Lochinvar 400, 801 operation manual Set space heating operation, Natural Gas Propane

Page 59

10 Start-up(continued)

Check flame and combustion (continued)

4.Place the boiler into the active position by pressing the RIGHT SELECT [ON] key (FIG. 11-1, page 67).

5.Locate the pinhole button below the RESET button on the display board (FIG. 11-1). Insert a thin wire (such as a paper clip) into the hole and press the button once and hold for 5 seconds to place the boiler into Service Mode. In Service Mode the boiler will fire at ignition speed and will then modulate up to full fire.

6.Insert the probe from a combustion analyzer into the hole left by the removal of the flue temperature sensor.

7.Once the boiler has modulated up to full fire, measure the combustion. The values should be in the range listed in Table 10A below. The CO levels should be less than 150 ppm for a properly installed unit.

If the combustion is not within the specified range, reference the Troubleshooting Section of the Knight XL Service Manual for possible causes and corrective actions.

Table 10A Flue Products Chart

Natural Gas

Propane

 

 

 

 

CO2

O2

CO2

O2

 

 

 

 

8.0% - 10%

3.0% - 6.5%

9.0% - 11%

4.1% - 6.9%

 

 

 

 

8.Once the combustion analysis is complete, test the safety shutoff device by turning the manual shutoff valve to the OFF position and ensuring that the boiler shuts down and registers an alarm. Open the manual shutoff valve, reset the control, and return to Service Mode.

9.Turn the main power off to the boiler and replace the flue temperature sensor into the flue pipe connection.

10.Place the boiler back into normal operation.

￿WARNING You must replace the flue gas temperature sensor to prevent flue gas

spillage into the room. Failure to comply could result in severe personal injury, death, or substantial property damage.

Installation & Operation Manual

Set space heating operation

Determine controlling sensor

For space heating systems, the temperature control can be based on one of three sensors; the inlet, outlet, or system supply sensor. The SMART SYSTEM control is programmed at the factory to control the temperature of the outlet sensor. The control will automatically switch to the system supply sensor once it is connected. If it is desired to base the temperature control on the inlet sensor, the appropriate parameter must be changed in the control. See the Knight XL Service Manual for a detailed explanation of this procedure.

Verify space heat circulator mode

The Space Heating Mode controls both the system (primary) pump (if connected), and the boiler (secondary) pump. When the SMART SYSTEM control receives a space heating call for heat, it turns on the system pump. If the boiler is not heating an indirect DHW (Domestic Hot Water) tank, and the set point is not met, it also turns on the boiler pump. After the space heating call for heat ends, the system pump continues to run for a short period of time. The system pump can be programmed to run continuously, except during outdoor shutdown. If the boiler pump was running, it continues to run for a short period of time as well. These pump delays are factory set to 30 seconds. If different delays are desired, the appropriate parameters in the control must be changed. See the Knight XL Service Manual for a detailed explanation of this procedure.

Adjust set point temperature

NOTICE

Please note that the brackets ([]) denote

screen status.

 

The NAVIGATION dial may be used during normal operation to adjust the space heating and tank set point temperatures.

1.From the Status Screen press the NAVIGATION dial.

2.Turn the NAVIGATION dial counterclockwise to select the appropriate set point.

3.Press the NAVIGATION dial to adjust the temperature.

4.Once the desired temperature is displayed, press the RIGHT SELECT [SAVE] key.

5.If necessary repeat Steps 3 and 4 to make adjustments to additional set points.

6.Press the RIGHT SELECT [HOME[ key to upload the changes.

7.If the RIGHT SELECT [SAVE] key is not pressed, the new settings will be discarded.

