Ariston A/27 MFFI, A/23 MFFI, 47-116-12, 47-116-10 installation instructions Coaxial System

Page 13

 

Exhaust Type

Maximum Extension Diameter of Pipes

Use of a Restrictor

Risk of Condensation Forming

 

Exhaust/Air

(mm)

on the Discharge Side

 

 

 

 

 

 

 

 

 

 

C12 (xx)

4 m

ø 60 /100

L* < 0.5 m

 

Coaxial

 

 

 

 

 

System

C32 (xx)

4 m

ø 60 /100

L* < 0.5 m

 

 

C42 (xx)

4 m

ø 60 /100

L* < 0.5 m

 

 

 

23 kW

27 kW

 

 

 

 

 

 

 

 

 

 

 

C12 (xy)

54 m

46 m

ø 80

L < 7 m (23 kW) L < 5 m (27 kW)

L > 4 9 m (23 kW) L > 6.5 m (27 kW)

 

C32 (xy)

54 m

46 m

ø 80

L < 7 m (23 kW) L < 5 m (27 kW)

L > 4.9 m (23 kW) L > 6.5m (27 kW)

Twin Pipe

 

 

 

 

 

 

Systems

C42 (xy)

54 m

46 m

ø 80

L < 7 m (23 kW) L < 5 m (27 kW)

L > 4.9m (23 kW) L > 6.5m (27 kW)

 

C52 (xy)

17 m

17 m

ø 80

L < 7 m (23 kW) L < 5 m (27 kW)

L > 4.9m (23 kW) L > 5.3m (27 kW)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(*) L = Length of Piping

In calculating the lengths of the pipes, the maximum length must also take into consideration the values for the exhaust/air intake end terminals, as well as 90° elbows for coaxial systems.

The C52 types must comply with the following requirements:

1.The discharge/intake vent pipes must have the same diameter of ø 80 mm.

2.The maximum combined flue length is 17 m. In this case the minimum length for the air intake pipe is 1 meter; the maximum length of ver tical exhaust pipe must be a maximum of 12 m.

3.If an elbow is inserted into the discharge/ventilation system, the calculation of the overall extension must take into consideration the values for each curve, as indicated in the table.

4.The exhaust pipe must extend at least 0.5 m above the ridge of the roof if it is located on a side other than that for the air intake (this is not obligatory if the exhaust and air intake pipes are located on the same side of the building).

B023

13

Image 13
Contents Mffi A/27 Mffi Table of Contents General Instructions General InformationMffi Technical InformationOverall View Mffi A/27 MffiReference Standards Siting the Appliance InstallationClearances Overall DimensionsElectrical Connection Mounting the ApplianceGas Connection Water Connections Safety Valve DischargePipe Work By-pass Mains Water Feed Central Heating Flue Connections Filling Terminal Position B023 Coaxial System Room Thermostat Connection Colours Electrical DiagramB023 Mffi Commissioning Water Circuit DiagramInitial Preparation Filling the Heating SystemControl Panel Removing the Front PanelSelector Knob for Summer/Winter/Flue Analysis Modes Checks to be run before initial start-up are as follows Initial Start-up Operational AdjustmentsCirculation Failure Ignition FailureOverheating Safety Shut-off GAS AdjustmentsDraining the System Limescale Build-upChanging the Type of Gas MaintenanceMiscellaneous Wiring Diagram for Two Heating ZonesBlue Wiring Diagram for Connection to Ariston Unvented CylinderB023 B023 B023 Manufacturer Merloni TermoSanitari SpA Italy Cod 99 84 1260 112 B023