Energy Tech Laboratories MR212 manual

Page 2
Image 2 Contents
Installation, Operation, and Maintenance Manual Page Table of Contents Warranty Mechanical InstallationAssembly Site PreparationRoof Mount Installation Installation with Exhaust Fan Recommended Supply Ductwork SizesPage Gas Pressure Table GasGas Connection Sizes Motorized Intake Damper Copper Wire AmpacityElectrical Remote Control Panel Fan to Building Wiring ConnectionOperation Start UpMain Burner Adjustment Yes Adjust pilot flame Lock unit into High fire Heater Start Up SummaryPulley Adjustment Final Start Up ProcedureMaximum RPM and HP Chart Pulley Adjustment Illustration Pulley Setscrew TorquePulley Combination Chart 10 20 IN. BlowerAir Flow Switch Flame Safety ControlFlame Safety Controller DC Flame Signal Sequence of OperationOperation Summary Maxitrol Amplifier High Temperature LimitModulating Gas System Blower Switch Optional Remote Panel CircuitComponents Remote Panel Option Troubleshooting Airflow Troubleshooting ChartBurner Troubleshooting Chart Proper Spark GapRemote Panel Troubleshooting Chart Light Indication Condition Possible CauseTroubleshooting Flowcharts Nothing HappensMaintenance General MaintenanceEvery 3 months Filter Quantity ChartWeeks after startup YearlyPage Factory Service Department Start-Up and Maintenance DocumentationMaintenance Record Job Information