NOTICE

All boilers must be installed in accordance with National, State and Local Plumbing, Heating and Electrical Codes and the regulations of the serving utilities which may differ from this manual. Authorities having jurisdiction should be consulted before installations are made.

In all cases, reference should be made to the following Standards:

USA BOILERS

A.Current Edition of American National Standard ANSI/NFPA 31, “Installation of Oil Burning Equipment”, for recommended installation practices.

B.Current Edition of American National Standard ANSI/NFPA 211, “Chimneys, Fireplaces, Vents, and Solid Fuel Burning Appliances”, For Venting requirements.

C.Current Edition of American Society of Mechanical Engineers ASME CSD-1, "Controls and Safety Devices for Automatically Fired Boilers", for assembly and operations of controls and safety devices.

CANADIAN BOILERS

A.Current Edition of Canadian Standards Association CSA B139, "Installation Code for Oil Burning Equipment", for recommended Installation Practices.

This boiler is suitable for installation on combustible flooring. Boiler cannot be installed on carpeting.

F o r o p ti mu m p e r fo rm a n c e a nd s e rv i c e a b ility fr om th is u nit adh e r e to th e fo llo w in g recommendations:

A.Do not tamper with or alter the unit or controls. Retain your contractor or a competent serviceman to assure that the unit is properly adjusted and maintained.

B.Clean firetubes at least once a year - preferably at the start of the heating season to remove soot and scale. Inside of Combustion Chamber should also be cleaned at the same time.

C.Have Oil Burner and Controls checked at least once a year or as may be necessitated.

D.Do not operate unit with jumpered or absent controls or devices.

E. Do not operate unit if any control, sw itch, component, or device has been subject to w ater.

4

Image 4 Contents
81433101R3-3/00 Important Information Please Read this page Carefully Page USA Boilers Table of Contents Pre-Installation Install Boiler Control II. Unpack BoilerRemove Crate Removal of Boiler from SkidProper Hinge Bracket Installation Design and install boiler and system piping to III. Water Piping and TrimRecommended Boiler Piping for Zoning with Valves Recommended Boiler Piping for Zoning with Circulators IV. Venting / Air Intake Piping General GuidelinesDirect Oil Vent Pipe Pipe Length Burnham Part No Vent Installation Vent Connector, Assembled Air Intake Installation Direct Vent only See Figure Page Electrical Electrical and Sequence of OperationsSequence of Operations Schematic Wiring Diagram General VI. Oil PipingSingle-pipe Oil Lines Two-Pipe Installation Two-Pipe Oil LinesAlwaysinspectinstallationbefore Starting Burner VII. System Start-upBURNERSTART-UP Remove Test Plug in Flue CollarAdjust OIL Pressure Hints on CombustionTest Controls For Heating Serviceman only Simulate power failureSimulate flame failure Simulate ignition failureFiretubes and Combustion Chamber Section Viii Service and CleaningBurner Low water cutoff if so equipped Service Notes IX. Repair Parts Urnham Corporation Regional OfficesLedv Boiler Trim & Controls Ledv Boiler Jacket & Insulation Ledv Bare Boiler Assembly PartsRepair KitVent 22Figure Beckett Afii Oil Burner Repair Part LEDV1 LEDV2 LEDV3