59

Image 59
Contents Models 400 Contents Please read before proceeding When servicing boilerStainless steel heat exchanger Knight XL How it worksModel Models 601 Knight XL Boiler =B=R Rating RatingsBefore locating the boiler, check Installation must comply withCloset and alcove installations Determine boiler locationAlcove Installation Flooring and foundation Residential garage installationProvide air openings to room Vent and air pipingAreas likely to have contaminants When using an existing vent system to install a new boilerProducts to avoid When removing a boiler from existing common vent system Gas conversions Model Prepare boilerRemove boiler from wood pallet Leveling the boiler Models 601General venting Direct venting options Vertical Vent General venting Install vent and combustion air pipingRequirements for installation in Canada Installing vent or air pipingVent Pipe, and Fittings PVC/CPVC air intake/vent connectionsStainless steel vent Air inlet pipe materialsStainless Steel Air Intake/vent Connections FasNSeal Saf-T VentRemoving from existing vent Optional room airAir contamination Model Description Kit NumberDetermine location If using the alternate sidewall terminationSidewall direct venting Vent/air termination sidewall3AClearance to Gravity Air Inlets Bird Screen Typical Prepare wall penetrationsTermination and fittings Prepare wall penetrations Alternate Field Supplied OptionMultiple vent/air terminations Description and usage Sidewall termination installation9Concentric Vent Dimensional Drawing Models 400 Multiventing sidewall terminations 11Concentric Vent Sidewall AttachmentVent/air termination vertical Vertical direct ventingMultiple vent/air terminations Prepare roof penetrations4Concentric Vertical Termination Vertical termination installationMm see -9, Multiventing vertical terminationsConcentric Venting Arrangement Alternate vertical concentric venting10Existing Vent as a Chase Existing vent as a chaseChilled water system Hydronic pipingSystem water piping methods General piping information Low water cutoff deviceHydronic piping Near boiler piping components Flow switch adjustmentVariable speed pump option Near boiler piping connectionsCirculator sizing 20F 25F 30F 35F Model Head FeetPressure 7Single Boiler Multiple Temperatures 8Single Boiler Primary/Secondary Piping Manifold Pipe Sizes in Inches mm Number of Units10Multiple Boilers Primary/Secondary Piping Loop Gas connections Connecting gas supply pipingPropane Gas Natural gasInches Check inlet gas supplyGas Pressure Gas valve replacementLow voltage connections Field wiringInstallation must comply with Line voltage connectionsLow gas pressure switch Outdoor temperature sensorLouver proving switch High gas pressure switchModbus Flow switchAlarm contacts Wiring of the cascadeManual Condensate drain Condensate disposalFill and test water system Freeze protection when usedStart-up Check/control water chemistryInspect/check condensate lines and fittings Check for gas leaksCheck thermostat circuits Inspect/fill condensate systemCheck system and boiler Final checks before starting the boilerStart the boiler If boiler does not start correctlyFor Your Safety Read Before Operating Natural Gas Propane Set space heating operationConfiguration of the cascade Verify DHW modeSet domestic hot water DHW operation General Operating informationProtection features Boiler temperature regulation Cascade Outdoor reset operation, if usedOperation Display Sequence of operationStandby, ready to start a new cycle Navigation Dial Knight XL control moduleUser Access modesInstaller Call for Heat Information Dial Function Instructions Maintenance Maintenance and annual startupService technician Inspect boiler area MaintenanceAddress reported problems Clean condensate trap Check all piping for leaksCheck boiler relief valve Flue vent system and air pipingCheck water system Check expansion tankInspect ignition and flame sense electrodes Check ignition ground wiringCheck all boiler wiring Check control settingsModel Kit Part Component Number Description Check flame signalCleaning boiler heat exchanger Review with ownerLOW Voltage 120 VAC High Voltage Diagrams2Ladder Diagram Page KBXII-I-O Rev D
Related manuals
Manual 16 pages 54.19 Kb Manual 48 pages 13 Kb

400, 801 specifications

The Lochinvar 801,400 is a cutting-edge solution in the realm of high-efficiency commercial water heating. This model represents a significant advancement in the design and functionality of water heaters, catering primarily to the demands of large-scale facilities like hotels, hospitals, and large industrial operations.

One of the standout features of the Lochinvar 801,400 is its impressive heating capacity, which can produce up to 801,400 BTUs, making it suitable for high-demand applications. This output is crucial for establishments that require a consistent supply of hot water, such as commercial kitchens and laundry facilities. The robust design ensures that it can handle peak demand periods without compromising performance.

Another significant aspect is the innovative use of advanced technology in its operation. The Lochinvar 801,400 integrates smart controls that enhance its efficiency and ease of operation. These controls allow for precise monitoring and adjustment of water temperatures, ensuring that the system operates within optimal parameters while maximizing energy savings. The intelligent monitoring system can provide real-time updates, making it easier for facility managers to keep track of performance and address maintenance needs proactively.

The construction of the Lochinvar 801,400 incorporates durable materials that not only enhance the longevity of the unit but also offer resistance to corrosion and wear. This durability translates into lower maintenance costs and an extended lifespan for the unit, making it a worthwhile investment for businesses.

Moreover, the Lochinvar 801,400 is designed with energy efficiency in mind. It boasts a high thermal efficiency rating, which reduces operational costs and minimizes the carbon footprint of heating operations. This efficiency is critical in today’s environmentally conscious market, where businesses are seeking to reduce their energy consumption and comply with strict regulations.

The design of the Lochinvar 801,400 also prioritizes safety, featuring innovative safety controls and fail-safes that protect both the unit and the users.

In summary, the Lochinvar 801,400 offers a combination of high capacity, advanced technology, durability, and energy efficiency, making it an excellent choice for commercial water heating solutions. As industries continue to evolve, the demand for reliable and efficient water heating solutions like the Lochinvar 801,400 will only increase.