3 Hydronic piping (continued)

The relief valve, tee and any necessary fittings ￿ WARNING are shipped in the install kit with the boiler

and are to be field installed (FIG. 3-1).

*See the piping illustrations included in this section, FIG.’s 3-4 thru 3-10 for suggested guidelines in piping the outdoor boiler with either zone valves or circulator pumps.

NOTICE

*Please note that these illustrations are

meant to show system piping concept only,

 

the installer is responsible for all equipment

 

and detailing required by local codes.

The outdoor boiler is capable of servicing CAUTION multiple temperature loop systems. It is the

responsibility of the installer to protect the loops with lower temperature requirements from higher temperatures that may be required by other loops.

Relief valve and temperature and pressure gauge installation

Basic steps are listed below to guide you through the installation of the relief valve and the temperature and pressure (T & P) gauge provided with the unit.

1.Install the tee with the 3/4 inch fitting positioned vertically and on the top as shown in FIG. 3-1.

2.Install the relief valve into the 3/4 inch fitting of the tee installed in Step 1 (FIG. 3-1).

3.Install a field provided 5 inch long nipple and tee with the fitting positioned vertically on the top on the downstream side of the relief valve (see FIG. 3-1).

4.Install the temperature and pressure gauge provided with the unit into the top fitting of the tee (a bushing may be necessary) installed in Step 3 (FIG. 3-1).

Figure 3-1Relief Valve / T & P Installation

RELIEF VALVE

TEMPERATURE &

PRESSURE GAUGE

TEE W/FITTING ON TOP (FIELD PROVIDED)

CLOSE NIPPLE (FIELD PROVIDED)

IMG00369

TEE WITH 3/4" FITTING

ON TOP

CLOSE NIPPLE

Near boiler piping components

1.Boiler system piping:

Boiler system piping MUST be sized per the pipe requirements listed in Table 3A. Reducing the pipe size can restrict the flow rate through the boiler, causing inadvertent high limit shutdowns and poor system performance. Flow rates are based on 20 feet of piping, 4 - 90° elbows, and 2 - fully ported ball valves.

2.Boiler system pump w/pump cover:

A Grundfos UPS26-99F pump and pump cover will be provided by the factory (for standard altitude models) as the boiler circulation pump based on 20 feet of piping, 4 - 90° elbows, and 2 - fully ported ball valves.

Outdoor boilers are capable of controlling a variable speed boiler circulator. Variable speed circulators MUST be sized to meet the specified minimum flow requirements listed in FIG. 3-3 on page 15 at full speed.

3.Domestic hot water circulating pump:

Field supplied. The pump MUST be sized to meet the specified minimum flow requirements listed in FIG. 3-3. Consult the indirect water heater operating guide to determine flow characteristics for the selected product used.

4.Boiler isolation valves:

Field supplied. Full port ball valves are required. Failure to use full port ball valves could result in a restricted flow rate through the boiler.

5.Check valves:

Field supplied. Check valves are recommended for installation as shown in FIG.’s 3-4 thru 3-10. Failure to install check valves could result in a reverse flow condition during pump(s) off cycle.

6.Domestic indirect hot water isolation valves:

Field supplied. Full port ball valves are required. Failure to use full port ball valves could result in a restricted flow rate through the boiler.

7.Anti-scald mixing valve:

Field supplied. An anti-scald mixing valve is recommended when storing domestic hot water above 115°F.

8.Unions:

Field supplied. Recommended for unit serviceability.

9.Temperature and pressure gauge:

Factory supplied. The temperature and pressure gauge is shipped loose. It is the responsibility of the contractor to install the temperature and pressure gauge on the boiler water outlet.

10.Pressure relief valve:

Factory supplied. The pressure relief valve is sized to ASME specifications.

11.Boiler purge valve:

Field supplied. The boiler purge valve is used to remove entrapped air from the heat exchanger during start-up.

