Energy Tech Laboratories MR212 manual Gas Connection Sizes, Gas Pressure Table

Page 8
Gas Connection Diagram

Gas

Installation of gas piping must conform with local building codes, or in the absence of local codes, with the National Fuel Gas Code, ANSI Z223.1 (NFPA 54) – latest edition. In Canada, installation must be in accordance with CAN/CGA-B149.1 for natural gas units and CAN/CGA-B149.2 for propane units.

WARNING: INLET GAS PRESSURE MUST NOT EXCEED PRESSURE INDICATED ON NAMEPLATE. SEE UNIT NAMEPLATE FOR PROPER GAS SUPPLY PRESSURE AND GAS TYPE.

1.

Always disconnect power before working on or near a heater. Lock and tag the disconnect

 

switch or breaker to prevent accidental power up.

 

 

 

 

2.

Piping to the unit should conform with local and national requirements for type and volume of gas

 

handled, and pressure drop allowed in the line. Refer to the Gas Engineer’s Handbook for gas

 

line capacities.

 

 

 

 

3.

The incoming pipe near the heater should be sized to

 

Gas Connection Sizes

 

match the connection on the outside of the unit. Unit inlet

 

 

sizes are shown in the table to the right. Avoid multiple

 

Unit Size

 

Gas Pipe Size (NPT)

 

taps in the gas supply so the unit has a steady supply of

 

Size 1

 

¾”

 

gas at all times.

 

Size 2

 

1”

4.

Install a ground joint union with brass seat and a manual

 

Size 3

 

1”

 

shut-off valve external to the unit casing, as shown below,

 

 

 

 

 

 

Size 4

 

1-1/4”

 

adjacent to the unit for emergency shut-off and easy

 

 

 

 

Size 5

 

1-1/2”

 

servicing of controls.

 

 

 

 

 

 

 

5.

Provide a sediment trap, as shown below, before each

 

 

 

 

 

unit and where low spots in the pipe line cannot be avoided.

 

 

 

 

6.

Blow out the gas line to remove debris before making connections. Purge line to remove air

 

before attempting to start unit. Purging of air from gas lines should be performed as described in

 

ANSI Z223.1-latest edition “National Fuel Gas Code”, or in Canada in CAN/CGA-B149.

7.

All field gas piping must be pressure/leak tested prior to unit operation.

Use a non-corrosive

 

bubble forming solution or equivalent

 

 

 

 

 

for leak testing. The heater and its

Gas Pressure Table

 

individual shut-off valve must be

disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of ½ psi. The heater must be isolated from the gas supply piping system by closing its

Gas Pressure Type

Gas Pressure

Size 1-3 Inlet Pressure

7 in. w.c. – 14 in. w.c.

Size 4-5 Inlet Pressure

7 in. w.c. – 5 psi.

Max. Manifold Pressure - Natural Gas

5 in. w.c. maximum

Max. Manifold Pressure - Propane

2.5 in. w.c. maximum

individual manual shutoff valve

during any pressure testing of the gas supply piping system at test pressures equal to or less than ½ psi.

8. This unit requires a constant 7 in. w.c. minimum natural gas supply, when the unit is operating at maximum gas flow. If the gas supply exceeds 14 in. w.c. (5 psi. for sizes 4-5 housings) it will damage the internal valve components, and if it is below 7 in. w.c., the heater may not perform to specifications.

NOTICE

Refer to the heater rating plate for determining the

minimum gas supply pressure for obtaining the maximum gas capacity for which this heater is specified.

8

Image 8
Contents Installation, Operation, and Maintenance Manual Page Table of Contents Warranty Installation AssemblyMechanical Site PreparationRoof Mount Installation Installation with Exhaust Fan Recommended Supply Ductwork SizesPage Gas Pressure Table GasGas Connection Sizes Motorized Intake Damper Copper Wire AmpacityElectrical Remote Control Panel Fan to Building Wiring ConnectionOperation Start UpMain Burner Adjustment Yes Adjust pilot flame Lock unit into High fire Heater Start Up SummaryFinal Start Up Procedure Maximum RPM and HP Chart Pulley Adjustment IllustrationPulley Adjustment Pulley Setscrew TorquePulley Combination Chart 10 20 IN. BlowerFlame Safety Control Flame Safety Controller DC Flame SignalAir Flow Switch Sequence of OperationOperation Summary Maxitrol Amplifier High Temperature LimitModulating Gas System Blower Switch Optional Remote Panel CircuitComponents Remote Panel Option Troubleshooting Airflow Troubleshooting ChartBurner Troubleshooting Chart Proper Spark GapRemote Panel Troubleshooting Chart Light Indication Condition Possible CauseTroubleshooting Flowcharts Nothing HappensMaintenance General MaintenanceFilter Quantity Chart Weeks after startupEvery 3 months YearlyPage Start-Up and Maintenance Documentation Maintenance RecordFactory Service Department Job Information

MR212 specifications

Energy Tech Laboratories has made significant strides in the field of energy management and efficiency with its groundbreaking product, the MR212. Designed for both industrial and commercial applications, the MR212 stands out for its cutting-edge technology and impressive features that cater to the evolving demands of the energy sector.

One of the main features of the MR212 is its advanced energy monitoring capabilities. Utilizing state-of-the-art sensors and algorithms, the device provides real-time data on energy consumption, helping businesses identify inefficiencies and optimize their energy use. This feature is crucial for organizations aiming to reduce operational costs and minimize their carbon footprint.

The MR212 is equipped with predictive analytics that harnesses machine learning to forecast energy needs based on historical data and usage patterns. This enables users to make informed decisions regarding energy procurement and management, ultimately leading to significant cost savings. Additionally, the system integrates seamlessly with existing infrastructure, making it easy to install and use without requiring a complete overhaul of current operations.

Another notable characteristic of the MR212 is its user-friendly interface. The device features an intuitive dashboard that offers visual representations of energy data, allowing users to monitor performance at a glance. Customizable alerts and notifications help users stay informed of any anomalies or significant changes in energy usage, facilitating prompt action and issue resolution.

The MR212 also supports integration with renewable energy sources, such as solar and wind power. This capability is essential for organizations looking to transition to greener energy alternatives and leverage incentives for using renewable technologies. By integrating seamlessly with these sources, the MR212 not only enhances energy efficiency but also promotes sustainability.

Moreover, Energy Tech Laboratories has ensured that the MR212 is built to withstand industrial environments. With robust construction and compliance with various industry standards, the device is designed for longevity and reliability, providing users with peace of mind.

In conclusion, the Energy Tech Laboratories MR212 is a comprehensive energy management tool that combines advanced monitoring, predictive analytics, and seamless integration with renewable energy sources. Its user-friendly interface and durability make it an ideal choice for businesses seeking to enhance their energy efficiency and sustainability practices. As the demand for smarter energy solutions continues to rise, the MR212 stands at the forefront, paving the way for a more efficient and sustainable future.