2.3Overall Dimensions
465
Legend:
A = Central Heating Flow (3/4”)
B = Domestic Hot Water Outlet (1/2”) C = Gas Inlet (3/4”)
D = Domestic Cold Water Inlet (1/2”) E = Central Heating Return (3/4”)
2.4Clearances
890
| |
| (C) |
365 | Fig. 2.1 |
|
In order to allow for access to the interior of the boiler for maintenance purposes, the boiler must be installed in compliance with the minimum clearances indicated in the diagram below.
A/23 MFFI - A/27 MFFI
400
450
60 |
|
|
| 60 |
40 | 50 | 60 | 70 | 80 |
| C |
|
| C |
|
|
|
| 300 |
Fig. 2.2
B023 | 7 |