Lochinvar 400, 801 operation manual Maintenance, Address reported problems, Inspect boiler area

Page 73

Installation & Operation Manual

12 Maintenance (continued)

￿WARNING

￿WARNING

￿WARNING

Follow the Service and maintenance procedures given throughout this manual and in component literature shipped with the boiler. Failure to perform the service and maintenance could result in damage to the boiler or system. Failure to follow the directions in this manual and component literature could result in severe personal injury, death, or substantial property damage.

The boiler should be inspected annually only by a qualified service technician. In addition, the maintenance and care of the boiler designated in Table 12A and explained on the following pages must be performed to assure maximum boiler efficiency and reliability. Failure to service and maintain the boiler and system could result in equipment failure.

Electrical shock hazard – Turn off power to the boiler before any service operation on the boiler except as noted otherwise in this instruction manual. Failure to turn off electrical power could result in electrical shock, causing severe personal injury or death.

Address reported problems

1.Inspect any problems reported by the owner and correct before proceeding.

Inspect boiler area

1.Verify that boiler area is free of any combustible materials, gasoline and other flammable vapors and liquids.

2.Verify that air intake area is free of any of the contaminants listed in Section 1 of this manual. If any of these are present in the boiler intake air vicinity, they must be removed. If they cannot be removed, reinstall the air and vent lines per this manual and the Knight XL Service Manual.

Inspect boiler interior

1.Remove the front access cover and inspect the interior of the boiler.

2.Vacuum any sediment from inside the boiler and components. Remove any obstructions.

Figure 12-1Condensate Trap

RETAINING

SCREW

2” PVC CAP WITH

BLOCKED DRAIN SWITCH

PVC TEE ASSEMBLY (FACTORY SUPPLIED)

CONDENSATE FROM

HEAT EXCHANGER TO FLOOR

DRAIN

￿WARNING The condensate trap must be filled with water during all times of boiler operation to

avoid flue gas emission from the condensate drain line. Failure to fill the trap could result in severe personal injury or death.

Clean condensate trap

Check all piping for leaks

1.

Inspect the condensate drain line, condensate PVC

 

fittings, and condensate trap.

2.

Remove the PVC cap retaining screw from the PVC cap

 

(FIG. 12-1).

3.

Remove the 2 inch PVC cap with the switch located at the

 

top of the trap (FIG. 12-1).

￿WARNING

Eliminate all system or boiler leaks. Continual fresh makeup water will reduce boiler life. Minerals can build up in sections, reducing heat transfer, overheating heat exchanger, and causing heat exchanger failure. Leaking water may also cause severe property damage.

4.

Remove any sediment in the trap.

5.

Fill with fresh water until the water begins to pour out of

 

the drain.

6.

Replace the cap. Press the cap onto the trap until the cap

 

makes contact with the drain.

7.

Replace the retaining screw.

1.Inspect all water and gas piping and verify to be leak free.

2.Look for signs of leaking lines and correct any problems found.

3.Check gas line using the procedure found in Section 7 - Gas Connections.