13

Image 13
Contents Save this manual for future reference Contents Please read before proceeding When servicing boilerStainless steel heat exchanger Outdoor Knight Boiler How it worksModels 151 Model Outdoor Knight Boiler Ahri Rating RatingsDetermine boiler location Installation must comply withBefore locating the boiler, check Outdoor vent / air intake location Flooring and foundation Provide clearancesPrevent combustion air contamination Remove boiler from wood pallet Prepare boilerGas conversions 286 Leveling the boilerHydronic piping Near boiler piping components Near boiler piping connections System temperature sensorCirculator sizing Indirect water heatersPressure FeetModel Minimum Pipe Pump Size GrundfosVariable speed pump setup Smart System / Multi-temperature loop control optionVariable speed pump option UP26-96 FC/VS IFC VS Stratos 1.25 3 xZone #1 Number of Units Model Required Pipe Sizes 6Single Boiler Multiple Temperatures 151 211 286 IMG00374 Number of Units 10Multiple Boilers Non-Zoned Primary/Secondary Piping Gas connections Connecting gas supply pipingPropane Gas Natural gasCheck inlet gas supply Single Unit Natural Gas Pipe Capacity ChartLength of Pipe in Straight Feet for 1/2 PSI Gas Pressure Gas valve replacementInstallation must comply with Field wiringLine voltage connections Low voltage connectionsHigh gas pressure switch Outdoor temperature sensorLow gas pressure switch ThermostatAlarm contacts Flow switch Runtime contactsWiring of the cascade System supply sensor3Low Voltage Field Wiring Connections Condensate drain Condensate disposalStart-up Freeze protection when usedCheck/control water chemistry Fill and test water systemCheck thermostat circuits Check for gas leaksInspect/fill condensate system Inspect/check condensate lines and fittingsStart the boiler Final checks before starting the boilerIf boiler does not start correctly Check system and boiler2Operating Instructions Natural Gas Propane Set space heating operationConfiguration of the cascade Verify DHW modeSet domestic hot water DHW operation General Operating informationHow the boiler operates How the control module operatesProtection features Temperature controlBoiler temperature regulation Cascade Outdoor reset operationOperation Display Sequence of operationStandby, ready to start a new cycle Installer Access modesOutdoor Knight boiler control module UserCall for Heat Operating information Dial Function Service technician Maintenance Maintenance and annual startupOwner maintenance Maintenance Check water system Flue vent system and air pipingCheck expansion tank Check boiler relief valveCheck all boiler wiring Check ignition ground wiringCheck control settings Check flame signalReview with owner Cleaning boiler heat exchangerOiled bearing circulators Model Kit Part Component Number DescriptionPC Interface DiagramsHigh Voltage 120 VAC

151-286 specifications

Lochinvar 151-286 is a high-efficiency water heater designed for both residential and commercial applications. This model stands out due to its advanced technology, user-friendly controls, and robust construction, making it a reliable choice for those seeking to optimize their hot water supply.

One of the key features of the Lochinvar 151-286 is its impressive heating capacity. With a maximum input of 286,000 BTU/hr, it can efficiently meet hot water demands for a variety of settings, including hotels, restaurants, and other commercial facilities. This substantial output ensures that even during peak usage hours, hot water availability is maximized, reducing wait times and enhancing customer satisfaction.

The water heater utilizes a state-of-the-art condensing technology that maximizes efficiency by capturing and utilizing flue gas heat. This process allows the Lochinvar 151-286 to achieve an impressive thermal efficiency rating of up to 98%. The benefit of such high efficiency translates to significant energy savings and reduced operational costs over time, making it an environmentally friendly option as well.

The Lochinvar 151-286 is equipped with a user-friendly control system featuring advanced microprocessor controls. These controls allow for precise temperature management and monitoring, enabling users to set optimal temperatures according to their specific needs. Additionally, the heater includes built-in diagnostics, allowing for easy troubleshooting and maintenance, which minimizes downtime and extends the life of the unit.

Another standout characteristic of the Lochinvar 151-286 is its durable construction. Built with high-quality materials, including a robust stainless steel heat exchanger, this model is designed to withstand the rigors of daily use. The unit also features a compact design, which facilitates easy installation in various locations, whether it be in a utility closet or alongside existing equipment.

Safety features are paramount in the Lochinvar 151-286, with multiple safeguards in place to protect against overheating and other potential issues. The unit is designed to operate reliably, ensuring peace of mind for users who depend on consistent hot water availability.

In summary, the Lochinvar 151-286 water heater combines high capacity, exceptional efficiency, and user-friendly technology, making it an excellent choice for those seeking reliable hot water solutions. Its advanced features deliver performance and durability that stand out in the competitive market of water heating systems.