Burnham LEDV SERIES manual Direct Oil Vent Pipe Pipe Length Burnham Part No

Page 13

6.Intake Terminal Location (Direct Vent only) - Locate Air Intake Terminal not less than 12 inches to the left, right, or bottom of the vent terminal. Do not locate air intake terminal above vent terminal. Intake terminal must be at least 12 inches above grade plus snow accumulation. See Figure 9.

7.The LEDV must be vented with 4" Z-Flex Direct Oil™ Vent. 20 feet is the maximum vent length allowed. The vent pipe is available in 5, 10, 15, and 20 foot lengths. Table 1 lists vent part numbers.

Table 1: Vent Pipe Part Numbers

4" Direct Oil™ Vent Pipe

Pipe Length

Burnham Part No.

 

 

5 Ft.

8113302

 

 

10 Ft.

8113303

 

 

15 Ft.

8113304

 

 

20 Ft.

8113305

 

 

8.The vent system must be completed with the Direct Oil™ Vent Kit, which is shipped with the boiler.

Components of this kit are listed in the Repair Parts Section of this manual.

B.Vent Installation (Direct Vent and Side-Wall Vent)

1.Install Vent Terminal. See Figure 10.

a.After determining the location from previous Section, cut an opening in the wall for the vent terminal.

Combustible wall: 8 inches diameter hole is required to maintain a 1 inch clearance to combustible materials.

Non-combustible wall: 6½ inches diameter hole is required.

b.Secure trim plate to outside wall.

c.Insert the vent terminal through the opening until the stop bead rest against the trim plate.

d.Slide the inside trim plate assembly (fitted with gear clamp) onto the terminal pipe.

Figure 9: Intake Terminal Location

13

Image 13 Contents
81433101R3-3/00 Important Information Please Read this page Carefully Page USA Boilers Table of Contents Pre-Installation II. Unpack Boiler Install Boiler ControlRemove Crate Removal of Boiler from SkidProper Hinge Bracket Installation III. Water Piping and Trim Design and install boiler and system piping toRecommended Boiler Piping for Zoning with Valves Recommended Boiler Piping for Zoning with Circulators General Guidelines IV. Venting / Air Intake PipingDirect Oil Vent Pipe Pipe Length Burnham Part No Vent Installation Vent Connector, Assembled Air Intake Installation Direct Vent only See Figure Page Electrical Electrical and Sequence of OperationsSequence of Operations Schematic Wiring Diagram General VI. Oil PipingSingle-pipe Oil Lines Two-Pipe Oil Lines Two-Pipe InstallationVII. System Start-up Alwaysinspectinstallationbefore Starting BurnerBURNERSTART-UP Remove Test Plug in Flue CollarHints on Combustion Adjust OIL PressureTest Controls Simulate power failure For Heating Serviceman onlySimulate flame failure Simulate ignition failureFiretubes and Combustion Chamber Section Viii Service and CleaningBurner Low water cutoff if so equipped Service Notes Urnham Corporation Regional Offices IX. Repair PartsLedv Boiler Trim & Controls Ledv Boiler Jacket & Insulation Ledv Bare Boiler Assembly PartsRepair KitVent 22Figure Beckett Afii Oil Burner Repair Part LEDV1 LEDV2 LEDV3