73

Image 73
Contents Models 400 Contents Please read before proceeding When servicing boilerStainless steel heat exchanger Knight XL How it worksModel Models 601 Knight XL Boiler =B=R Rating RatingsCloset and alcove installations Installation must comply withDetermine boiler location Before locating the boiler, checkAlcove Installation Provide air openings to room Residential garage installationVent and air piping Flooring and foundationProducts to avoid When using an existing vent system to install a new boilerAreas likely to have contaminants When removing a boiler from existing common vent system Remove boiler from wood pallet Prepare boilerGas conversions Model Leveling the boiler Models 601General venting Direct venting options Vertical Vent Requirements for installation in Canada Install vent and combustion air pipingInstalling vent or air piping General ventingVent Pipe, and Fittings PVC/CPVC air intake/vent connectionsStainless steel vent Air inlet pipe materialsStainless Steel Air Intake/vent Connections FasNSeal Saf-T VentRemoving from existing vent Optional room airAir contamination Model Description Kit NumberSidewall direct venting If using the alternate sidewall terminationVent/air termination sidewall Determine location3AClearance to Gravity Air Inlets Bird Screen Typical Prepare wall penetrationsMultiple vent/air terminations Prepare wall penetrations Alternate Field Supplied OptionTermination and fittings Description and usage Sidewall termination installation9Concentric Vent Dimensional Drawing Models 400 Multiventing sidewall terminations 11Concentric Vent Sidewall AttachmentVent/air termination vertical Vertical direct ventingMultiple vent/air terminations Prepare roof penetrations4Concentric Vertical Termination Vertical termination installationMm see -9, Multiventing vertical terminationsConcentric Venting Arrangement Alternate vertical concentric venting10Existing Vent as a Chase Existing vent as a chaseSystem water piping methods General piping information Hydronic pipingLow water cutoff device Chilled water systemHydronic piping Near boiler piping components Flow switch adjustmentCirculator sizing Near boiler piping connectionsVariable speed pump option Pressure Head Feet20F 25F 30F 35F Model 7Single Boiler Multiple Temperatures 8Single Boiler Primary/Secondary Piping Manifold Pipe Sizes in Inches mm Number of Units10Multiple Boilers Primary/Secondary Piping Loop Gas connections Connecting gas supply pipingPropane Gas Natural gasInches Check inlet gas supplyGas Pressure Gas valve replacementInstallation must comply with Field wiringLine voltage connections Low voltage connectionsLouver proving switch Outdoor temperature sensorHigh gas pressure switch Low gas pressure switchAlarm contacts Flow switchWiring of the cascade ModbusManual Condensate drain Condensate disposalStart-up Freeze protection when usedCheck/control water chemistry Fill and test water systemCheck thermostat circuits Check for gas leaksInspect/fill condensate system Inspect/check condensate lines and fittingsStart the boiler Final checks before starting the boilerIf boiler does not start correctly Check system and boilerFor Your Safety Read Before Operating Natural Gas Propane Set space heating operationSet domestic hot water DHW operation Verify DHW modeConfiguration of the cascade General Operating informationProtection features Boiler temperature regulation Cascade Outdoor reset operation, if usedOperation Display Sequence of operationStandby, ready to start a new cycle Navigation Dial Knight XL control moduleInstaller Access modesUser Call for Heat Information Dial Function Service technician Maintenance Maintenance and annual startupInstructions Address reported problems MaintenanceClean condensate trap Check all piping for leaks Inspect boiler areaCheck water system Flue vent system and air pipingCheck expansion tank Check boiler relief valveCheck all boiler wiring Check ignition ground wiringCheck control settings Inspect ignition and flame sense electrodesCleaning boiler heat exchanger Check flame signalReview with owner Model Kit Part Component Number DescriptionLOW Voltage 120 VAC High Voltage Diagrams2Ladder Diagram Page KBXII-I-O Rev D
Related manuals
Manual 16 pages 54.19 Kb Manual 48 pages 13 Kb

400, 801 specifications

The Lochinvar 801,400 is a cutting-edge solution in the realm of high-efficiency commercial water heating. This model represents a significant advancement in the design and functionality of water heaters, catering primarily to the demands of large-scale facilities like hotels, hospitals, and large industrial operations.

One of the standout features of the Lochinvar 801,400 is its impressive heating capacity, which can produce up to 801,400 BTUs, making it suitable for high-demand applications. This output is crucial for establishments that require a consistent supply of hot water, such as commercial kitchens and laundry facilities. The robust design ensures that it can handle peak demand periods without compromising performance.

Another significant aspect is the innovative use of advanced technology in its operation. The Lochinvar 801,400 integrates smart controls that enhance its efficiency and ease of operation. These controls allow for precise monitoring and adjustment of water temperatures, ensuring that the system operates within optimal parameters while maximizing energy savings. The intelligent monitoring system can provide real-time updates, making it easier for facility managers to keep track of performance and address maintenance needs proactively.

The construction of the Lochinvar 801,400 incorporates durable materials that not only enhance the longevity of the unit but also offer resistance to corrosion and wear. This durability translates into lower maintenance costs and an extended lifespan for the unit, making it a worthwhile investment for businesses.

Moreover, the Lochinvar 801,400 is designed with energy efficiency in mind. It boasts a high thermal efficiency rating, which reduces operational costs and minimizes the carbon footprint of heating operations. This efficiency is critical in today’s environmentally conscious market, where businesses are seeking to reduce their energy consumption and comply with strict regulations.

The design of the Lochinvar 801,400 also prioritizes safety, featuring innovative safety controls and fail-safes that protect both the unit and the users.

In summary, the Lochinvar 801,400 offers a combination of high capacity, advanced technology, durability, and energy efficiency, making it an excellent choice for commercial water heating solutions. As industries continue to evolve, the demand for reliable and efficient water heating solutions like the Lochinvar 801,400 will only increase.