Provide air openings to roomVent and air piping Flooring and foundationWhen using an existing vent system to install a new boiler Products to avoidAreas likely to have contaminants When removing a boiler from existing common vent system Prepare boiler Remove boiler from wood palletGas conversions Model Models 601 Leveling the boilerGeneral venting Direct venting options Vertical Vent Install vent and combustion air piping Requirements for installation in CanadaInstalling vent or air piping General ventingPVC/CPVC air intake/vent connections Vent Pipe, and FittingsAir inlet pipe materials Stainless steel ventFasNSeal Saf-T Vent Stainless Steel Air Intake/vent ConnectionsOptional room air Removing from existing ventModel Description Kit Number Air contaminationIf using the alternate sidewall termination Sidewall direct ventingVent/air termination sidewall Determine location3AClearance to Gravity Air Inlets Prepare wall penetrations Bird Screen TypicalPrepare wall penetrations Alternate Field Supplied Option Multiple vent/air terminationsTermination and fittings Sidewall termination installation Description and usage9Concentric Vent Dimensional Drawing Models 400 11Concentric Vent Sidewall Attachment Multiventing sidewall terminationsVertical direct venting Vent/air termination verticalPrepare roof penetrations Multiple vent/air terminationsVertical termination installation 4Concentric Vertical TerminationMultiventing vertical terminations Mm see -9,Alternate vertical concentric venting Concentric Venting ArrangementExisting vent as a chase 10Existing Vent as a ChaseHydronic piping System water piping methods General piping informationLow water cutoff device Chilled water systemHydronic piping Flow switch adjustment Near boiler piping componentsNear boiler piping connections Circulator sizingVariable speed pump option Head Feet Pressure20F 25F 30F 35F Model 7Single Boiler Multiple Temperatures 8Single Boiler Primary/Secondary Piping Number of Units Manifold Pipe Sizes in Inches mm10Multiple Boilers Primary/Secondary Piping Loop Connecting gas supply piping Gas connectionsNatural gas Propane GasCheck inlet gas supply InchesGas valve replacement Gas PressureField wiring Installation must comply withLine voltage connections Low voltage connectionsOutdoor temperature sensor Louver proving switchHigh gas pressure switch Low gas pressure switchFlow switch Alarm contactsWiring of the cascade ModbusManual Condensate disposal Condensate drainFreeze protection when used Start-upCheck/control water chemistry Fill and test water systemCheck for gas leaks Check thermostat circuitsInspect/fill condensate system Inspect/check condensate lines and fittingsFinal checks before starting the boiler Start the boilerIf boiler does not start correctly Check system and boilerFor Your Safety Read Before Operating Set space heating operation Natural Gas PropaneVerify DHW mode Set domestic hot water DHW operationConfiguration of the cascade Operating information GeneralProtection features Boiler temperature regulation Outdoor reset operation, if used CascadeSequence of operation Operation DisplayStandby, ready to start a new cycle Knight XL control module Navigation DialAccess modes InstallerUser Call for Heat Information Dial Function Maintenance Maintenance and annual startup Service technicianInstructions Maintenance Address reported problemsClean condensate trap Check all piping for leaks Inspect boiler areaFlue vent system and air piping Check water systemCheck expansion tank Check boiler relief valveCheck ignition ground wiring Check all boiler wiringCheck control settings Inspect ignition and flame sense electrodesCheck flame signal Cleaning boiler heat exchangerReview with owner Model Kit Part Component Number DescriptionDiagrams LOW Voltage 120 VAC High Voltage2Ladder Diagram Page KBXII-I-O Rev D
Related manuals
Manual 16 pages 54.19 Kb Manual 48 pages 13 Kb

400, 801 specifications

The Lochinvar 801,400 is a cutting-edge solution in the realm of high-efficiency commercial water heating. This model represents a significant advancement in the design and functionality of water heaters, catering primarily to the demands of large-scale facilities like hotels, hospitals, and large industrial operations.

One of the standout features of the Lochinvar 801,400 is its impressive heating capacity, which can produce up to 801,400 BTUs, making it suitable for high-demand applications. This output is crucial for establishments that require a consistent supply of hot water, such as commercial kitchens and laundry facilities. The robust design ensures that it can handle peak demand periods without compromising performance.

Another significant aspect is the innovative use of advanced technology in its operation. The Lochinvar 801,400 integrates smart controls that enhance its efficiency and ease of operation. These controls allow for precise monitoring and adjustment of water temperatures, ensuring that the system operates within optimal parameters while maximizing energy savings. The intelligent monitoring system can provide real-time updates, making it easier for facility managers to keep track of performance and address maintenance needs proactively.

The construction of the Lochinvar 801,400 incorporates durable materials that not only enhance the longevity of the unit but also offer resistance to corrosion and wear. This durability translates into lower maintenance costs and an extended lifespan for the unit, making it a worthwhile investment for businesses.

Moreover, the Lochinvar 801,400 is designed with energy efficiency in mind. It boasts a high thermal efficiency rating, which reduces operational costs and minimizes the carbon footprint of heating operations. This efficiency is critical in today’s environmentally conscious market, where businesses are seeking to reduce their energy consumption and comply with strict regulations.

The design of the Lochinvar 801,400 also prioritizes safety, featuring innovative safety controls and fail-safes that protect both the unit and the users.

In summary, the Lochinvar 801,400 offers a combination of high capacity, advanced technology, durability, and energy efficiency, making it an excellent choice for commercial water heating solutions. As industries continue to evolve, the demand for reliable and efficient water heating solutions like the Lochinvar 801,400 will only increase.