TABLE OF CONTENTS |
|
WARRANTY | 4 |
INSTALLATION | 5 |
Mechanical | 5 |
Site Preparation | 5 |
Assembly | 5 |
Curb and Ductwork | 5 |
Roof Mount Installation | 6 |
Installation with Exhaust Fan | 6 |
Direct Fired Module Installation | 7 |
Indoor (INLINE) Installation | 7 |
Heat Module | 7 |
Gas | 8 |
Electrical | 9 |
Motorized Intake Damper | 9 |
Remote Control Panel | 10 |
Fan to Building Wiring Connection | 10 |
OPERATION | 11 |
Start Up | 11 |
Special Tools Required | 11 |
Start Up Procedure | 11 |
Pilot Adjustment | 11 |
Main Burner Adjustment | 12 |
Heater Start Up Summary | 13 |
Final Start Up Procedure | 14 |
Pulley Adjustment | 14 |
Pulley Alignment | 14 |
Proper Belt Tension | 14 |
Pulley Combination Chart | 15 |
Sequence of Operation | 16 |
Flame Safety Control | 16 |
Air Flow Switch | 16 |
Modulating Gas System | 17 |
High Temperature Limit | 17 |
Operation Summary | 17 |
Optional Remote Panel Circuit | 18 |
Components | 19 |
Remote Panel Option | 20 |
Troubleshooting | 21 |
Airflow Troubleshooting Chart | 21 |
Burner Troubleshooting Chart | 22 |
Remote Panel Troubleshooting Chart | 23 |
Troubleshooting Flowcharts | 24 |
MAINTENANCE | 25 |
General Maintenance | 25 |
2 weeks after startup | 26 |
Every 3 months | 26 |
Filter Quantity Chart | 26 |
Yearly | 26 |
28 | |
Job Information | 28 |
Heater Information | 28 |
Maintenance Record | 28 |
Factory Service Department | 28 |
3