Baxi Potterton operating instructions Ecogen 24/1.0

Page 1

User’s Operating Instructions &

Important Warranty Information

Ecogen 24/1.0

Gas Fired Wall Mounted Condensing Boiler

and Power Generator

Please keep these instructions in a safe place.

If you move house, please hand them over to the next occupier.

© Baxi Heating UK Ltd 2010

Image 1
Contents Ecogen 24/1.0 0086 ContentsQuick Reference Guide Default 6am 9am, 11am 12pm & 15pm 22pmEasy menu button Description IntroductionImportant Notes POUGetting Started ProgrammersProgrammable Operator Unit POU POU as a Programmable Room Unit PRUTime Setting Setting the TimeStep Programming the Central Heating Times Setting the Central Heating TimesHighlight ‘Time central heating CH1’ Press the Dial KnobRequired time. Press Display Screen Turn the Dial Knob one clickDial to select Programming the Domestic Hot Water Times Setting the DHW TimesTurn the Dial Knob clockwise To highlight ‘Time hot water’ Dial Knob. The ‘1st Time OFF’ Time will flash. Turn the Dial Menu Button Easy Menu Dial KnobSelecting the Cental Heating Mode Mode Selection/Temp AdjustmentFurther Information Adjusting the Room temperature set point Selecting the Domestic Hot Water DHW modeAdjusting the DHW Tank Temperature Room Temperature SetpointProgramme Lock Holiday modeContents of Other Functions Selecting Temps / mode hot water Selecting Temps / mode CH1Service/Special operation Selecting Diagnostics engineAutomatic reset Resetting the BoilerUser reset Service resetTop 200mm Bottom Left side 5mm Right Side 60mm Front Clearances5mm In Operation List of Error Codes Error CodesNRP AR+Engine head control temperature less than 150 degrees C when Fault Indication Protection & PrecautionCall your Installer or Service Engineer as soon as possible Care of the BoilerBenchmark Commissioning Checklist Installation, Commissioning, Service & RepairLegislation Contact the Electricity ProviderPage Page Baxi Serial Number Date of InstallationBrooks House, Coventry Road, Warwick. CV34 4LL